The British Regional Transport Association (BRTA) a voluntary unincorporated membership based association seeking to restore strategic missing rail links and improve the environment as a result. We advocate passenger and freight by rail, unblocking our roads and improving air quality we all have to breathe! Enquiries can be sent to E. ceo@brtarail.com
About Me
- British Regional Transport Association (BRTA)/Richard Pill
- Bedford, Bedfordshire, United Kingdom
Friday, 4 June 2021
Let's Have Better Buses for Bedford!
Wednesday, 2 June 2021
EEH Have Your Say: Call for evidence for EEH Connectivity Studies (Oxford-Milton Keynes; and Peterborough-Northampton-Oxford)
Call for evidence for EEH Connectivity Studies (Oxford-Milton Keynes; and Peterborough-Northam
Good afternoon,
England’s Economic Heartland is the sub-national transport body for Swindon and
Oxfordshire across to Cambridgeshire, and Northamptonshire down to Hertfordshire.
In February we published our Transport Strategy for the region, which sets out the
step-change in approach required to achieve net zero by as early as 2040 and
enable our people and businesses to realise their potentials.
We are now developing our first two connectivity studies for the region:
Oxford-Milton Keynes; and Peterborough-Northampton-
Transport Strategy’s vision into actions, as we work with our partners to identify
the investment required along specific corridors to cut emissions while supporting
economic growth.
To ensure we have a full understanding of these corridors, we are holding a call for
evidence, which will run from June 1 to midnight on June 30.
As a valued stakeholder I’d encourage you to complete our short online survey,
which asks for your input on:
- Key themes for the study areas
- The key movements within the study areas
- The connectivity opportunities and challenges in the study areas
- What interventions the studies should consider
Your views will be used to shape our understanding of the corridors and the
interventions which may be required to improve connectivity.
Please see our website for more information on the connectivity studies and to
have your say
(https://www.
We look forward to hearing from you.
Thank you,
Adam King
Communications Manager - England’s Economic Heartland/ East West
Rail Consortium
Tel: 01296 383401
E-mail: aking@
Website: www.englandseconomicheartland.
EEH Business Unit c/o Buckinghamshire Council, Walton Street offices,
Aylesbury, Bucks, HP20 1UA
Here is the link:
https://www.englandseconomicheartland.com/our-work/connectivity-studies/
More of what ERTA would like to see -
a joined up pro-affirma rail development plan from Government re-direction,
intent and delivery by 2030 'nation-wide' i.e. the model repeated elsewhere.
Too much consultation, not enough action, beef and top-slice £27 billion to new
roads and re-direct to Rail Reopenings and New Builds.
Boris, Grant Shapps and Opposition Parties, 'over to you'?! Flag it up!
Here's what ERTA contributed - please give support:
a. Write to your local MP
b. Join our free email loop: richard.erta@gmail.com
c. reiterate what we advocate and give it outline support.
1. Oxford-Milton Keynes Connectivity Study + Peterborough-Northampton-Oxford.
Preliminary: I combined and overlap, as they in reality do and are not clinically separated. The presentation of an Oxford-Milton Keynes Connectivity and Peterborough-Northampton-Oxford should not be seen in isolation and will inevitably have some overlap? For example, when east-west rail gets going, one change at Bletchley will enable Northampton and Milton Keynes people to go to Oxford and/or Aylesbury (ought to) and vice versa. The connecting road between Northampton and Oxford direct is the A43 which feeds to the A43 and A421 respectively for south and south westerly links like with the M4 at Swindon for further afield. Other end, Northampton the A43 feeds into northerly M1 and A45/A14 for example. The key place on Oxford – Milton Keynes – a half way point on a map can be Calvert. Seems incongruous in itself hitherto but as a growth area with multiple transport (rail) links and yet no station?! We have to take this oversight seriously. HS2 will not entertain any station between Solihull and Old Oak Common (OOC) Interchange, so how will growing communities between Rugby and OOC access a rail link to such an interchange with potential rail links to Reading, Heathrow and Guildford let alone west London and the wider South East and vice versa in spinal core transport terms with the arm to Milton Keynes and Bedford secured? Reading-Didcot-Oxford is at capacity and waiting on the cushions at signals for clearance/pathing slows down and bottlenecks the amount of capacity for rail to cater for all the business on offer (passenger and freight). This means a variation and proliferation on a theme is required to be looked at. Yes, modal shift must be a key goal from road-based transport (passenger and freight) to rail and so we both need the rails and stations/access points nearer to where people live and filling gaps in existing networks to challenge the default assumption of roads, roads and more roads and locked-in road reliance and dependency cultures as the presumed normalised norm.
