Great Central Corridor New Rail Aspiration!
Given the HS2 project and other development has scuppered relaying track on the original Great Central Main Line, ERTA is of the view however, that a new domestic line along the corridor has merit, should be supported, studied and kept open as a viable option.
The new-build domestic rail link would leave the East-West Rail Link east of the proposed new Claydon Junction (linking Aylesbury with Milton Keynes) and west of built Claydon which is expanding as is most of the areas the new line would serve. It would go to the east of Brackley with a Parkway Station adjacent to the A43 with bus links to Silverstone.
A new Parkway Station at Rugby as an interim with phased incremental development or if a major backer sees the bigger picture and does ‘all in one’ as a whole project, a new-build link to the West Coast Main Line (WCML), Northampton Loop and Daventry International Rail Freight Terminal (DIRFT). A new link out of WCML via Magna Park, Lutterworth and linking the existing Leicester-Nuneaton lines in the Narborough area is envisaged.
The scope of the new railway is:
1. The immediate corridor between Old Oak Common-Calvert-Brackley-Rugby-Leicester/East Midlands.
2. Calvert – Rugby has a 3–5-mile population catchment of around 144, 000 plus through journeys and freight.
3. The scope of what this extra capacity creation railway could offer to road and rail enablement to do more by rail is a cordon of scope from London-Southampton-Bristol to Leicester/East Midlands and all in between.
“ERTA believes it is worth government, agencies and others taking an interest and we welcome a consortium of champion backers to buy into the idea and work it up towards delivery. HS2 of nature cannot serve intermediate places like Brackley, but upwards of 15, 000 population needs closer rail access, otherwise we just pour growth onto a road only agenda.” Said Richard Pill, ERTA Chairman and Media Spokesperson.
End of Press Release
Further comment: Mr Richard Pill, ERTA Chairman and Media Spokesperson 01234 330090/richard.erta@gmail.com
Our meetings are open to all, so all welcome.
Agenda for ERTA Great Central
Corridor Re-Railing Project via Zoom: Colin Crawford (hosting a Great Central
re-rail corridor Zoom Meeting: Mobile 07836-693977
E: colin.crawford1@btconnect.com on Thursday 7th July 1pm-3pm. He will send a link and
help disseminate to potentially interested people. Richard to provide an agenda
as a guide.
1. Appointment of a Chair for the meeting (Colin Crawford)
2. Apologies for absence
3. Update by Richard about what the
project is and is not.
4. What we need to succeed and who, what
and how supporters can get it (i.e., not solely Richard):
a. Route
protection/recovery/realignment/new build sections
b. Raising funds for studies/encouraging
others to study
c. Dedicated EEH Officer to make
in-rails to their camp and influence them to support it, study it, poll people,
talent and work towards delivery
d. Any offers to assist Richard in the
effort (email/desktop style)
e. Any particular issues for and
resolutions. See notes below:
5. Any reports on progress on Rugby
(WCML)-Magna Park-Lutterworth-Narborough link up? Any offers to be our agent on
that project and work with others to start progression towards delivery/secure
the route/support/enablement?
6. Rugby Central. Yes, a new link via
Barby to link with WCML/Northampton Loop/DIRFT needed, but could Rugby Central
serve as a nodal Parkway status Station and terminal branch initially unless a
big partner can deliver ‘all in one’?
7. Any other business (related)
8. Day, Date, Time and Place of Next Meeting, ideally a Saturday early September, not the 10th.
Notes:
1. Note: we don’t want any dissent or
against spiel, it is our policy to pursue it as far as it can go. If you
support, get involved, if not, see the vacuum a modal shift needs and Climate
Emergency and get out. We are trying to build a coalition of support, action
and hope.
2. Too long has been spent delaying,
deferring, denying and here, we must ruthlessly commit to supporting, engaging
and enabling please.
3. Studies have been done via numerous
outlets and the case was robust. Development has blocked, but I believe a
route, a new railway to modern standards but not High Speed, able to deal with
diverse passenger and freight capacity, can be found. If we do not bother, it
defaults to roads, more roads, more congestion and ruins the landscape. We must
act now.
4. Join our email loop via richard.erta@gmail.com and join ERTA via https://ertarail.co.uk/become-a-member/
and
ERTA
Agenda for Rugby Forum –
Saturday 9 July 2pm food, 3pm -5pm business Rupert Brooke, 8-10 Castle Street, Rugby, Warks.
CV21 2TP https://www.jdwetherspoon.com/pubs/all-pubs/england/warwickshire/rupert-brooke-rugby
1. Appointment
of a Chair person for the meeting.
2.
Sign the attendance list and welcome, saying names around the table.
3.
ERTA Re-Rail Project: a brief guide to what it is about and what it is not –
Richard Pill
4.
The ERTA Need: more members, more offers to help, to build the local support
base up and encourage support at all levels. How best YOU can help with that,
as we are busy with many other aspects and things. A need for local people to
own and engage with this matter.
5.
Any progress/reports on Rugby-Lutterworth-Narborough (linkage for Leicester etc)
inclusive of Magna Park?
6.
Consideration of solutions to problems, remembering this is in all probability
a new railway, built to modern standards and able to handle passenger and
freight usage, contrast HS2 passenger only with no station between Solihull and
Old Oak Common, however informed, it is both a gap and vacancy for a domestic
railway to fill.
7.
Getting England’s Economic Heartlands (EEH) and Connect Midlands agencies on
board more/any volunteers to bridge between them for winning them over more to
our way of thinking?
8.
Route consideration:
a.
coming off east-west rail east of new Claydon Junction, west of built Claydon
in a context of development expansion a given?
b. A
study is needed to getting around Brackley to the East with Parkway Station
near A43
c.
Woodford Halse is blocked and parish needs winning over – any volunteers.
d.
Rugby Central as an interim nodal point terminus Parkway Station, with a new
link via Barby to join Northampton Loop/WCML somehow, somewhere needs a
specific study/phased, incremental assessment by professionals. Our job is to
grow a team, recruit new members, bring people together and grow local support
at all levels please.
8. Any
other business
9.
Date, Time and Place of Next Meeting: Ideally a Saturday in October.
Please note: ERTA Central Officers can collaboratively foster willing
hosts for meetings and as a result bring people together. Please encourage any
interested people or organisations to email richard.erta@gmail.com to join our loop and/or see our website for
joining details/fill in a flyer.
The Executive Committee cannot be responsible to do it majoritively, to work, it must come from local people. EEH Website is: https://www.englandseconomicheartland.com/
Comments:
No comments:
Post a Comment