Showing posts with label Leicestershire. Show all posts
Showing posts with label Leicestershire. Show all posts

Wednesday, 14 December 2022

Friends of Narborough Station (FONS) Hinckley National Rail Freight Interchange Consultation Comments to Tritax Symmetry

https://www.railfreight.com/railfreight/2022/12/08/fresh-opposition-to-hinckley-rail-terminal-proposals-in-leicestershire/

Friends of Narborough Station (FONS)

Hinckley National Rail Freight Interchange

Consultation Comments to Tritax Symmetry

1.      INTRODUCTION 

1.1 The Friends of Narborough Station is a group of people, whose main aims as defined in our Constitution, are to;

1.2  Act as a User Group and provide support for the Station Adoption Scheme, currently promoted by East Midlands Railway.

1.3  Promote and protect the interests of Users of Narborough Station, with an objective of ensuring that better services are provided by Train Operating Companies – TOCs.

1.4  Work closely in a constructive and responsible manner with TOCs, the Department for Transport and local councils at all levels.  This includes Narborough Parish Council as Stakeholder and Blaby District Council whose area the station serves.

1.5  Monitor demographic changes in particular new housing and commercial developments in the Blaby District Council area and the impact these will have on the station’s capacity and the ability of the surrounding area to cope with such changes.

1.6  Liaise with other public and private bodies, with an interest in rail travel and other associated travel arrangements.

1.7  Take an interest in the Narborough Station Buildings and their surroundings, including the Station Garden and Signal Box.

2.      BACKGROUND

2.1  There are at least ten Existing, Proposed or Planned Competitive Warehouse and Container Facilities already within 50 miles of Hinckley, these are at:

·         Northampton Gateway

·         Wellingborough

·         DIRFT

·         Coventry

·         Hams Hall

·         East Midlands Gateway

·         Magna Park

·         Birch Coppice

·         Landor Street, Birmingham

·         and now proposed at Hinckley

2.2  The developer argues that the project will bring jobs to the area and that employees will not have to travel any significant distances between home and work. This is not true as the unemployment rate in the area, is well below the national average and one of the lowest in England.

2.3  The site would be situated in what is already a heavily polluted area, with the additional road journeys by employees over a 24 hour period making the area even more polluted.

2.4  Light and Noise Pollution would be tremendous with local residents having to suffer at all times of the day and night.  This is in addition to the noise of cranes, lorries and train movements coming into and from the site itself.

2.5  Local people would lose the enjoyment of their long-standing conservation and leisure areas, such as Burbage Common and Aston Firs.

3.      RAIL ACCESS TO THE SITE

3.1  Firstly it has to be discussed that the railway line at the entrance to the site is at present on a 1:162 gradient.  Railway Rolling Stock unless properly braked can “Run Away” on a gradient of 1:330.  This tends to happen in private yards but thankfully not often on running lines, but there have been plenty of instances where it has happened.

3.2  We raise this matter as the Rail Accident Investigation Branch has indicated its concern in their latest Annual Report.  Such incidents happened at Clitheroe in Lancashire as recently as 2020 and at Toton in Nottinghamshire in 2021.

3.3  Will there be a guarantee that a locomotive will always be attached to a train during container handling, and will there be a clearly specified procedure that the fixed brakes are always applied to the train at all other times.  Will the Operator or Network Rail be responsible for ensuring that the running lines are protected by catch points or a sand drag arresting facility.

3.4  The rail junction into the site, will be situated between Elmsthorpe and Hinckley. For safe access, trains will almost certainly be slowed to a stand or to a maximum of 10 mph before being cleared to enter.  Depending on the direction the train is coming from, will mean crossing over the opposite running line.  This will cause a prolonged obstruction of both eastbound and westbound lines, until the train is fully clear of the main running lines and safely into the terminal.

3.5   Trains leaving the terminal will inevitably cause similar delays to passenger trains during the cross over process.  Restarting a 1,500 tonne half mile long train, is not a quick process, particularly in winter time and during adverse weather conditions.  The fact there is a 1:162 gradient to climb, will require extended occupation while the train gets to line speed.  Delays to passenger trains will have to be accepted and will  certainly compromise aspirations by Midlands Connect and others, to provide a more frequent service and thus improve connectivity between the East and West Midlands. 