What we wish to see in rail infrastructure terms:
1. Study and make the case for a rail link north of Calvert (and protect/steward/ensure adequate land is allowed for) for:
a. A station at Calvert for domestic rail services (numerous) to share and utilise for rail.
2. Study and make the case for, grow parties of support and investment in and moves up and down the chain to delivery in a timely manner of a new domestic rail link north of Calvert alongside/same corridor as HS2 to serve (east of) Brackley/A43/bus link with Silverstone), Woodford Halse, Willoughby and then via a new build serve Barby and link to the West Coast Main Line (WCML) where the Northampton Loop/slow lines diverge with the Kilsby fast tracks. This spinal core, utilising perhaps, part of the old Great Central trackbed, certainly the corridor needs better rail access and would:
a. compliment growth agendas with default to rail more
b. compliment and tie in with any aspirations for a Banbury-Daventry-Northampton rail link which could connect somewhere in the Woodford area.
c. Would compliment the advancing campaign for a Rugby-Magna Park-Lutterworth-Narborough (linkage with Nuneaton-Leicester Line) and would therefore give multiple connectivity for passenger and freight by rail – capacity, choice, flexibility and more for more. The overlap with an Oxford-Milton Keynes and Peterborough-Northampton-Oxford arc is obvious. But unless you re-rail and centre north-south with east-west re-railing agendas, all development is roads based and that is unsustainable even in an electric vehicle era, because tyre friction particulates still pollute the air we breathe, volume per ratio of capacity and cost/land-use allocation demand is also self-defeating and flies in the face of a Climate Emergency which means we need to change Government agendas and policy and redirect existing forms from for example a £27 billion new roads budget to pep up the Railway Reopenings Fund to parity or favouring rail expansion projects over roads agendas. This is not happening; the proverbial juggernaut is hurling towards destruction and needs both to reduce speed and be turned around before the crash and that with immediate effect. Timescales of delivery need bringing down from 2050 assumptions to 2030 realities.
c. Calvert south, look at rebuilding a Calvert-Grendon rail link to enable freight and some express passenger services to serve OOC domestically from Milton Keynes, Rugby and Calvert and all in between to OOC and also approaching Reading for onwards to Southampton or South West from the east.
But capacity wise, the proposed Southern Rail Link from Woking-Heathrow needs to be designed to extend to OOC and via a new link or tunnel to connect with the Chiltern Main Line for direct linkages and arcing between Banbury (nodal point of reference) and Calvert and Milton Keynes to OOC, Heathrow and onwards to Guildford. This links with the Portsmouth line and also our campaign for reinstatement of the Guildford-Cranleigh-Horsham rail link, which linking with existing lines would enable approaches via Three Bridges to Gatwick from the south. Likewise, the rebuild of Horsham-Shoreham and a new direct link off the Guildford-Horsham line, would enable direct access from OOC and points north to Brighton and Shoreham itself is a port. The point being that passenger and freight would have a new north-south with east-west rail links bypassing London and via Heathrow could utilise off peak capacity to enable more by rail.
3. Northampton-Peterborough et al:
There is no direct rail link between Oxford and Northampton except the proposed east-west rail via Bletchley and change. However, mooted Banbury-Daventry -Northampton would have to negotiate M40 and HS2 but positively were that to be accommodated, could link with a re-railed GC corridor for interchange and optimum operational output flexibility and feed each other.
There is also a need for any link to consider possibly including a curve from the Leamington/Stratford lines via Southam to Daventry to Northampton via the A425 corridor to link southern West Midlands with these key, un-railed areas.
a. Northampton: Station needs rebuilding and re-modelling – the current layout is bad from a number of considerations, let alone growth on-off rail contexts. More tracks, more platform capacity and more radial routes for walking, cycling and bus and less car reliance to/from the station.
b. Re-rail the Brackmills Branch: would connect important Brackmills Industrial Estate with Castle Station. The branch itself could afford to accommodate waitover freight/passenger turns off platform, clearing through tracks for other services. Indeed, a consideration of rebuilding back to Bedford for east-west rail and Thameslink connectivity as well as MML-WCML freight. A new route needs to be found from Castle Ashby Estate to flyover and connection with the slows of the MML. Forget Olney, they don’t want the railway and have deliberately allowed development to scupper old and any close proximity rail link passing their way. Far better to look north and have a Parkway Station near to where A509 and A428 connect surely for optimum interchangeability and reach/range? Numerous studies have been done over the years and reached the Government for consideration in 2004 but was declined on cost, not case terms. Principally, the councils and other agencies had other agendas, approaching 20 years on, given growth and modal shift, we need to keep this option alive (route protection) and examine with solutions in mind, not be overcome by hurdles per se x any other rail reopening or new build.
