During these turbulent times of Covid19 we reflect that the wheels of Government do not stop turning. Also that the recovery and what platform we base the call to 'build, build, build' on as to whether it is a sustainable platform or laissez-faire ribbon development creep which is lacking in a balance, facilities, strategic public transport infrastructure and critically whether for the sake of the environment, let alone people and communities. Moreover, that we are sending more freight by rail and adding less tonnes to our road networks which backs up adding to congestion and maintenance costs?
The British Regional Transport Association (BRTA) a voluntary unincorporated membership based association seeking to restore strategic missing rail links and improve the environment as a result. We advocate passenger and freight by rail, unblocking our roads and improving air quality we all have to breathe! Enquiries can be sent to E. ceo@brtarail.com
About Me
- British Regional Transport Association (BRTA)/Richard Pill
- Bedford, Bedfordshire, United Kingdom
Monday, 23 November 2020
New Vision for North London and East-West Hertfordshire Connectivity
Sunday, 15 November 2020
Great Central Railway Reopening Project - Support it now, don't let it be thrown away when we really need it!
Notes from ERTA Great Central Meeting Friday 13th November. Disclaimer: Please note, these are notes taken during the meeting and whilst seeking to be accurate, are a guide and not formal per se. I have had to use a new sequestration of numbering to that of the agenda in some cases.
Present: Richard Pill (Chairman), Owen O’Neill (Zoom
Facilitator), Simon Barber, Colin Crawford, Cllr Richard Auger, John Harrison,
Harry Burr, Peter McBeath and Cllr Rupert Frost and Kathy Keeley.
1. Convenors Welcome and any preliminaries: Richard welcomed people to
the meeting.
2. Apologies for absence: Sam Peach, Mike Reed, Cllr Mike Cockerill, Cllr
Mark Graves, Cllr Philip King, Cllr Peter James, Cllr Tim Douglas, Cllr Martin Tett.
3. Report from Mr Sam Peach on progress so far followed by discussion:
Report from Mr Sam Peach was read by Simon Barber. Since last meeting Sam has met with Anthony Swift
of England’s Economic Heartlands (EEH), Their focus is on east-west transport
links. Sam has been doing research on transport along the Great Central Route.
Northants County Council produced 2 documents Page 30-33 Rail Strategy Doc ‘Fit
for purpose’ (?) 2013 circa. It has a bit on north-south links. Cost in 2013
but under considerations given we are nearly 10 years on from the assumptions
of these old docs. North Northants Planning Unit has also been engaged with.
There will be a general review of policy to bring things up to date. Anthony Swift
advised Sam to look at South Midlands Multi Modal Study which is about 15 years
old. Next steps are to build the economic and social case. A discussion then
followed: Sam’s study to include:
a. assessment of households along the route
b. economic benefit of re-railing
c. re-railing costs
d. freight/new to rail benefits and capacity creation for more by rail
elsewhere too
e. Sam will seek MP and Council interest
f. will also read transport docs released by councils.
4. Discussion was had on Mr Chris Heaton-Harris MP, MP Daventry area and
Rail Minister. Remembering that MP’s and
getting them on board (Andrea Leadsom, South Northants, Chris Heaton-Harris,
Daventry, Mark Pawsey, Rugby, Alberto Costa, Lutterworth, Narborough).
Harry Burr, a resident from Towcester has run a campaign for a station on
the existing West Coast Main Line (WCML) at Weedon near Daventry as a Parkway
Station for the town. It had courted media and widespread coverage and popular
support. We congratulated him on his sterling efforts and wished him well. He
is just 13 years old, but given Daventry is one of the largest towns without a
station, is a much deserving candidate to be taken seriously for better rail
connectivity.
5. A discussion was then had around Northampton-Market Harborough:
Pros for the rail link were things like:
a. Brixworth – 10, 000 new houses to be built, and with an average of 2.5
cars per household, that traffic along the A508 will end up being congested at Northampton
or elsewhere adding to a problem.
b. The rail link would enable East Midlands-DIRFT freight and beyond
access
c. Would link as part of a through link between Oxford-Milton
Keynes-Northampton-Leicester/East Midlands and vice versa, shaving time,
opening more by rail journey opportunities
d. Would take on M1 (Northampton-Leicester) giving rail choice currently
not available.
Against it was felt:
a. Local People don’t want it / object
b. Chris Heaton-Harris (who may have been written to) is against it
c. A cycle track occupies much of the route/now used for non-rail
purposes
Owen O’Neill said that for that, GC and other projects, there needs to be
Assessment of Benefits including Economic. Discussion was had with Cllr Rupert
Frost.
