Dear Friends, Colleagues and Elected Representatives,
The British Regional Transport Association (BRTA) a voluntary unincorporated membership based association seeking to restore strategic missing rail links and improve the environment as a result. We advocate passenger and freight by rail, unblocking our roads and improving air quality we all have to breathe! Enquiries can be sent to E. ceo@brtarail.com
About Me
- British Regional Transport Association (BRTA)/Richard Pill
- Bedford, Bedfordshire, United Kingdom
Saturday, 6 February 2021
Petition for thought - East West Rail is hotting up!
Sunday, 31 January 2021
Notes from ERTA Meeting Great Central Re-Railing Project/Corridor 29-01-2021 15.00 hrs.
Notes from ERTA Meeting Great Central Re-Railing Project/Corridor 29-01-2021 15.00 hrs.
Present: Cllr Rupert Frost, Colin Crawford, Simon Barber, Cllr David Bill, Owen O’Neill, Richard Pill, Harry Burr, Cllr Peter James, Kathy Keeley and Edward Blackman.
1. Chairman’s Welcome: Simon duly opened
the meeting with his one liner of introductory.
2. Apologies for absence: Chris Heaton Harris (MP for Daventry and
Government Rail Minister), Cllr Richard Auger of Northants CC, Cllr Martin Tett
of Bucks CC, Cllr Tim Mills of Aylesbury Vale, Mr James Tierney of Maritime Transport
and Mr Mike Reed.
3. The need to save and re-rail the
corridor with deviations where blockages cannot be overcome: Richard explained
that ERTA’s goal is to get people to join and inform a team of assistants under
Simon to nurture the project along, trackbed watch, protect the route as much
as possible from piecemeal development threats and court professional and
political support as much as possible, who in turn are to invest in studies and
take it on to the next phase towards delivery. People were encouraged to let
Simon have their details and ideas of who else to contact for his database.
4. The need for studies, BCR Listing and
Business Case firmed up: Owen O’Neill said we should wait until England’s
Economic Heartland (EEH) complete their passenger study phase 2 looking at
transport demand in various nodes along this corridor. It is due to report in
April 2021 and includes south of Rugby. Census figures were also mentioned.
Cllr David Bill said we have a plethora of depots springing up, some rail-connected
but generate many lorry movements as well and that was a concern. Owen
explained to us what the Golden Triangle loosely meant consisting of
Lutterworth-M1, M6, M69.
Peter James mentioned that Magna Park
was a development which is near the GC cordon and was not there as an example
when the Rugby-Leicester lines were closed. Owen then gave a useful look at his
paper to be published and diagrams of Rugby-Narborough via Magna Park using the
old Midland route out of Rugby. It was said about the ownership of the corridor
through Rugby and the loss of the old viaduct. This is a setback, but on the
other hand economies of scale are that were it HS2 for example, they would
think nothing about putting a new one in.
4. Route SWOT – Strengths, Weaknesses,
Opportunities and Threats: This was deferred to elsewhere and to wait for EEH’s
study. It was stressed that unless we can raise enough people to trackbed
watch, we cannot have intelligence on development threats and the need to
protect the corridor was vital. We need local councils on board as well as
Government and other agencies.
5. The need for a loose coalition of
reliable volunteers to work together and share roles
- let Simon have your details for his
database: See item 3.
6. Area focuses:
a. Calvert-Brackley-Woodford Halse
b. Banbury-Woodford Halse
c. Woodford area to Willoughby-Barby and
into Rugby
d. Rugby-Magna
Park-Lutterworth-Narborough for onwards to (freight Knighton) and passenger (Leicester).
These were put on hold until EEH report,
showing what demand. Lutterworth has 10, 000 population and is expected to
grow. It is also where the east-west A14 from Felixstowe meets M1 and M6
corridors. See note below *
7. Local, conventional rail link with
passenger and freight in scope from Southampton/Bristol-Oxford-Rugby-Leicester
in scope: Discussion on local, regional and wider national implications was
discussed. On the one hand HS2 is expected to create capacity down the West
Coast Main Line (WCML), whereas a bottleneck existed between Didcot and Oxford.
Reading was also cited (freight from Southampton for example) as getting stuck
on the cushions at the curve from Basingstoke to the Didcot main line. Discussion
was had on whether the Bucks CC and Windsor Link idea of reinstating the Bourne
End to High Wycombe line with Grendon-Calvert (GC) would provide more
flexibility of operations to ease things? Likewise, once off main line tracks
north of Oxford, GC link provides extra capacity so may relieve going via
London or Birmingham tracks more and attract new as yet not being done new to
rail from along the line and end-to-end wherever to wherever via these metals.
It was also discussed about intermediate locations and stations. HS2 is a fast
line and won’t provide a station at Brackley for example, so the scope for a
domestic line alongside HS2 which does, remembering Brackley has A43 and
Silverstone orbits as well as a growing place in its own right. Likewise,
Woodford Halse, Southam-Daventry via the A425, which GC intercepts half way
roughly with possible Parkway Station opportunities. North of that with
Willoughby-Rugby/Barby-Rugby Midland needs specific studies on various aspects.
Demand is one, engineering and inclusivity scoping another – the re-railing of
growing communities, bringing rail access closer.
Warwickshire County Council is
apparently doing a Public Transport Survey – Simon to follow up and report
back. RFI = Rail Freight Interchanges. Colin offered to talk to Maggie Simpson
of the Rail Freight Group (RFG). It was also recommended he and Simon talk with
Mr Andrew Pritchard of the East Midlands Transport Group of Councils.
8. Getting bigger fry on board:
a. developers: Gazeleys was mentioned.