c. Rebuild the Northampton-Market Harborough Rail Link: Study done already, was positive and should be engaged with. Needs backing and a sponsor to take it forward. M1/A508 are principal arteries to declutter as well as urban impact of volumous traffic, congestion and parking/land-use which is needed for other things like housing and employment. Leicester-Northampton, Milton Keynes and east-west to Oxford as well as existing other WCML linkages and services. Passenger and freight. The corridor needs expanding to accommodate walk/cycle paths as well as a twin track railway and some provision for the current preservation option. A key lesson to learn and work on is footpaths, cycle routes, leisure trails, linear parks, road roundabouts, road intrusion, preservation schemes and canals are just some of the blockages purported to protect a corridor which then in turn become objectors to a railway! We need to think creatively how these can make way for the bulk greener reach-range of re-railing or select domestic new build schemes for the greater good. Ponds can be moved; the railway needs specific engineering. Likewise, tracks can be lowered to make 9’6 clearances in tunnels and a north-west direct curve would allow direct running to Daventry International Rail Freight Terminal (DIRFT) Inland Port. Likewise, freight via Peterborough could access Northampton Depots and others from the Leicester-Market Harborough-Northampton link. Whereas the Rugby-Lutterworth-Narborough rail link serves different, specific and new growth passenger and freight opportunities and the GC from Calvert new build scheme we have suggested. Plenty of scope for both. Rugby-Narborough takes on western flank of M1, Northampton-Market Harborough, takes on the eastern flank. Potential for Brixworth to have a station (A508) commuting and also a Parkway Station where rail line and A14 intersect.
d. Northampton-Bedford and Northampton-Peterborough used to share the same portal access via London Road Level Crossing and Bridge Street to Castle Station ‘box’. Therefore, any links to Brackmills, Bedford, Wellingborough and/or Peterborough (new build/interpretation) needs to lobby Office for Road and Rail (ORR) for ‘special dispensation’ to look at suitability and fit of its demands for bridges everywhere and see that a tight-fit urban location may be more in-keeping to have a new proper level crossing. Bridges are not panaceas and to rule out a whole reopening because access across a road and avoidance of knocking down Grade 2 Listed Buildings (heritage), needs a more flexible approach. Most bridge bashes and level crossing abuse come from road users who act recklessly. Education and more informing common sense should be nurtured culturally and Network Rail are well placed with other educational-local schemes to increase sensible awareness of dangers like trespassing on railway land and so forth. A new rail link to Peterborough is needed, to enable Ely-Northampton freight flows and cut time and premium pathing conflict issues of sending all via London (a great way round) and Peterborough-Leicester) which has East Midlands and West Midlands centric needs and growth. Northampton as a key area logistic hub and connections to other lines (HS2 is supposed to create default capacity on the West Coast Main Line). Such a rail link could have new arms or LRT associated links with places like Rushden, Raunds, Wellingborough suburban areas. Whilst we do not oppose any rail link per se, we have concerns about the feasibility of linking to the Midland Main Line at Wellingborough. If it can be done without conflict, we welcome to see the design. However, a new station to Parkway the new Rushden Lakes Shopping Centre and A6 links and re-railing the Thrapston and Oundle areas respectively makes good social sense. Thrapston is far out except by car and needs re-railing likewise, maybe for different socio-economic reasons Oundle also. Footfall and spend and better linkages the new interrelated railway could bring cannot be under stated. Again, how it could be worked with the Preservation outlet occupying the old course into Peterborough, needs revision and evaluation, but the link-on to the Peterborough-Ely lines for Stansted, Cambridge, Soham, Ipswich, Felixstowe and Norwich to name but a few and them direct, quick and faster by rail; good for freight, good for passengers, good for courting new markets which have arisen since closure and decluttering the A14 corridor as well as links with A45, A43, makes this a must-have consideration for a more holistic and joined up railway infrastructure.
We are keen to understand from interested parties:
What are the key themes for the study area?
a. design a railway delivery plan, make the case and roundtable/consortium develop with delivery in mind. We don’t have the resources, connections or powers.
b. re-railing and select new build, local, conventional rail to connect these arcs and corridors north-south, east-west.
c. Recognise the 1960’s closures went too far, left huge gaps in the rail network
d. Recognise plethora private interests vying for ‘their’ piece of rail connectivity, led to a lack joined-up-ness like at Thrapston where two lines crossed but no physical connection to enable more. People say Kettering-Cambridge was under-used, but the reasons for that may be circumstantial and complex, but A14 follows same axis and is overflowing and £billions spent on widening/land take. We need good planning, coordination and strategic vision with local, affordable, accessible and more by rail/modal shift built into designs, plans and timely delivery.