It was mooted that in rail choice terms, GC approaches Leicester from the
western flank of M1, Northampton-Market Harborough on the eastern flank.
Richard Auger said some have ‘silo views. There’s a need to link to 1.
Local Strategic Plans – rail links and connectivity and 2. Government – where
it wants to go on it. A discussion was had. On the one hand that is fine, but
if Government sits on fence in policy/action terms like the disparity of
funding for new roads v rail reopenings they go against the environment whereas
the whole issue we want is more environmentally-friendly transport able to
carry bulk people and goods and save land for other things. Some people call
Northampton-Market Harborough Railway as ‘Brampton Valley Railway’.
It was felt Climate Change/Climate Change Emergency was an important
aspect for these rail links.
It was said there is a need to break a project down to chunks. Segment
Leicester to Rugby/Rugby-Leicester/Narborough – Owen O’Neil showed slides of
the lie of the land and his proposal of a new-build rail serving Magna Park and
Lutterworth and as an option was broadly welcomed to be shored up and promoted.
If someone comes up with a Plan B, providing the demand and market can sustain
it, we have no real problem with such.
6. Peter McBeath interjected on demand aspects by warning that ports are
being dredged for larger container carrying ships for 23, 000 container
carriage docking and want to use rail majoritively to serve their land
carriage. That sends ripples of demand-supply of capacity and pinch points will
need sorting, new rails and links will be given impetus and this is happening
now and going forward, not some longevity luxury of decades. So, it raises
questions of rail capacity and readiness. We will need lines like Great Central
to help cater for it all sustainably.
7. Richard Pill, Chairing the meeting laid the cards of ERTA on the
table: we can facilitate meetings, bring people together, campaign within
resources and nurture volunteers to inform a team who in turn can take and do
what is necessary as per Sam Peach to take projects on to a next stage.
However, we do not have the resources to commission £100, 000+ studies to tick
all boxes. It is for professionals to conjoin and invest in their (private) and
nations (Government tiers) interests. It is not about our Executive Committee taking
on more work, rather realising new volunteers and them in turn expanding our
ideas and working them to fruition/variables on themes included.
8. Key benefits: It was felt environmental land use, route protection to
keep options open amidst development bombardments not made to take rail intent
into consideration per se and winning over the national political biases. Mr
Simon Barber has a Westminster Team and volunteers are welcome to sign up and
collaborate with him.
9. Peter McBeath made the point that ports expansion and more trains
demand scale. We need more capacity and
alternative routes. Richard said that the scope we felt for the Great Central
re-railing (see map) was Southampton/Bristol-Leicester/East Midlands and all in
between. With M40 on the west, M1 on the east, it is a critical corridor to
re-rail giving capacity elsewhere. Southampton trains have hot spots at Reading
and the Reading/Didcot-Leamington Lines were heavily used, getting to East
Midlands direct and from it without recourse to Birmingham or London would be a
boost for rail and more by rail potentially. ERTA had been seeking discussions
with a number of operators and developers into distribution. Convergys,
Gazeleys and it was recommended we seek to get ASDA Board on board. Could it be
that Owen’s Rugby-Leicester section is the appetiser which brings buy-in for
more south of Rugby beit Banbury and/or Calvert for access to wider links
to/from?
10. Segmental Status’ – as well as the big picture of what we are trying
to achieve with variations on a theme.
a. John Harrison pointed to freight proposal for rail freight terminal
near Hinkley off the Leicester-Nuneaton Line, which could potentially benefit
from the GC link or variations on a theme from the south.
b. Calvert-Woodford Halse. It was suggested that getting a domestic line
alongside the HS2 corridor to serve Brackley area with bus links to Silverstone
was a project in itself with options to Aylesbury, OOC and Oxford for 2-way
commuting for example. Woodford Halse is next up and as a nodal point of area
reference, the connectivity and mutual feed of any Banbury-Daventry-Northampton
arcing rail link would intercept GC corridor and interlinking should be
considered. One suggestion was for Banbury-Rugby (Rugby is a sectional study
issue of access) as a shorter link to achieve than going Oxford-Calvert etc.
ERTA is open-minded, but the Brackley issue, with A43 and expansion remains to
be addressed. Simon said he wanted a meeting with Colin and Brackley Town
Council to try and establish common ground. Woodford does have some blockages
which various opponents have flagged up. Land and growth – we need route
protection and Plan B to be adopted with a conversion from opposition or
neutrality to pro-affirma support for the rail. Discussions with Parishes was
to be welcomed to foster good relations and appreciation of what a railway
could offer and Simon to seek a meeting with Woodford Halse P.C. too.
c. Woodford-Willoughby. Re-railing Great Central has the issue of Catesby
Tunnel and the wind tunnel use of it. Parish Clerk against re-railing options.
d. Getting into Rugby required yes, Rugby to be on board but also,
studies on best options. ERTA has a view.