4.      RAIL OPERATIONS AT THE SITE

4.1  All Freight Train Rail Heads in this country have what is called a “Cripple Road”. These are situated for instance at Power Stations, Mines, Collieries, Oil Terminals, Quarries and other locations where freight trains are loaded and unloaded.  These facilities are where “Red Carded” Wagons and Containers are shunted out of the way in order to prevent delays to both freight and passenger trains.

4.2  Will these facilities be provided and will they be covered?  Will covered facilities be provided for the inspection, maintenance and repair of both locomotives and wagons and if so, what will be the level of noise emitted?  Will wagons have to be lifted by crane making its own noise or will below ground inspection pits be provided?

4.3  In some overseas countries these “Cripple Roads” are called “Sick Roads”. Whatever they are called, their importance in support of a safe operational railway cannot be stressed too highly.

4.4  Will the terminal have an auditable “Fitness to run Certification” procedure in place for all Locomotives and Wagons that depart from the Interchange?

5.      EFFECT ON THE OPERATION OF THE SOUTH LEICESTERSHIRE LINE

5.1  There is no doubt these long and heavy extra trains will have an effect on the operation of the South Leicestershire Line.  We understand the longest trains at present are some 600 metres, the extra trains proposed will be 775 metres long.

5.2  Containers themselves are specified to measure up to 40 feet long and 8 foot 6 inches high.  How many of these will be on one train?

5.3  Whatever Tritax Symmetry may say, the South Leicestershire Line is not a main line and was not built as a main line.

5.4  The line only has three aspect signalling, as opposed to four aspect signalling on a main line.  There are no refuges, no passing loops and no facilities for Bi Directional working.  Putting that simply, it means that any breakdown or other incident could close the line for hours or days.  Who would pick up the bill for its effect on the country’s economy?

5.5  Local residents hear the trains and feel the vibration from freight trains, during the overnight period now.  It could be argued that the railway line was here first.  When residents moved to the area, the trains were not as heavy as they are today remembering it was not a main line with no intention of taking such traffic.

5.6  Has the geology underlying the line been analysed to ensure it is capable of supporting the longer, heavier trains?  Will the additional cost of maintaining the tracks, be picked up by Tritax Symmetry or Network Rail?  If the latter, it will be a cost to the tax payer, remembering that Tritax claim there will be no cost to the tax payer and that every aspect of the project will be 100% privately financed.

5.7  Further constraints are the fact that both Wigston North and South Junctions were some years ago, reduced to single rather than double lead layouts.

6.      EFFECT ON THE OPERATION OF NARBOROUGH LEVEL CROSSING

6.1  FONS has done barrier timings at the crossing and taking into account all current proposals, road closures will increase from the current 20 minutes per hour to 40 minutes per hour.  Timings taken by FONS were from the time the red light flashes (Ordering vehicles and pedestrians to stop) to the barriers going up and the roadway being fully clear again.

6.2  As a result of these timings, a report was published by FONS in 2019 entitled “Will Narborough Be Ready”, which revealed that the crossing was closed to road traffic for an average 16.25 minutes per hour.  The report stated “Whilst this doesn’t sound too much, excessive delays are caused to road traffic, particularly at peak times and if there is a build up of trains”.

6.3  In 2019 there were very few freight trains using the South Leicestershire Line and thus going through Narborough.  There are now up to two freight trains per hour, hence the conservative estimate of barrier down time has increased to 20 minutes per hour.

6.4  FONS has submitted a Freedom Of Information Request to Network Rail, in order to ascertain if barrier timings are electronically recorded.  A key request to Tritax Symmetry and indeed Network Rail, would be for full transparency over the numbers used to calculate line availability and barrier downtime.

6.5  It would also be useful to know the average speed and length of current freight trains, against what is expected of Tritax services.  If slower (As expected due to acceleration from the Interchange) or longer, then downtime will be far in excess of four minutes per train.  It is imperative this information is obtained, so that meaningful, truthful and accurate information is duly analysed.  

6.6  This is a busy crossing for both road and rail traffic.  At peak times, road traffic queues through Littlethorpe towards Whetstone and in the other direction it completely clogs up the narrow roads and two mini roundabouts in the Narborough village area and spills on to the already busy B4114 dual carriageway, thus creating even further dangers.