What do you consider to be the key movements in the area?
a. freight and passenger movements and a need to provide rail choices
b. growth, development and logistics on more sustainable rail-based platforms from plans, consent and designs to be rail connected. We should never have a proliferated Wixams example without rail connectivity from day one… lessons have not been learned and however informed, is lacklustre/race to the bottom planning and desperation politics of the worst kind. No railway station (passengers), no rail connection (large warehouses and freight rail served). The result? Car-legs and loads of daily lorries pounding roads proliferatedly and intruding urban access roads. Planning, systems, joined-up-ness and objectivity must look at this failed model and do better/amend retrospectively (new build) and ensure going forwards all new developments over a size have rail informed from day one/learn lessons/advocate best practise/hold up examples where this IS the case and/or can be.
c. Recycling by rail more. Local-Regional hubs, for gathering material beit household, cars, fridges, glass, cardboard and send by rail for recycling/processing and finished goods also by rail more. Make it so/design/plan and ensure is and must be the future.
d. Broaden and educate and support the fact that when we think about freight by rail, we have often been trained to think in terms of large marshalling yards, outlay, infrastructure, containers, block loads and a fight between intensive passenger demand and usage over same tracks as the ideal mooted phenomenon of ‘more freight by rail’. We need to better nurture and appreciate/apply that more freight can start small and growth strategy. So, click, collect/send parcels, post and pallets by rail, passenger stock with Guard's Van designs for more by rail like luggage, bikes, prams, buggies, people mobility scooters and more can utilise that capacity. Retain walk-on, walk off accessibility for passenger and small load consignments. Likewise, growing from small loads, pallets, wagon-loads, small to large containers, mixed goods, former model of Speedlink ideas, local-regional. If by rail is unviable for less than 100 miles, make it law that all freight over 100 miles must and should go by rail lion’s share with local deliveries door to door. A thousand miles begins with a single step and so start small, block replicate models which work, find means-ways and recycle, utilise and restore old stock and redeploy/save outlay costs. Indeed, new ideas, new railways, new thinking, rejuvenate existing railways. Niches, hubs and growth for more modal shift, less fossil fuel and demonstrate that it can work. Brackmills is a prime example. Get it right and where else can it be done? Likewise, the Forders Sidings, shunting sidings and Gantry on the Bedford-Bletchley Railway, needs a vision, a plan and action to get it fully operational, growing more by rail, doing something for rail, not just sitting there year on year doing nothing, rotting whilst roads are taking more traffic, congestion and pollution. Sidings at Swanbourne to enable priority to traverse the Bletchley Viaduct should be considered.
What are the key connectivity opportunities and challenges in the study area?
a. Lack of east-west links, just one, is not enough, however good.
b. Lack of protection and stewardship of rail portals and freight servicing areas to urban interfaces
c. Lack of old rail route stewardship, study and evaluation with delivery of a new railway/reopening in mind and the challenge of the mantra ‘it never paid’ when 50+ years on, everything has grown, everything has changed and we need to engage old and new markets, refresh our vision and get everything transport-wise back on the rails as much as possible. This is why developing railway lands for non-rail usage is ludicrous as we think of the old St Johns site in central Bedford as one example, similar others at Wolverton – there was once a recycling by rail/water plan, alas nothing seems rail visioned, only capacity constraints, costs and more of the same old road-based/guzzling agendas which ill-serve from a number of angles.
What interventions do you think the study should consider?
a. Government alignment and consistency of policy and investment for modal shift back to rail as much as possible/wherever possible
b. Route and access land protection/nurturing enablement for re-railing
c. Modal shift back to rail to be the foremost priority and agenda with a how to/can-do attitude and approach/overcoming problems, rather than defeated at outset by daunting prospects.
d. Need to do and act in a timely manner – seize those lands at Calvert, ensure station and new lines can be fitted in amidst HS2 and other development ‘non-rail’ interests and use of lands. Must have expansion by rail more at forefront.
e. Start with rail network and gap filling first and work back from there with timely delivery and nurture-enablement in mind and then engage, interface and grow coalitions for. Seems we pretend pluralism when we need specifics, we leave open-wide for the unexpected, but miss-out fine detail and plan for common sense. Leadership and direction start with all of us and Government must be on-side as a facilitator and enabler, not an excuse not to deliver or enable per se as long as it squares social, economic and environmental considerations, not just greening unsustainable more to the roads quick fixes at what cost elsewhere?
I hope these views, feedback and welcome further opportunities to discourse and work towards achieving these goals. More information is on our website: https://ertarail.co.uk/publicity/ I attach a rough diagram which shows our north-south and east-west Great Central-Brighton spinal aspiration for joined-up rail links and planning to realise. If we don’t do it, we lock in capacity constraints and stifle modal shift more. Calvert-Grendon avoiding 24x7 freight going through Aylesbury and enables more capacity respectively.