11. MP’s et al. See elsewhere.
12. Overall it was felt:
a. Getting ASDA on board and similar was worth pursuing:
- ASDA Executive – can they input strategically
- insights
- how to take things forward
- Invest in studies
Be a conjoiner to projects
b. demand and assessment led not just of today, but future forecasting
with a 10-year scope. What will it be without the railway, what contribution
could a railway make positively?
c. Putting together a business case, getting professional support – City
of London and then Westminster. KPMG was mentioned. But we have to have a good
business case first to interest them as investors.
d. Get Amazon on board – they need to start using rail. Warehouses the
size of football pitches springing up everywhere. Simon/Colin to approach these
bodies for preliminary sounding out.
e. Look at Local Distribution Networks and Karl Watts – get him on board
as focuses on Parcels by Rail Services.
13. Owen O’Neil happy to assist with Rugby-Leicester focus after February
and collaborate with Sam Peach.
14. No other business.
15. Date of next Zoom Meeting 29th January 2021 15.00 hours.
Meeting finished 15.40 Richard thanked all for attending.
Note: Clearly a need for focuses respectively. ERTA has a view, a wish, a
plan but can only interject ideas, it is for professionals and those so
orientated to take on board, work up and court wider support. We support Great
Central corridor re-railing with variations on a theme and rebuilding a new
Northampton-Market Harborough rail link and will table meetings and direct
activists and would-be campaigners to those ends as our contribution. People
are welcome to join ERTA as members and offer to volunteer to help us. To
register for the next Great Central Zoom Meeting, please contact Mr Simon
Barber Mr Simon Barber: T. 0208 940 4399, E. simon4barber@gmail.com.
Please encourage others to get involved and liaise with us. My loop via richard.erta@gmail.com is
‘open to all’.
ERTA
can:
1.
Facilitate Zoom Meetings
2.
Plant Ideas
3.
Bring people together
4.
Make suggestions
5.
Input to consultations
6.
Network
7.
Head hunt professionals elected or in business who can take an interest and
move the propositions on to the next stage.
Interim
we do need:
1.
Local and Government (all tier) support for route protection and
realignment/deviation spaces
2.
People to join ERTA as Members - helping us
3.
Offer time and talent as volunteers - things like website maintenance skills,
designing maps and diagrams for general use and helping inform a team more to
take on stewardship and growing support for the bigger picture of re-railing,
with local chunks acting as patchwork places for growing and nurturing
collaboration.
The
issues are massive, but what if we do not re-rail? More development means more
traffic and congestion with pollution and then what? So, now and going forward,
in all interests to cooperate and take heads out of the sand.
Please note, all discussions on Northampton-Market
Harborough rail link are held on the Northampton Meetings. If you wish to also
register for that meeting contact Mr Simon Barber respectively.
Monday, 2 November 2020
ERTA Update November 2020
Good news, that despite lock-down we continue to work around positively with Zoom and Skype Meetings. Indeed, we are drawing in more people via this new-to-us technology than physical meetings tend to do and are saving on cost and time in venue fixtures and associated publicity.
Tuesday, 20 October 2020
ERTA Guildford Meeting 16-10-20 and follow-on notes
The English Regional Transport Association (ERTA) is a voluntary association seeking the re-railing of select closed lines for the betterment of people, places and society. The closures of the 1960's were short sighted, ill-conceived and the legacy is locked-in dependency on roads, vehicles and fossil fuel with congestion, land use parking and emissions a side effect detrimental to public health and generating synthetic demand for more roads and strings of bypasses which free up brownfield land for ever more development then requiring more road capacity. Ancient towns and beauty spots cannot cope with it in normal times and the emergent society from Covid 19 needs to build a better reach and range of options which conserve land and gives transport choice. Guildford-Cranleigh-Horsham is one such strategic missing rail link.
Disclaimer please note: These are notes taken
during the meeting for a rough guide only. I took them down alongside the meeting.
They are intended to help bring out what was discussed generally and direct our
thoughts to next steps ideally of what we can all respectively do. Again,
apologies in advance if I’ve missed any name off or got them mixed up. If you
wish for amendment, please email specifics to richard.erta@gmail.com
Present: Richard Pill (Chairman of ERTA), Colin Crawford, Simon Barber,
H. Trevor Jones, Rob Cooke, George Potter, Ramsey Nagaty, Kathy Keeley, Zoe
Franklin, Cllr Alison Griffiths, David Daniels and others.
