From 18-06-2022 above:
ERTA supports the east-west rail project but wants the route east of Bedford to go via the old route east of Bedford St Johns to a new alignment around Willington to link with the physical north-south main line in the Tempsford area. What it does after that is for Cambs to determine. But in any case, a north-east curve from St Neots onto the east-west rail, would enable all south of Peterborough direct rail access to Addenbrookes, Cambourne, Cambridge and possibly Stansted as well as East Anglia, places like Ipswich direct?
We don't agree with a new main line and cramming in on just 4 lines north of Bedford, more capacity and lines will be needed unless you adopt the old route with passenger workings out of two new bays facing south at Bedford Midland (redesigned).
On Bedford-Northampton rail link would have to avoid Olney and so whereas the old Victorian route went curve south to align with Olney, off Stevington Walk to curve north, east of Yardley through Castle Ashby southern estate to link the old route into Great Houghton. That is my thinking, would require a viaduct over Great Ouse north of Lavendon on a south-east trajectory. But consider this: 1. our route into St John's from the east, allows east-Midland Main Line/MML north routing though Bedford Midland, Route E does not. 2. Our route would have a flyover off slow tracks and a new bridge over Great Ouse to cross MML at height (flyover) and off westwards. Route E makes no provision, despite: a. Northampton, part of Golden Triangle b. Daventry International Rail Freight Terminal/DIRFT access/inland port c. WCML access. If passenger trains are scaled back to Milton Keynes Central due to capacity on West Coast Main Line/WCML issues, surely more long freight off Bedford-Bletchley tracks would mess that up too? Therefore Bedford-Northampton 'new' makes a load of operational sense surely with Thameslink arm on the back - old Connex terminating at Rugby?
Open to chat, but Retail Park Station, Kempston should be sacrosanct as would serve more population and direct Ampthill Road congestion, contrast out-of-way Kempston Hardwick? d. via St John's from the east enables direct east-west to flow by rail without all through Bedford Midland, which eases capacity and optimises potential, ditto linking north-south East Coast Main Line/ECML somewhere in the Tempsford area. Rebuild Bedford Midland by all means, but capacity is premium now, so we need to think honestly and strategically. North of Bedford, stations at Oakley, Sharnbrook, Irchester, Burton Latimer, Desborough and Kibworth on the slows as well as Ampthill (south) are required to spread the load in a context of growth alleviate concentrates of traffic like at A428/A6 junction in Clapham Road, which really does throw all vehicles in one proverbial 'basket'!
Always happy to discuss, be invited to round table discussions. But I feel the political spin is to aspire to have cake and eat it, when Northern Route E, does not deliver what is required and playing down, whilst seeking to block the old east-west rail route off with housing, locks-in a straight-jacket. If we are listened to and included, outlets and personnel will find us congenial enough, but if excluded for power or plough-through, we will watch as things unfold and be thoroughly entertained probably!
So, please communicate and give us your support/help keep Bedford's rail options 'open'. For a copy of our Kempston Retail Park Station document, please email richard.erta@gmail.com or any other related matter/join our loop. See https://ertarail.co.uk/publicity/ for our other documents.
Comment: This seems to be rubbish
quite frankly! 1. Cllr Headley has been a board member for a long time and not
once has he ever initiated a meeting or round table with ME, despite my being
involved since the mid 1980's and used to go to his Church at Woodside one of
whose Leaders did live in the Ravensden area. Working together, talking and
exploring options should be seen as healthy, instead we have stealth with
convulsions. "We want a church/solution built on relationships, not
institution". 2. The Mayor could talk and reconsider going east of Bedford
via St John's which would resolve many conflicts and issues and with difficult issues
like Cardington Road, you lobby and grow a coalition to get what is required.
If you look at Cauldwell Street rail bridge, maybe a similar one for Cardington
Road could be done if speed is reduced to 20 mph? What studies for
accommodation? Fenlake Road could be made one-way off Cardington Road as a
slip-way access to London Road? 3. If, as I suspect some say, they want
Oxford-Bedford and will happen, fine, but then that still leaves a. the gap
between Bedford, East Coast Main Line at Tempsford (Sandy is blocked off,
thanks Central Beds Council former Mid Beds District Council) and
Cambridge/East Anglia generally and vice versa. b. More bay or through track
capacity will be needed at Bedford Midland Station with remodelling to
accommodate more trains coming and possibly terminating there. London Commuters
won't want to be held up outside whilst Platform 1 & 2 are occupied by
either passenger trains off East-West Rail or long freights x however many
there is. 4. As someone has said, the east-west rail plan makes no provision
for east-north movements anywhere and coming in via Bedford St Johns area from
the East enables that whilst also allowing non-Bedford Midland/freight to go
east-west without recourse to Bedford Midland. 5. I do not believe if the
Northern Route E is adopted, it will be possibly to put all trains on the slow
lines existing and more lines will be required. So, someone, somewhere is
playing politics, when it is avoidable. Despite challenges, old route is
straighter, flater, quicker and probably saves money. It was preferred route -
notwithstanding new build east of Willington to the Tempsford area now needed.
Again physical links with main north-south main line could enable Peterborough,
Cambridge, East Bedfordshire and Stevenage access to Bedford County Town and
vice versa, why not do it? https://eastwestrail.co.uk/get-in-touch











.png)
.png)


.png)


