Monday, 2 September 2024

Bedford-Cambridge Rail Link - need to get Tempsford right and the rest of it! Over to you!

Update 30-10-24

BRTA are nationwide in aspiration. We rely on the public to join and offer to assist/volunteer to help and enable us to do more and better.

Good news from the budget is Government support for East-West Rail, Oxford - Milton Keynes Central from August 2025 (we are told), which means Bedford people will be able to get an X5 to Milton Keynes Central for a train to Oxford and connections or indeed, use the current Bedford-Bletchley shuttle rail service (sometimes bustituted) and change at Bletchley to the new flyover station. Bedford-Oxford 2030 ish. So given we are yet to await a route confirmation for Bedford-Tempsford area-Cambridge (which has a new Cambridge South Station being built for Addenbrookes Hospital area) could be 2040! 

BRTA has always said and supported a 'route east of Bedford via St John's' and 'physical rail connectivity with the existing north-south main line (ECML) at Tempsford, not just 2 interchange stations.

We need elected leaders of Bedford Borough Mayor, Cllr. Tom Wootton, MP Bedford and Kempston Mohammad Yasin and North East Beds MP Richard Fuller, to get together, sing from the same hymn sheet and support our rail route suggestion. Not every inch of old Varsity Line, but first 4 miles east of Bedford is rebuild trackbed for rail use, Willington can be bypassed with 2 new river bridges and a slower speed, and instead of going south of Blunham go north towards A1/Tempsford on an embankment to avoid flood plains and clear the trunk road to head off to the Tempsford plains north of south of Station Road, Tempsford. Thence onwards via the route suggested by East-West Rail itself, serving the Cambourne area and Cambridge for East Anglia et al and those audiences to the Oxford and Bedford corridors and other rail connections. 

Our route with physical rail linkages at Tempsford, would enable north of Stevenage, East Bedfordshire and south of Peterborough to access rail services from where they live without having to change at Tempsford and what goes out, comes back!

We have floated the idea, it is now incumbent of our elected leaders to study, work up and engineer a railway and get it underway and delivered in a 10 year timespan now, not after Oxford-Bedford trains bay at Bedford Midland Station! If they don't, they let Bedford and shire down, traffic congestion is rising, pollution is exasperating health and well being and filling NHS waiting lists as well as taking a toll on wildlife and ecological matters, bird count, butterflies and more, down!

The fact is, these patterns, trends and challenges repeat nationwide. It needs local people to be organised and find the rail alternative. Dualling trunk roads or building motorways, delivers ever more urban congestion and squalor as well as land take which could otherwise be used for farming, wildlife, housing or employment for example. We should not waste our green spaces, countryside and should ensure quality of life in urban areas, retain green spaces, not build avarice every piece of land without thinking about what people want, need and balancing competing issues. 

BRTA needs your support and our umbrella for those who support, enables saving the need to organise a new organisation, but rather get to the proverbial coalface and start campaigning for more and better local, conventional rail link solutions x every region x nationwide! Could you be part of that? Be the answer to whether something will or may happen, as with enough people and funding, we can make even more of an impact together!

Work it up and out!




The BRTA approach: re: https://www.biggleswadetoday.co.uk/news/politics/council/tempsford-new-town-flooding-fears-raised-as-central-bedfordshire-council-voices-concerns-over-proposal-4762186 It is BRTA's contention that all development should be curtailed until the route of the new rail link between #Bedford and #Cambridge via the #Tempsford area is settled once and for all. We have our views of a preferred route, not Northern Route, but 'east of Bedford via St John's' is the flattest, quickest and easiet to recover and do if a determined political will can be achieved? The local MP for Tempsford is Richard Fuller, who seems bent on outright opposition to the rail link, even our route, and yet the equivalent road A421-A428 is being dualled as we write, with no objections except belatedly! The penny drops these roads will deliver urban congestion, air pollution, ill-health and blight, yet with a rail link traffic proliferation on the back of regional development 'happening now' will be held in check and balance. #Oxford-Bedford 2026 onwards, Bedford-Cambridge 2035 is lucky. I may not live to see it, but is the government in a listening mood? If so, local politicians need to grasp our rail route now and promote it. Failure to sing from the same hymn sheet, means investment that may be done, going elsewhere and East Anglia remaining virtually an isolated rail network with existing links via North London and #Peterborough being overheated and defaulting more to roads like gridlocked A14. Join BRTA and add your voice: richard.erta@gmail.com

Friday, 30 August 2024

Northampton, a central place bereft of rail link stewardship!

re: https://www.northamptonchron.co.uk/news/politics/plans-approved-for-525-homes-to-be-built-on-land-the-size-of-34-football-pitches-in-northampton-4761619

We have called for protection of radial rail routes into/out of Northampton. Northampton; 200, 000 population and growing, is geographically central, yet has the poorest rail links and services of any comparable sized place in the country arguably, akin to Bradford, dwarfed by Leeds?

The corridor from Bedford into Northampton Castle Station is critical to protect adequacy for 25KV electrification and noise/vibrations must be sufficient length from new flimsy housing to avoid objections. We have no confidence that safeguarding is active here. 