1. The Chairman welcomed everyone to the meeting.
2. Apologies for absence: Transport for the South East, Russell Spink,
Lucy Dixon-Thompson, Richard Moore.
3. Guildford-Cranleigh-Horsham Rail Reopening.
a. H. Trevor Jones of the Guildford Rail Users Group had objected to the
canal threat with others. The rail link has strategic value. There is a port at
Shoreham and potential for freight is another aspect. The benefit of access via
Guildford and Reading avoiding London is another plus point. This would free up
capacity. New spur would be needed at west of Horsham. Cycle and canal lobbies
want the sole use of the old trackbed with walkway retained. Whether in some
cases the old route can be widened out and/or waterways and cycle paths slewed
around the railway requirement, remains to be seen.
b. Getting around Cranleigh: A major issue. On the one hand Cranleigh
could gain by a rail link for things like ease of commuting, on the other,
subsequent development now and on-going, means the old route is blocked and
realignment is an issue. If you go west from the north, how easy is it to
re-join the old route south? Cranleigh is due for expansion as per Dunsfold.
It was suggested we need definitive list of what, where to consider. ERTA
would work on this, but it was suggested that we are not resourced to do much
of it as we live away from the area, lack means-ways and would need more
volunteers on the ground knowing what to put in the inventory for example.
Gardens backing onto old trackbed do not of themselves block reopening, but may
be objectors and/or to canals and other uses, but also could deter widening in
those places. Cllr Griffiths said also we need a series of questions and list
and GIS Mapping could include this scheme.
LRT another option, unsure of compatibility with freight, but also cost
comparatives and examples elsewhere of suitability over conventional rail
options. But could enable inclusion of Dunsfold development expansion:
Cllr George Potter of Guildford Borough Council we need a specific idea
of what a study should look at, a list. Guildford, Horsham, Surrey, Crawley,
Cranleigh, Waverley etc.
c. MP’s and other organisations:
Russell Spink of Transport for the South East: russellspink69@hotmail.com
MP’s for Guild are Ms Angela Richardson,
Waverley (covers canal application) Jeremy Hunt, Horsham is Jeremy Quinn, Mark
Griffiths Arundel Curve.
Concern of air quality and public
transport joined up with trains and buses at Shalford was mentioned.
Suggestion of a standard letter to MP’s
was touted.
e. Volunteers: Kathy Keeley and others
would liaise together as and when and where appropriate.
Matt Furniss was Surrey CC for Shalford.
4. Heathrow Southern Rail Link:
Some were not keen on Wisley having a
station on the Heathrow link as impractical, despite the HRA getting about 1
million visitors per year. They could do better to court the LRT from
Staines-Windsor-Byfleet or more buses. General agreement in sense for the
Southern Heathrow Link to go on to Old Oak Common interchange and – if ERTA had
its way – onwards spur to link onto the Chiltern Main Line. Gives London
orbital Banbury/Aylesbury-OOC-Guildford span of reach and range via the
airport, which could be 24 x 7 with capacity for freight in quieter times away
from residential areas.
5. North Downs Line Link: People unsure
of whether electrification was best idea, good standard trains of whatever
power is what matters surely? Likewise changing at Redhill some felt, not a
problem. ERTA had thought electrification and Thameslink reaching Guildford may
be worth looking at, but no clear view. Mr David Daniels of North Downs Line CRP
said bi-mode trains for the line were being looked at. It is an important link
off the Brighton Line and maybe if we got Guildford-Horsham reopened, a direct
curve from Shalford to Cranleigh and looping round Gatwick from the south could
boost all concerned as well as offering more capacity elsewhere.
6. Tonbridge – Gatwick Curve. Mooted
originally as a HS4 notion with a new route linking Gatwick and Heathrow, ERTA
had floated the idea before as a conventional condiment to our Guildford-Horsham-Gatwick
from the south idea, going on to Tonbridge and Channel Tunnel/Ashford for
example as an extreme reach and range. Not much enthusiasm at the meeting. HS4
was thrown out by DfT, but cost is an issue in context of current situations with
record debt, HS2 and balancing the books at the Treasury.
7. Guildford Current Rail and Bus:
Ramsey Nagaty – frequency of buses and trains at Shalford demand better
connections and tying up of linking services.