6.7  The narrow pavements on the approaches to the crossing at school times, see children and adults having to walk on the road in order to proceed.  Being held by the extra trains using the crossing, will create even more congestion and dangers than there are at present for all pedestrians.

6.8  Many of the parents taking and collecting their children to and from school, have younger children and babies in their families.  As they cannot be left on their own at home, this means negotiating prams and push chairs etc. along the busy pavements and if not possible on to the also congested roadway.

6.9  This situation will only get worse and indeed more dangerous, if barrier down times are extended.  The two settlements of Narborough and Littlethorpe are separated by the railway line, although the crossing acts as an important link between the two settlements.

6.10  A flyover was proposed some years ago, but this now would not be possible, due to a housing estate having been built on the Narborough side.

6.11  Tritax Symmetry have taken no cognisance of the impact these half mile long and heavy trains will have on the operation of the crossing, the effect on the village and the overall effect on the community itself.

6.12  It is not good enough to say that nothing can be done to resolve the so called Narborough problem, it is however better accepted that nothing should be done that knowingly makes the situation more dangerous.

6.13  If the Secretary of State does make the wrong decision, money and planning permission will be needed to resolve the so called Narborough problem.  County Highways will have to be involved and at least one Pedestrian Lift, provided at the Level Crossing.

6.14  There are no guidelines for the amount of time that the barrier can be down for. This is an automatic process, with Trains whether freight or passenger always taking priority over road traffic.

6.15 There is a “Right Side Failure” process in place, which means that on occasions when the barriers have failed, the Signaller at the Railway Operating Centre in Derby is not aware there is a problem, until advised by a member of the public.

6.16  Whilst it is the Signallers role to monitor a CCTV screen to check the crossing for any vehicle or other obstacle trapped on the crossing when the barriers come down, is this a pure fail safe system?  Cars and Tractors have been hit recently by trains due to Signallers being distracted and unclear communications between Signallers and Control Centres.

7.      EFFECT ON THE OPERATION OF NARBOROUGH STATION

7.1  FONS has for many years been concerned about many safety aspects about the operation of the station.  The size and weight of trains operating to and from HNRFI and speeding through the station at 75 mph., has as yet never been experienced.

7.2  At present and particularly on windy days, there is a serious danger that people waiting on the platforms could be swept under a train.  This is not a dramatic assertion, but a fact.

7.3  The narrowness of the platforms present their own danger, particularly the widths from the yellow lines to the station buildings.  Waiting passengers are never told to stand behind the yellow lines, as is customary at most other stations.

7.4  Thankfully wagons are no longer of an open type and we do not any longer have passengers showered with coal dust and other materials, since what were called HAA Wagons have been withdrawn.

7.5  There is however still a frightening draught and noise created, made even worse due to few advanced safety announcements being made.  Occasionally when a stopping passenger train is announced and the level crossing barriers come down, a freight train passes through as waiting passengers are moving themselves forward to the edge of the platform.

7.6  Both passenger and freight trains not stopping at the station, are not required to sound their horn.  There are no “W” Warning Signs either side of the station, which FONS considers should be in place to protect both the station itself and the level crossing.

8.      EFFECT ON THE OPERATION OF THE MIDLAND MAIN LINE

8.1  Most passenger and freight trains that come off the South Leicestershire Line and thus head towards Leicester Station and onwards, have to wait for a path on to the Midland Main Line before heading northwards.  This is always to give priority to trains already on the MML.

8.2  Additional trains were introduced by East Midlands Railway a few years ago, in order to provide a better more frequent service between the East Midlands and London St Pancras, in order to boost the East Midlands economy, get cars off the roads and support the government’s levelling up agenda.

8.3  This has resulted in a capacity problem between Wigston Junction and Syston Junction, the route trains to and from HNRFI are planned to use.  There is a rail route for trains to turn right at Wigston Junction, but this has now for some reason been put out of use.

8.4  There has been a proposal to reopen the line for passenger trains to run directly between Burton on Trent and Leicester, known as the Ivanhoe Line.  This would have relieved traffic on the A50 and other roads into and out of Leicester.  This we are told cannot happen due mainly to the foregoing capacity problem between Wigston Junction and Leicester.