Yours sincerely,
Richard Pill
ERTA Chairman
Monday, 31 May 2021
Support pro-affirma the rebuilding of a Northampton-Market Harborough Rail Link
FYI Please respond and support the rebuild of a Northampton-Market Harborough rail link. We need it even with Rugby-Narborough and solutions to problems with finding backers to help push it forward are welcome to entertain. Our events page on our website has recently been updated. Please feel free to tap in. https://ertarail.co.uk/
Our thanks to Cllr Dominic Fosker for giving us notice.
Sunday, 30 May 2021
ERTA Response to East-West Consultation 2021
27-05-21
ERTA Response to East-West
Consultation 2021
1.0 Preamble:
1.1 The English Regional Transport
Association (ERTA) is a pro-public transport membership-based association
with a particular interest in reopening, rebuilding and select new pieces of
restoring missing rail links across the English Regions. Our Chairman has been
associated with organisations which have advocated an East-West Railway from
Oxford-Bedford-Cambridge since 1987 His history is as follows:
1.2 1981 joined the Bedford-Bletchley
Rail Users Association (BBRUA) – then seeking to save the last remnant of
the Oxbridge line from closure threats (Serpell).
1.3 1985 Joined Railway Development
Society (now Railfuture) and served on the Reopenings Committee with a
brief to help forge forward the Oxford-Bletchley line for reopening.
1.4 1986/7 Forged Links and supported
the formation of the Oxon and Bucks Rail Action Committee (OBRAC) which
served as an umbrella organisation to bring various reopening advocating groups
together between Oxford-Bicester/Aylesbury and Milton Keynes
1.5 1987 Formed the Bedford and Sandy
Rail Reopening Association (BASRRA) which called for route protection,
studying and reopening a rail link to link with the main line at Sandy for
through services elsewhere and to the east-west corridor.
1.6 1990 Formed the Bedfordshire
Branch of Transport 2000 (now Campaign for Better Transport/CBT) and
carried on raising the profile of reopening the east-west rail with variations
as much as possible. Coalesced local councils to support the idea and project
which ultimately morphed into the East-West Rail Consortium (EWRC).
1.7 1997 Formed the Bedfordshire
Railway and Transport Association (BRTA) which carried on route protection,
advocacy and widening dynamic appeal of the strategic nature of the railway and
courted councils to come together to support more. This carried on for about 8
years and after a 5-year break, was resuscitated to morph into the English
Regional Transport Association (ERTA).
1.8 East West Rail Consortium (EWRC): The forming of the EWRC in 1994/5 was a game changer,
levelling in funding for studies to put on a formal basis what we as lay-people
had been advocating but without the resources to give it formal footing in an
increasingly competitive arena of competing agendas, conflict and demands for
science-based evidence.
1.9 Examples of time-line and
development conflict:
However, the EWRC came after 7 years of
calling for route protection which was not supported by Bedford Borough and
Bedfordshire County Council, resulting in a. a cycleway along the old route
which became and end in itself and an objector to a railway and b. the damage
extensively done by allowing both the A1 Girtford Underpass, a lack of
underpass to the A421 Bedford Southern Bypass and other encroachments of a
development kind. Likewise, in latter years, the policy of the Office of Road
and Rail (ORR) of opposing new level crossings for reopened railways, increases
cost, affordability and rules out where layout of roads or urban landscapes do
not lend themselves to the land-take of bridging with possible clearances in
such wakes. However, that must be compared and contrasted with bridges, which
get hit by lorries and buses aplenty, cost more and are not a panacea against
clearances, witness 6-tracking north of Bedford Midland for example, totally
unnecessary if part of the old route east of Bedford is adopted.
2.0 The Consultation Process and how
we feel somewhat disenfranchised:
2.1 2019 Consultation came out of
the blue to us and was held for Bedford at Scott Hall, easy for parking, remote
for people who do not drive unless they live within walking distance of Fenlake
in south-east Bedford. The long tradition is for civic consultations to be done
in a central and optimally accessible place like Harpur Suite, Corn Exchange or
Central Library for example. There walking, cycling, bus and rail access lends
itself, driving and parking is a cost-time exercise, but a balance is not
struck by locating to out-of-town centre areas. That consultation, took away a
30+ year consensus on what, if any reopening meant east of Bedford; formalised
by the EWRC’s own 1997 study which verified what we had previously advocated,
namely that east of Bedford meant the old route, with realignments south of
Station Court Blunham, and swinging round to a new build alignment north of
Sunderland Road Sandy and new links facing south to the East Coast Main Line
(ECML), the idea of bolting on to the Cambridge-St Ives-Huntingdon corridor
being scuppered by the decision and implementation of a Guided Busway on a
railed (freight only/mothballed) railway corridor, blocking the northern access
at Chesterton Junction which now has Cambridge North Station bestriding it.