Rob Cooke raised the point of platforms
and capacity at Guildford and impact issues of redevelopment, more trains and
through onwards running rather than terminating at Guildford if reopening were
to occur? Generally, a concern was a. would there be more capacity at Guildford
rail-wise and b. impact of redevelopment whether better interchange or less
convenient or congestion? Kathy and Simon raised that we need to put
pedestrians and disabled people at the heart of planning and a bus station near
a railway station is better than segregation? It was noted the debate about
Guildford on these matters had rumbled on a long time. H. Trevor Jones said
they could put in more platforms at Guildford. George Potter said more
platforms and parking are a future contingency and may need to use current
sidings land. Meeting finished
approximately 15.11 and date of next meeting will be Friday 5 February 2021
14.00 hrs. Register via Mr Simon Barber:
T. 0208 940
4399, E. simon4barber@gmail.com
Sunday, 11 October 2020
Time to invest in the Bedford-Bletchley Railway!
Time to invest in the Bedford-Bletchley Railway!
ERTA lauds the collective combination of paid professional and voluntary inputs to making the railway as pleasant as it can be and fostering good will. However, ERTA believes that more needs to be done to make the line even better. Attracting passengers is a good thing, but can be a swing door if we lose them in equal measure. To stem the drain and ease off the constant pressure means people want the following:
Ø
Reliability! People want to be able to rely on the trains service to take
people from where they wish to go and arrive safely at the destination of their
choice. This means trains fit for purpose and which work, happy staffing
relations, a healthy timetable and calling at places they wish to get to. Bank
Holiday and Sunday services and later evening trains have long been called for
here!
Ø
Buses are no substitute for railway services! Since the 1960’s it has
been proven time and again that bus substitutes for rail services are unable to
keep to the timetable and are laden with all sorts of bedevilments as a result.
Every effort must be to make the trains work and keep them working. Studies
should be conducted to assess whether half hourly at peak time would be used.
Ø
ERTA believes that a new station serving and giving access to the Retail
Park at Kempston, Bedford would be of benefit to attract more rail users for
shopping, wider area access and employment opportunities more. It is
disgraceful the station was not opened in the early 1980’s when the Retail Park
opened and even worse that rail users have been denied access ever since.
Wider vision to better integrate opportunities the railway offers:
Ø
ERTA applauds the on-coming of the long-awaited East-West Rail between
Oxford-Bletchley and Bedford and very much hopes in some shape or form it
continued to Cambridge!
Ø
However, it will need to be more than 1 train per hour, more like 2 per
hour and 4 coach trains will soon need doubling to 8 coach capacity, given the
bid for more users and modal shift back from road to rail.
Ø
This means a redesign of Bedford Midland with more baying facilities for
more trains off the Bedford-Bletchley railway with some track alignment to make
the link between St John’s and the Bedford Midland faster and more robust.
Ø
ERTA believes the best future for the railway would be an infill
electrification scheme and lengthening of halts to 4 coach capacity to enable
more diverse services, perhaps exploiting the end to end aspect of the commute
value the line offers. So, a Watford-Bletchley-Bedford-Corby service should
also be looked at.
Ø
The line needs a freight plan. Laudable that talks are about a rail link
to serve new developments in some quarters, but the reopening of an investment
in Forders Sidings for things like a depot for recycling by rail from glass to
fridge’s, from old cars to paper, materials could be collected and sent for
processing by rail more serving a wide area. Think environment, think rail!
Ø
ERTA believes that the old St John’s site should not be sold off and
redeveloped for housing, rather retained and used for rail related purposes.
Bedford has a chronic lack of capacity for more trains, stabling and parking
for rail users. Congestion across Prebend Street Bridge is rife and a 2-track
solution for more trains between Bedford St John’s and Cardington Road could
help. Also, the possible use of Ford End Road old loco shed site for more
parking and a second booking office could help. If they are lost to other
development, it locks in problems, not solutions! Join our free email loop richard.erta@gmail.com
ERTA News and Views October 2020
The ERTA successful events programme continues and I attach 2 meetings one for the Guildford area and associated South East transport matters and one for Northampton and associated rail related matters.
- London Forum (on Zoom) - this has now been agreed for Saturday, 28 November 2020 from 2-4pm
- Conference (on Zoom) - this has now been agreed for Saturday, 24 April 2021 from 2-5pm (1.30pm start)
Wednesday, 30 September 2020
ERTA Calls for the old Bedford St John's Station Site to be used for railway purposes.
With your kind indulgence, I attach our latest brochure extolling the virtues of saving the old Bedford St John's Station Site for railway purposes. It is the last stub access route for any future Bedford urban centre to Cambridge route and if we allow it to default to housing in-fill, we block it off and render the northern route or bust. A number of engineers I've spoken to have told me they are unimpressed with the northern route for east-west rail and it is time to think again.