8.5  So if we cannot relieve local roads to help the constituents of Leicestershire and Staffordshire, plus the obvious help with the environment, why can capacity be found for long and heavy freight trains hauled by dirty diesel engines?

8.6  In addition this stretch of line will be subject to long delays and closures, when MML electrification is under way north of Market Harborough.  This will be a far more definite project than any plan to electrify the South Leicestershire Line.

9.      SIGNIFICANT ENVIRONMENTAL AND SAFETY FACTORS

9.1  Tritax Symmetry claim the Interchange will have NO impact on the environment or wild life.  We consider this to be a totally unsubstantiated statement.  Tritax Symmetry also claim that Blaby District Council and that Hinckley and Bosworth Borough Council, were both happy with the way measurements were taken.

9.2  Interestingly the outcomes and results of these measurements, have we understand not as yet been disclosed.

10.  OVERWHELMING CONCLUSIONS

10.1  Both of the webinars posed more questions than answers, supplementary questions were not allowed.  There was no mention about passing loops, refuges, bi directional working or that freight trains even today cause delays to passenger trains.

10.2  Tritax Symmetry claim there will be “No Impact” on the environment or wild life and “Little Impact” as far as the railway line was concerned.  No evidence of these claims has as yet been provided.

10.3  Safety matters relating to Narborough Station highlighted by FONS have not been addressed, in fact Tritax Symmetry seem to have no concern about the effect their project will have on the station, the level crossing or indeed the village itself including the overall community.

10.4  A question to be asked relates to the genuine requirement for the use of rail, or is it solely to expedite planning consent.  Could it be there could be railway sidings and other related railway facilities built with all the loss of green belt land, never to be used or even see a train.

10.5  We have highlighted a number of serious problems with this application, with huge implications not just in the Elmsthorpe and Hinckley area, but in an extremely wide radius from it.

10.6  FONS supports the widespread opposition to this proposal from the Leicestershire Parishes and Action Groups, and hopes the Secretary of State, will consider all detailed aspects and unanswered questions, relating to each of the safety and environmental concerns raised in this response.  

ERTA Disclaimer and Background:
 

Hinckley National Rail Freight Interchange Consultation Comments to Tritax Symmetry. See https://www.railfreight.com/railfreight/2022/12/08/fresh-opposition-to-hinckley-rail-terminal-proposals-in-leicestershire/ for background information. For the full response document from FONS, please email requests to richard.erta@gmail.com. But it is clear steep gradients and heavy, long freight trains are not happy bedfellows!  Can lessons be applied elsewhere? E.g. steep gradients on East-West Rail Northern Route E? 

Tritax Symmetry are welcome to email a response via richard.erta@gmail.com 



Wednesday, 25 May 2022

Great Central Corridor Re-Rail Project - a new railway for all!

25 May 2022

Press Release

 

Great Central Corridor New Rail Aspiration!

 

Given the HS2 project and other development has scuppered relaying track on the original Great Central Main Line, ERTA is of the view however, that a new domestic line along the corridor has merit, should be supported, studied and kept open as a viable option.

 

The new-build domestic rail link would leave the East-West Rail Link east of the proposed new Claydon Junction (linking Aylesbury with Milton Keynes) and west of built Claydon which is expanding as is most of the areas the new line would serve. It would go to the east of Brackley with a Parkway Station adjacent to the A43 with bus links to Silverstone.

 

A new Parkway Station at Rugby as an interim with phased incremental development or if a major backer sees the bigger picture and does ‘all in one’ as a whole project, a new-build link to the West Coast Main Line (WCML), Northampton Loop and Daventry International Rail Freight Terminal (DIRFT). A new link out of WCML via Magna Park, Lutterworth and linking the existing Leicester-Nuneaton lines in the Narborough area is envisaged.

 

The scope of the new railway is:

1. The immediate corridor between Old Oak Common-Calvert-Brackley-Rugby-Leicester/East Midlands.

2. Calvert – Rugby has a 3–5-mile population catchment of around 144, 000 plus through journeys and freight.

3. The scope of what this extra capacity creation railway could offer to road and rail enablement to do more by rail is a cordon of scope from London-Southampton-Bristol to Leicester/East Midlands and all in between.