2.2 The 5 options after £10 million to whittle down to just 5 from some
33 options ruled out/did not include the old route/turned away from the Steer
Davis Gleave option or variants on it. This was a complete unexpected and shock
to us and we were bitterly disappointed and disenfranchised/alienated from the
whole process. The turning on its head all that had been understood and
campaigned for at cost to start anew with 2 options supporting ‘via Bedford
Midland’ and 3 avoiding Bedford altogether. The nudge psychology of Bedford
Midland or bust of course twisted people’s arm for inclusion, but then led to
the question of how you then end up at Cambridge and head off eastwards in some
shape or form. Our view and reflection, given these changes of design dynamic
and policy, however informed or not, was to accept the link with Bedford
Midland, but calling for 2 new bay platforms bolted alongside the current
Platform 1A for passenger trains to reverse and freight Midland Main Line
(MML)-East-West to use existing tracks, albeit realigned and upgraded between
St John’s area and Bedford Midland ‘box’ area. East-West freight, would avoid
the Bedford Midland ‘box’ area, by a reinstatement of the triangle anew at St
John’s area and thus conflict and away from any encroachments of residential
areas.
3.0 Our emergent view of a new build
between Bedford and north of Sandy/Tempsford area:
Rebuild/new build east of the old St
John’s area reinstated anew triangle and either bridge or level crossing for
Cardington Road/A603 dual carriageway. Head off east on old corridor with new
level crossing needed at Priory Marina entrance, raise the A421 Bypass as per
DfT were to give ‘sympathetic consideration’ at the Side Roads Order 199 1993
Inquiry and such an under-pass bridge would also, with perimeter fencing,
enable a cycle/footway alongside the railway. Heading east, either plough
through on old trackbed at Willington and relocate Danes Camp to Willington Woods
or realign the railway to the north, cross over the Great River Ouse west of
Willington and swing round and cross exact same River east of Willington and
thence on embankment and new build go to the north of built Blunham alongside
the Great Ouse River Valley and corridor to approach crossing A1/Ivel River
from a south-westerly direction and – contrast the agenda of the 2019 and post
discourses – choose physical linkage of tracks with the outer slows of the East
Coast Main Line (ECML) for optimum scope, business courting and through rail
journey capture. We are against segregated lines, we are against a new station,
we are against 300 houses on a flood plain and a lack of facilities when
existing settlements would be better enlarged with enhanced facilities.
Alas, this 2021 Consultation rejects
this completely and presents us with a Northern Route E which arrives at the
Tempsford area from a north-westerly direction.
4.0 Key objections to the Northern Route:
4.1 Six tracking through Bedford
Midland and Poets area of Bedford. We need to see how the design and land
use of a rebuilt Bedford Midland would look and fit in a context of growth on
and off the rails.
4.2 Rebuilding of A4280 Bromham Road
Bridge – going to need a land-take and be a massive under-taking with huge
disruption and had Bedford Borough, Network Rail and other agencies listened to
us, would have had an extra arch for bolting on to existing twin slows north of
the bridge, we were completely ignored and now face more cost and disturbance
as a result.
4.3 Fifty plus houses taken – not
just residencies, people’s homes, our route option required fewer if any
demolitions. Extended back gardens are not residencies and there is a
difference between inconvenience and family dwellings.
4.4 The eyesore of a 50’
viaduct/flyover/bridge to get from ground level to incline of a hill over
trunk roads and associated issues on a mainly flood plain which perennially
floods.
4.5 The unnecessary intrusion, cost
and upheaval of the Northern Route E arcing route and what of demolitions
at Ravensden or associated to get through an increasingly built area both sides
or projected route/s?
4.6 The conundrum of negotiating
A1/A421, Black Cat Roundabout, Roxton,
Roxton Garden Centre to get to the Tempsford Flood Plains east of the River
Great Ouse/River Ivel conjoined area? Our route is flatter, more direct, in all
probability less cost and less intrusive, courting fewer objections. Why not
consider it, why not study it, why not compare and contrast? Instead, we have a
stiff-necked ‘Northern Route or bust’ attitude, presumption and in our view,
abuse of power.
5.0 The consultation Section by
Section:
5.1 Oxford-Calvert:
Islip Station must have a regular train
service and be invested in as an equal partner, optimising footfall and spend
with things like capitalising on visitorship, country walks, cycle rides, more
food and drink access and modest development in-keeping with the quasi-rural
nature of the location.
5.2 A west-south new curve for Bicester-Aylesbury (nodal points of
reference) should be studied and considered to enable rail to do more
(passenger and possible freight).