Even if the majority of these houses are away from the old trackbed, the impact without the railway on local single carriageway roads with congestion gridlock now, will be horrendous.  It seems to us the Council, eager to please housing quotas, is just arbitrarily identifying tracks of land and allocations without serious consideration to 1. what conventional rail could offer and 2. impact on existing highways and air pollution levels without rail choices.

Please write to West Northants Council and Cllrs and demand a better deal for reopening local rail links including Northampton-Bedford and Market Harborough to mitigate rising population and traffic levels impacting everyone. 


The majoritively middle class, rural idyllic is dictating to the compact, urbanised less well off audiences and dumping around the periphery with driving and roads impacting on less well off areas who cannot buy in or out of what constitutes a transport and environmental crisis.

BRTA has spoken with elected councillors over a considerable time and they seem completely not to care about these things. Indeed, they would pit a walkway over a modern local rail link, latter which handles bulk people and goods, and a pathway/cycleway can be slewed in any case, not so easily with a proper railway, yet the gains majoritively more. That is the dilemma facing Northampton, and its people and ideally, Northampton Borough, should have been made a Unitary Council in its own right. Alas, it is being abused by people who are not engaging to get these rail links restored to rebalance development with adequate rail-based transport solutions.

Yours sincerely,


Richard Pill
BRTA CEO
01234 225068

Ps. Don't scapegoat or blame the messenger, but consider the impact of these piecemeal developments in the round more please.  

Sunday, 11 August 2024

Northampton, UK should have radial rail links, not be putting development on top of former rail junctions and corridors! Please help us.

I wish to say that I am saddened by the inadequately funded Local Rail Reopenings Fund and its withdrawal. 

We need more modal- shift back to rail in this country for many good reasons. 
We need local-based rail reopenings to enable more by rail. For that to happen, we need a pro-active vision and plan for protecting select former rail routes and ensuring all tiers of government are doing just that, not the hotch-potch of aspirations and blue-sky thinking, whilst Rome burns with blockages at the local planning level. New towns are all very well, but without new and accessible rail infrastructure (we think of growing Brackley without a rail link) but also this planning application as an example: https://www.bbc.co.uk/news/articles/cly952732jeo 
It potentially impinges on the former shared access route into Northampton from both the Bedford and Wellingborough corridors. Space must be for adequate clearances and minimising vibrations and noise impact on development, enabling 25KV electrification and ensuring the rails can be put back. 
This is far from the case and in the example of Northampton-Market Harborough, despite a Network Rail Study done in 2020, we only got to see it due to 2 FOI applications and even then redacted. We need Local Government on board with us, but somehow that does not seem to be the case. Northampton says it wants to link with the forth-coming East-West Rail, but that is only a change at Bletchley, Cambridge and Bedford-wise, direct rails for passenger (Thameslink) and freight, makes more sense direct to Bedford. 
On East-West Rail, we object to the proposed Northern Route E as hilly, not fit for purpose and in our view, it would be far better for the old route, 'east and of Bedford via St Johns' to be looked at for reopening which is shorter, flat and direct to either north or south of Station Road, Tempsford with physical rail linkages for North-South to/from East West Oxford Arc Corridors interaction for passenger and freight usage/market potential.
If you wish to meet with a delegation, I am happy to discuss and explore. 
I have been campaigning since 1985 on these related issues and believe the whole country, the issues, models and challenges replicate, due to a lack of joined-up and through thinking of procedures. We make high-sided fences and barriers demanding studies, costs which rule out lay people and yet, if Government were to for environmental, land use, efficiency and other benefits select a move towards more by rail and follow-on from such a modal shift policy, engagement could align and plan-implement more to achieve this. 
Haverhill is an example of a new town, no rail/closure coinciding and that is a missed opportunity and repeats across the country. 
I appeal for you to look at these things again and work constructively with us. Thank you. Join our loop via richard.brta@gmail.com

Wednesday, 31 July 2024

Press Release BRTA ‘disgusted’ at recent Chancellor’s Statement withdrawal of Rail Reopenings Fund

 

                                                                            31 July 2024 

 Press Release

 
BRTA ‘disgusted’ at recent Chancellor’s Statement withdrawal of Rail Reopenings Fund
 
Whilst BRTA is supposed to be strictly non-party political, we do praise and criticise any political outlet we may disagree with.
 
BRTA is particularly ‘disgusted at the recent decision by Rachel Reeves MP, Chancellor of the Exchequer to cut the Local Rail Reopenings Fund, a mere £500 million for the whole of Great Britain. In times when Government is charged with putting the environment first, to cut emissions and traffic on our roads, chopping this pro-positive local rail expansion budget seems to fly in the face of environment ‘centre of all we do’ and is a petty ‘tit-for-tat’ cut a road Scheme (Stonehenge) with a nationwide cull on local rail expansion? This means all the scattered development expansion ambitions of government are more likely to be unsustainable with green aesthetical window dressing, but not modal shift without sweating the existing rail network which has glaring gaps in it and which leaves large urban and rural communities, thanks to the 1960’s closures, without local rail access in a modern context.
 