“ERTA believes it is worth government, agencies and others taking an interest and we welcome a consortium of champion backers to buy into the idea and work it up towards delivery. HS2 of nature cannot serve intermediate places like Brackley, but upwards of 15, 000 population needs closer rail access, otherwise we just pour growth onto a road only agenda.” Said Richard Pill, ERTA Chairman and Media Spokesperson.

 

End of Press Release

 

Further comment: Mr Richard Pill, ERTA Chairman and Media Spokesperson 01234 330090/richard.erta@gmail.com


 

Our meetings are open to all, so all welcome. 

Agenda for ERTA Great Central Corridor Re-Railing Project via Zoom: Colin Crawford (hosting a Great Central re-rail corridor Zoom Meeting: Mobile 07836-693977

E: colin.crawford1@btconnect.com on Thursday 7th July 1pm-3pm. He will send a link and help disseminate to potentially interested people. Richard to provide an agenda as a guide.

1. Appointment of a Chair for the meeting (Colin Crawford)

2. Apologies for absence

3. Update by Richard about what the project is and is not.

4. What we need to succeed and who, what and how supporters can get it (i.e., not solely Richard):

a. Route protection/recovery/realignment/new build sections

b. Raising funds for studies/encouraging others to study

c. Dedicated EEH Officer to make in-rails to their camp and influence them to support it, study it, poll people, talent and work towards delivery

d. Any offers to assist Richard in the effort (email/desktop style)

e. Any particular issues for and resolutions. See notes below:

5. Any reports on progress on Rugby (WCML)-Magna Park-Lutterworth-Narborough link up? Any offers to be our agent on that project and work with others to start progression towards delivery/secure the route/support/enablement?

6. Rugby Central. Yes, a new link via Barby to link with WCML/Northampton Loop/DIRFT needed, but could Rugby Central serve as a nodal Parkway status Station and terminal branch initially unless a big partner can deliver ‘all in one’?

7. Any other business (related)

8. Day, Date, Time and Place of Next Meeting, ideally a Saturday early September, not the 10th.

Notes:

1. Note: we don’t want any dissent or against spiel, it is our policy to pursue it as far as it can go. If you support, get involved, if not, see the vacuum a modal shift needs and Climate Emergency and get out. We are trying to build a coalition of support, action and hope.

2. Too long has been spent delaying, deferring, denying and here, we must ruthlessly commit to supporting, engaging and enabling please.

3. Studies have been done via numerous outlets and the case was robust. Development has blocked, but I believe a route, a new railway to modern standards but not High Speed, able to deal with diverse passenger and freight capacity, can be found. If we do not bother, it defaults to roads, more roads, more congestion and ruins the landscape. We must act now.

4. Join our email loop via richard.erta@gmail.com and join ERTA via https://ertarail.co.uk/become-a-member/

and

ERTA Agenda for Rugby Forum – Saturday 9 July 2pm food, 3pm -5pm business Rupert Brooke, 8-10 Castle Street, Rugby, Warks. CV21 2TP https://www.jdwetherspoon.com/pubs/all-pubs/england/warwickshire/rupert-brooke-rugby

1. Appointment of a Chair person for the meeting.

2. Sign the attendance list and welcome, saying names around the table.

3. ERTA Re-Rail Project: a brief guide to what it is about and what it is not – Richard Pill

4. The ERTA Need: more members, more offers to help, to build the local support base up and encourage support at all levels. How best YOU can help with that, as we are busy with many other aspects and things. A need for local people to own and engage with this matter.

5. Any progress/reports on Rugby-Lutterworth-Narborough (linkage for Leicester etc) inclusive of Magna Park?

6. Consideration of solutions to problems, remembering this is in all probability a new railway, built to modern standards and able to handle passenger and freight usage, contrast HS2 passenger only with no station between Solihull and Old Oak Common, however informed, it is both a gap and vacancy for a domestic railway to fill.

7. Getting England’s Economic Heartlands (EEH) and Connect Midlands agencies on board more/any volunteers to bridge between them for winning them over more to our way of thinking?