5.3 Calvert must have a new station:
The area (3–5-mile radius) is growing,
possible new town development, so a. keeps rail reopening and servicing by rail
land-take-use options open and b. look at other servicing projects like
extending Chiltern to Brackley alongside HS2 and indeed re-railing the Great
Central corridor with new build to West Coast Main Line (WCML) Rugby
connectivity for passenger and freight by rail options, capacity, re-railing
outlying areas and catering for growth on a sustainable basis. We are not so
concerned who does it, who serves it or who operated what services over it –
the rails – but it is needed and should both be looked at and design options
kept open instigatively and passively by others including HS2 and other development
agendas and plans. Likewise, a new Calvert-Grendon rebuild of former GC rail
corridor gives access by existing rails to Princes Risborough, High Wycombe,
Old Oak Common and if we get our way, the new Southern Heathrow rail link to
Woking and Guildford which provides off peak other use like freight away from
residential areas of Aylesbury and London centric tracks (few other choices
currently to orbit the capital north-south and east-west). Can also approach
Reading from the east and link on to South West and/or Southampton flows.
5.4 Calvert-Winslow:
There should be land
protected/identified around the old Claydon Station area with a view to a new
station. The Claydons and surrounds have and are growing, Claydon House a major
attraction of national interest and the gap between Bicester and Winslow is too
great (given Buckingham a 10-mile distance is included in commuter use
catchment potential case making) – needs to share-out the loading and
parking/traffic flow and capacity more. Claydon could fill that gap and bring
better public transport interchange in a quasi-rural transformed setting going
forward.
5.5 Newton Longville/West Bletchley:
Growth of Milton Keynes and east of
Winslow, north, south, east and west, makes consideration of a Parkway Station
serving these areas out of urban cordons tangible and should be a. land use
allocation identified, b. should be studied further/case making and c. kept
under review/implemented at design stages now. Services can be diverse, fast
end to end, semi fast with limited stops, slow, every stop plus freight. 24 x 7
railway, gives plenty of scope to optimise. However, this goal should be a
constant along the whole project, alas flounders and stalls in some cases.
5.6 Bletchley:
This is good but should give more
consideration to a. expanding capacity/baying and through tracks at Milton
Keynes Central Station, b Wolverton and c. how Newport Pagnell and Northampton
can more be included in the frame for Aylesbury links, Old Oak Common via
Calvert links, Oxford via Bicester links and vice versa, bringing regenerative
footfall and spend on a sustainable basis. The current one train per hour from
Southern tracks to MK Central is an example of how capacity constraints,
diagramming and available paths, stifle access. Some study needs to look at
this and come up with rail-based solutions. Diversity on a theme makes sense
and our suggestions seek to take it into account. a. where do people wish to
go, b. what main hubs like places and airports could rail direct serve
better/market capture.
5.7 Marston Vale Railway:
The quasi-rural nature, albeit a
changing landscape constantly, should be valued, cherished and retained where
possible. Likewise, the local hourly shuttle serving multiple halts should be
retained and enhanced with a. Sunday and Bank Holiday Services, b. Increased
hours inclusive of later night running say 11pm as a get you home/mop up
service base note. c. The service could do more. Line guides should be produced
and sold. Food and drink trolley service nurtured and retention of the toilet
on a train and conductor likewise and retain the cash economy alongside other
options. d. I do not think people would object to a bi-hourly service on
Sundays and Bank Holidays if it is rock-solid reliable, sadly this has not been
the case in recent years, however informed or not. e. We object to closure and
relocation of stations, diversity of services should be the goal, not end to
end whole line timings per se. f. Extension of the local service to Milton
Keynes Central (£20 million spent), the electrification of the line and
utilising old stock which could do more, a line-side freight development plan
inclusive of regenerating freight to/from Forders loading gantry use and
sidings – recycling centre and sending to processing centres by rail – located
as is off the A1-M1 A421 link and near A6, could service a wide area with
aggregately less lorries pounding the roads as a result. We need to think
creatively, scope widely and court an alliance geared to making use of the
infrastructure just sitting there, rotting in a world of need and resource
demand. g. Kemspton Town/Retail Park – see attached report. But upwards of 18,
000 population/Kempston Town could bolster usership to any local or regional
service on the Marston Vale Railway and should be round-tabled, supported,
studied and progressed to boost all trains calling there. It is a
short-sightedness that has not had station and development together for 40
years and needs rectifying with integrative bus services for local distribution
and two-way feed.
5.8 St John’s – Bedford Midland:
a. Reinstate a Bedford St John’s area
rail triangle for optimum operations (passenger and freight)
b. Claim and utilise the former Danfoss
area for a realignment of railway, straightening and line speed increases.
c. Relocate the 1984 St John’s Halt to
serve both sides of the railway and make 4-coach standard on all halts and
stations for exact the same or more in principal locations like Bedford Midland
Baying facilities.
d. install twin bays at Bedford Midland
with a booking office/reception annex wedged between looking down Midland Road
and the new station/track layout for pedestrian and cycle and bus access whilst
car drivers can continue to use Ashburnham Road access and a new facility over
Ford End Road Bridge – see diagram for an idea to be worked on.
e. Bedford St John’s – Tempsford – see 3.0
above.