BRTA calls for Government and Treasury to think again on this matter and put land use and the environment first in transport and planning sequestrations and integrations, not just ad hoc sprawls.
 
End of Press Release
 

Contact Richard Pill BRTA Media Spokesperson: 

07706600062 richard.brta@gmail.com


 

Thursday, 4 July 2024

BRTA Sheffield Forum Saturday 29th June 2024 by Simon Barber of BRTA:

20-07-24

This article makes a good case for expanding the rail network in the Sheffield area. Obviously we want the Sheffield Victoria open and Don Valley Rail and Stocksbridge. Sheffield needs an orbital railway to enable more freight coming through the area not to take up paths which passenger services need. Personally, LRT should be on road space as per Manchester i.e. it is extra!
Electrification of the Midland Main Line to Sheffield and Leeds with a seamless service cutting out some of the changes to get south and north. So for example Luton Airport, Leicester, Sheffield and Leeds. They should have choice to ECML and MML could make more of a contribution. 

I hope you will respond to the article and encourage these things and keeping medium long term options open like route protection, like studying to explore modern cases in the modern context, not floundering on past glories and constantly putting off until routes are lost and other priorities take over. We need an optimal rail reach and range if model shift is to be realised in a generation. Campaigns which endure are well organised, peopled and delegate to ensure more.


BRTA Sheffield Forum Saturday 29th June 2024 by Simon Barber of BRTA:

I attended the Sheffield Forum which was held at the Benjamin Huntsman pub (Wetherspoons), and there were also our members David Ferguson and Christopher Hyomes. Four other attendees came (as per our Attendance List) - Andy Faulkner (Minsters Rail), Chris Bell (Don Valley Railway), Nigel Kavanagh-Brown (MEMRAP) and Dr Jonathan Coghill. The following matters were discussed:

Don Valley Railway and Woodhead - One freight train every day to Stocksbridge steel works and the line is in very good condition. However, tram-trains could be up-graded for Stocksbridge, and heavy rail in the long-term also from Stocksbridge to Penistone. There is pressure to re-open Sheffield Victoria, since Sheffield MIdland is heavily congested.

Peak Rail (Matlock - Buxton/Chinley) - These could be used for both fast and slow trains, plus stone traffic. The new East Midlands mayoralty covers both Nottinghamshire and Derbyshire (but not Leicestershire) and they are now in favour of Peak Rail. The Peaks and Dales Railway (MEMRAP campaign) now has links with local universities.

Minsters Rail - This seems to be high on the lists, whilst the Humber estuary often gets flooded - also some of the East Yorkshire communities will be reconnected to the rail network and the A1079 York-Beverley Road suffers from traffic congestion.

Harrogate-Ripon-Northallerton: The Harrogate-Ripon should be the first stage of the reopening since many Ripon residents commute to both Harrogate and Leeds. The 1 mile of a Ripon bypass has taken track and then work on a diversion to Thirsk, since there were some developments at Northallerton - both Thirsk and Northallerton would de-clutter York.

Christopher Hyomes our BRTA Northern/Yorkshire Area Rep: had suggested that our next meeting should take place in a church hall for which Chris will search one out and then will pay for it. To keep in touch, contact Simon via T: 0208 940 4399 E: simon4barber@gmail.com and Chris Hyomes T: 07971 766207   E: chris.hyomes@hotmail.co.uk





Wednesday, 3 July 2024

BRTA calls for any new government of whatever shade, to switch priorities from roads to rails more!

 
BRTA is concerned that the track-record of previous governments over decades has left the existing rail network depleted, rationalised and run-down and poured £billions into new roads and upgrading roads (A27/A24) which attracts increasing volumes of traffic, makes for more rat-runs across country to join other queues, increasing pressure on land use allocation for endless parking spaces, when we need environmentally and socially to make using public transport (especially more rail journeys) more amenable, affordable and accessible.
 
Key Rail Projects we want support for:
1.      Guildford-Cranleigh-Horsham, the Arundel Curve and a Phase 2 look at the direct line to Shoreham from Horsham with linking bridges and curves included in modern designs.
2.      Polegate-Stone Cross direct line reinstatement/realigned new build to shave 20 minutes end-to-end Brighton-Ashford transits by trains giving more capacity for Eastbourne specific services and challenging the appeal of endless road use.
3.      A new curve from the Tonbridge line towards Gatwick which could link to a host of existing services more than having to change at Redhill all the time.
4.      A study to look at linking Tonbridge with the Guildford Line direct at Redhill and
5.      Electrification of the North Downs Line to enable semi-fast Thameslink services into Guildford and possible Reading as they do likewise to access Horsham.
BRTA believes these projects need a switch from £27 billion new roads fund to pep up the Rail Reopening Fund which was pitted at a mere £500 million for all Great Britain, which is, given a need to cut emissions and congestion, a meagre and unequal recognition of what rail can offer.
6.      A rail link corridor from Tonbridge-Brighton via Eridge, Uckfield and the Lewes area.

End of Press Release

Further Comment: Richard Pill, BRTA CEO 07752 096392 

e. richard.erta@gmail.com  https://ertarail.co.uk/events/