8. Route consideration:

a. coming off east-west rail east of new Claydon Junction, west of built Claydon in a context of development expansion a given?

b. A study is needed to getting around Brackley to the East with Parkway Station near A43

c. Woodford Halse is blocked and parish needs winning over – any volunteers.

d. Rugby Central as an interim nodal point terminus Parkway Station, with a new link via Barby to join Northampton Loop/WCML somehow, somewhere needs a specific study/phased, incremental assessment by professionals. Our job is to grow a team, recruit new members, bring people together and grow local support at all levels please.

8. Any other business

9. Date, Time and Place of Next Meeting: Ideally a Saturday in October.

Please note: ERTA Central Officers can collaboratively foster willing hosts for meetings and as a result bring people together. Please encourage any interested people or organisations to email richard.erta@gmail.com to join our loop and/or see our website for joining details/fill in a flyer.

The Executive Committee cannot be responsible to do it majoritively, to work, it must come from local people. EEH Website is: https://www.englandseconomicheartland.com/

Comments:

The Pandemic left much undone as did distract, but now we are gradually getting together using zoom for some audiences and physical meetings for others. We do not wish to disenfranchise those not familiar with modern technology, and we aim to value contributions made by all who can contribute in some constructive way.

I attach 2 agendas for 2 meetings. Our meetings are open to all and so all welcome. They will not be going over the same old ground of should we or wait, rather, how to and get to or get out! Development is happening, Government has declared a Climate Emergency and we need a coherent coordinated endeavour to tailor development to protect a course for a new rail route and keep options 'open' more, whilst pressure and influence to encourage all tiers of governance, councils and agencies along with business and developers to invest in seeing what this new rail link could offer and make sustainable whilst balancing public utility with land-use policy and practise. Currently it is a free-for-all and whereas Victorians saw the need for bulk people and goods to go by rail, we have laissez-faire whereby anything goes, whether it is consistent with sustainability principles or not. That must change.

We need as many people as want to help, feel able to contribute, head up and front for us in the labyrinth of interfaces such a monumental challenge informs. It can be done and has to start now. 

In the early 1990's on a sponsored cycle ride, a display at the old Winslow Station, showed a need to support re-railing the Great Central corridor then and people were dismissive saying things like "if we can't get Aylesbury/Oxford-Milton Keynes, what chance Great Central"; but now of course, Oxford/Aylesbury - MIlton Keynes is not only on the cards, but being rebuilt. It is the Great Central corridor's turn, and had a little energy been spent to protect the corridor, we would be better off today as a result. Hindsight is a wonderful thing, efforts to reopen have come and gone, but we must learn, re-start where we are at and see the new opportunity. Essential for road and rail relief but needs acumen to draw-in bigger outlets to take an interest, do the studies we are not equipped to and court government support. It can be done and I welcome any support to help us make progress. We are facilitators and idea planters, but other folks can bridge between what we do and making it a reality please.


Friday, 15 October 2021

Midland Main Line, Leicestershire and Easing Capacity + Leicester Forum

Leicester Forum 2023:

Leicester Forum

The High Cross, Leicester

Saturday 25th February

1pm food, 2-4pm business

Leicester agenda and getting it underway.

The High Cross, 0116 251 9218

103–105 High Street, Leicester

Leicestershire, LE1 4JB  https://www.jdwetherspoon.com/pubs/all-pubs/england/leicestershire/the-high-cross-leicester






https://ertarail.co.uk/events/ 

Clearly most of us want the electrification from Bedford-Corby/Market Harborough extended to Leicester, Nottingham and Sheffield and inclusive of Leeds as a logical part of the Midland Main Line. More passenger and freight needs to go by rail for good reasons including, of course, cutting emissions more through choice and access/affordability and thence reducing overall contributions to CO2. Moreover, by improving our rail network, we free up road space for those who have to drive. 

ERTA sees Leicester as strategic. Roads are congestion into and around it, whilst existing rails are at capacity with demand for more by rail growing to a welter which on current lines cannot be serviced and HS2, love it or loathe it, will take another 10 years of growth before any relief claim can be substantiated. 