5.9 Tempsford-Cambridge:
We would have preferred a going through
a rebuilt purposed Sandy Interchange Station and via new interpretation
through/tunnel the golf course near Potton and straight gradient line to south
of Gamlingay and rebuild on old route to M11 where a new build and facilitation
across the M11, River Cam, new re-claim of old route through Trumpington
Meadows Development, Trumping ton P&R and junk the Guided Busway to roads
and utilise old trackbed to serve both Addenbrookes/Cambridge South and a
east-south curve for direct Stansted running from the west and via Long Road
underpass bridges, to enter a broadened Cambridge ‘box’ of extra platforms,
through or bay facilitation and broader neck enabling more than 3 tracks in/out
from the south. In any case, if you went for the Shelford option, curving from
the old route to a southerly direction would be less intrusive and hazardous
than current derivative options. The reality is that all tiers of Government
failed to protect the old route despite calls from public based organisations
and developed even with an intent to reopen in mind well into the 2010’s. This
flagrant breach of trust and stewardship should be translated to a levy of
compensation shared both to the builders of the new rail link and those
affected by it more.
5.10 On freight:
A new line off the Soham and Ely
Junction lines across via Northstowe to join ECML slows at Tempsford (from a
north easterly direction) to go out south-westerly makes sense to segregate
freight and also ‘not via Cambridge’ extra capacity to reduce the conflict of
intense passenger requirements to an international centre like Cambridge from
multiple directions. This segregational approach means more by rail, not less.
Yet this needs looking at now or the exact same scenarios as before, whereby
land is taken for development, no corridor planned, and failing to plan means
planning to fail! We cannot afford to if we are serious on climate change,
climate emergency and modal shift/cutting road emissions and associated volume
pro-rata of road space informing congestion, pollution and wasting both time
and energy as a normative bi-product of human activity. The rail alternative is
needed and we must think bigger, better and act now to secure this new route.
Richard Pill
ERTA Chairman
29-05-21
Thursday, 20 May 2021
Press Release ERTA Welcomes new initiative to part renationalise the British Rail System 20-05-21
20 May 2021
Press
Release
ERTA
Welcomes new initiative to part renationalise the British Rail System
ERTA
welcomes the news of Government moves towards renationalisation of the railways
under the umbrella title of Great British Railways. We very much hope this ‘new
dawn’ lives up to that word ‘Great’ whereas a more honest title may have been
British Rail or British Railways. We welcome the bringing together of train and
track and maybe some better cohesion of the railways as a robust,
environmentally friendly public transport system upon which to base the masse
conveyance of people and goods. However, we want guarantees from the Secretary
of State for Transport, Rt. Hon Grant Shapps MP that the following will be
built-in to the new organisations’ ethos, goals and fabric:
1. That the
Rail Reopenings Fund is not a one-off but renewed with fresh annual funding
allocations and a rolling programme fostered. In particular, signalling a
change from road to rails more in environmental terms will mean reducing the
new roads budget of £27 billion to boost the rail reopenings budget from a mere
£500 million to parity at very least to indicate a wish to transfer more
traffic to the rails.
2. That
walk-on, walk-off access and services to the general public will be retained
and boosted with better streamlines, concessionary fares, cards and flexible
approaches to ticketing and reasonable expectations of ratios of seats to
passengers per train and an end to overcrowding.
3. There
will be a line-born freight plan to nurture modal shift from road to rail from
parcels click, collect and send at stations over 10, 000 populations to
recycling by rail, block trains and pallets, parcels and post by rail more.
4. That
Concessionary bus and rail passes will be nationwide and homogenised and
broadened for lifestyle choices and mobility as a right, not a cost-managed
exercise.
5. That
design of trains will include more capacity for bikes, luggage, small
consignments as well as information hard copy as well as technologically
communicated.
ERTA
welcomes the initiative, but will be concerned that the fine detail, timely
delivery and greater cohesion for apprehension by the public with a duty of
care including good on/off rail toilet provision is benchmarked for
accountability on standards and passenger’s rights, rather than mere aesthetic
tick-boxing of political correctness.
End of
Press Release
Notes:
1. Useful source: https://www.gov.uk/government/news/great-british-railways-for-the-passenger
2. Further comment: Mr Richard Pill, ERTA Chairman and
Media Spokesperson 01234 330090/ richard.erta@gmail.com