Our interim agenda is as follows:
1. Reopen a Northampton-Market Harborough rail link which would link East Midlands with the West Coast Main Line more and enable Oxford-Milton Keynes-Northampton - Leicester/East Midlands flows by rail. M1 plies MK-Northampton-Leicester and beyond, yet we don't have a direct rail alternative.
2. Stations for park and ride access to the rail network in growing locations like Desborough and Kibworth, need studies and case-making/grant applications and land use tailoring to ensure the growth does not scupper identification of sites. Remember, a location today, unless protected, could be lost.
3. Great Central access at Narborough for Old Oak Common-Calvert-Rugby-Lutterworth-Leicester-Nuneaton line makes sense as well for direct access which HS2, as High Speed, does not give access to interim places. They are growing along the corridor including Magna Park and elsewhere and so keeping re-railing options open is again where planning can be useful if not essential. For example, a blockage today could be relocated and land used for a rail purpose may not lend itself today, but what about 20 years of planning? The Climate Emergency won't wait, the system gets clogged up and too slow and a trading of reports and systems needs counter-balancing with pragmatism and some basic common sense. Traffic is flowing thus, no rail alternative parallel to, so we work to nurture that rail opportunity more.
4. Leicester-Burton commuter Ivanhoe Link: Surely we do need a direct curve from Leicester to run directly onto that line to fulfill the optimum market? So relocation should be being planned and negotiated now, to enable that access to be regained going forward. But interim, the line offers a bypass to Leicester for some freight like MML-Knighton-Burton-Derby and beyond and vice versa, so Leicester as well as Leicester centric freight, can also entertain joined-up passenger services. Does it make any sense to have to change at Kettering to access East Midlands by rail from Bedford, which is due to be on a principal East-West Rail within 10 years? People need better and cost-effective access to public transport for work, commuting and searching for jobs and locations where needs lend themselves for entertaining opportunities beit work, education or business.

This list is not exhaustive, but we need to and welcome talking with Government, agencies and local MP's and bringing people together to get these critical agendas progressed. Otherwise the status quo is unsatisfactory and pollution from exhausts and tyres makes people ill, which again is avoidable if we get our nation re-railed appropriately.






Monday, 31 May 2021

Support pro-affirma the rebuilding of a Northampton-Market Harborough Rail Link

FYI Please respond and support the rebuild of a Northampton-Market Harborough rail link. We need it even with Rugby-Narborough and solutions to problems with finding backers to help push it forward are welcome to entertain. Our events page on our website has recently been updated. Please feel free to tap in. https://ertarail.co.uk/events/ 

Our thanks to Cllr Dominic Fosker for giving us notice. 

My thoughts on the rail link are:
a. The trackbed needs widening to cater for plethora uses as a 'green corridor' inclusive of walk-way, cycle-way, railway.
b. It would link Oxford-Milton Keynes/Aylesbury with Leicester/East Midlands and vice versa inclusive of Northampton as a main beneficiary.
c. Tracks can be lowered for tunnel 9'6 clearances for freight and with a north-west curve, would enable direct running to / from DIRFT.
d. Would take on the M1 as a parallel rail alternative for passenger and freight
e. Market Harborough end would need some new alignment and linkage with the Midland Main Line.
f. Nothing is trouble free, but we need to restore strategic missing rail alternatives.
g. Studies done hitherto show positive case merits and these should be built on/consolidated.
h. A508 corridor grows, more traffic and congestion ends up at urban centres and land use parking demand exacerbates and needs stemming at source. 
i. Buses can link with rail and feed each other, does not translate to a challenge per se as these transport modes cater for different audiences. Buses have a largely stabilized audience pattern, whereas rail deals with bulk and gets people out of their cars as per other reopenings can illustrate. Hope helpful.
j. Trains could also run onto the Brackmills Branch for freight (Industrial Market) and passenger - clearing through lines for other pathing/services. THe Brackmills Branch could have wait-over capacity for trains between turns in some cases.

You can NOW read the climate emergency action plan and have your say at:


Paper copies, for those without the internet, are available at Broughton Astley, Lutterworth and Market Harborough libraries. Alternatively, people can complete the survey, via telephone, with a customer service advisor, by making an appointment on 01858 828282.

Please, please do contribute, and share widely!

Please also write in support of rebuilding the railway to MP Mr Chris Heaton-Harris - Constituency includes much of the old route and as Rail Minister needs to practise what Government touts in his own back yard of route protection, delivery plan and putting the railway first in critical decision making/resourcing and implementation in a timely manner - there is a Climate Emergency! https://www.heatonharris.com/news/northampton-market-harborough-train-line