DB Tritax Symmetry – lorries part, if they are focusing on rail east-west that
could be Liverpool and East Coast, but lorry movements could hit M1 for north-south
as no rail choices exist between Leicester-Nuneaton and Rugby for example,
which is a strategic gap in the rail network.
b. rail industry/business people: Colin
and Simon would seek a meeting with Chiltern to try and see what comes of it.
East-West Rail are toying of dropping their Claydon-Aylesbury arm and so
someone else may wish to fill it passenger-wise, given Calvert is to be
developed to new town size. Could it be that Chiltern could aspire a domestic
rail (or build a coalition) to re-rail Brackley alongside HS2 as a domestic
line with Parkway Station for catching A43, Silverstone (bus link) and growing
Brackley commute options which could negotiate running to or having a
connecting station with East-West Rail? So, if we got Rugby-Narborough and
Aylesbury-Brackley, the ‘gap’ between then then intensifies to get re-instated
rail corridor.
c. Political will at all tiers: Chris Heaton
Harris MP for Daventry and Rail Minister as well as other MP’s along the
corridor who can sponsor Westminster Meetings. Simon manages a database for the
ERTA Westminster Team to work on these matters as well as a Government
stipulated rail corridor protection initiative. Needs more people and via Zoom
under present circumstances, to be operationalised now. Guildford-Horsham and
the canal threat was mentioned as another example of trackbed vulnerability.
Once lost, locks growth into roads and that is why GC also has credentials as
providing a rail choice to roads.
d. public: Please recommend ERTA to
others, to join as a member, to attend meetings like today and grow our teams.
9. Appointment of any volunteers and for
what/where/how – answerable to Simon and the Executive Committee (EC): There
were none currently.
10. Any other pre-notified business: There was none except to notify next Zoom Meeting for GC Matters was 12 March 2021 15.00 hours. Would enable updating notwithstanding EEH’s later date of delivery.
Note from item 6*: Midland route out of Rugby/GC through Rugby or variations takes on the western side approach to Leicester of the M1 corridor. Northampton-Market Harborough with a widened base for footpath and railway corridor takes on eastern side of M1 approaches to the Leicester area. We must support both for their own merits, reducing road congestion, traffic and informing modal shift is the name of our game for good social, environmental and economic reasons. Yes, Northampton-Rugby-Leicester may be advantageous asking why we need another line for purposes of optimising demand, but there are other local-regional reasons why we need both.
Please note, it is ERTA’s goal to see the re-railing as we are
convinced it has merit, that is not up for discussion. Finding means-ways and
people to get it delivered is the next step. Northampton rail matters are for
the meeting 19-02-2021 15.00 hrs via Simon Barber T. 0208 940 4399, E. simon4barber@gmail.com
Wednesday, 27 January 2021
Some reflections response to Mr Andy Roden's Rail Article 'Ten Rules for rail reopenings.'
Some reflections response to Mr Andy Roden's Rail Article 'Ten
Rules for rail reopenings.' Published in Rail Magazine Issue No. 923, Jan
27-Feb 9 2021 pages 32-35.
'Experts' (p. 32)
seem the buzz word of standard aim and audience, what of local/lay people aspiration?
Andy declares links to the Northern Route Working Group, Exeter-Plymouth.
Re-railing Exeter-Okehampton is one thing, getting to Tavistock and Plymouth
quite another matter and yet people have been advocating it for years - where
was the railway media then? Many other campaigns have come and gone, largely
un-covered and ignored by obsessive rail media coverage of existing lines,
traction, rolling stock designs, power and pandering to professionals on the
one hand and enthusiasts on the other.
Rule 1: Don't look
back: But if the case is valid and if - given no retrospective inquiry assessed
the issues pertaining to the before and after closures by stealth - if there
was foul play, and new demand now can be detected, action is required now at
the 11th hour even as a rebuild can take decades to bring about - lessons need
to reduce complexity, cost and duration from concept to delivery. We cannot sit
back and say 'blockages prevent reopening' as you surely have to balance pain
and gain? You may say HS2 is a replacement for the loss of the GC Main Line but
does not serve Leicester and probably won't cater for freight except by default
on existing lines which do not directly link Southampton/Bristol/Oxford with
Rugby/WCML and Narborough/Leicester/East Midlands and vice versa for example,
let alone growing catchments around Brackley, Daventry, Magna Park and
Lutterworth for example. The real default of such thinking is that it all goes
to the roads, compounding congestion, pollution and expansion destroys land
more. That in the context of a Climate Emergency seems very short sighted if
not myopic? We are supposed to be de-cluttering roads and informing modal shift
back to rail more through making the network more comprehensive, re-railing and
mixing passenger and freight customer services tuned to what people will
use/do.
If blockages or
opposition meant "reopening simply isn't possible" (p32) HS2 would
never have been built and about 80-90% of reopening in rebuild or select
rebuild/new build terms is ruled out, which leaves a deficit locking in road
demand.
2. Identify your
markets: If you have loads of money - studies are upwards of £100, 000 plus,
then fine, this article is for you. But most people do not possess such, what's
in it for the Bridport’s, Ilfracombe’s, Ventnor’s, Maldon’s and Keswick’s of
this world? The tenor of the article seems to rule them out the game from
differential criterion fronts. Again, it defaults to roads and more demand for
roads but for want of taking the pragmatic true bull by the horns and
re-railing. Lay people seem to be dismissed from:
a. having a view
b. advocating a
scheme as best they may (subjectively)
c. being taken
seriously "ignore part time gardeners..."
Yes, do as much
homework on any proposition as may reasonably be done. But apart from 50
plus years of route abandonment, neglect; the route abandonment then and now
including other and competing uses (cycle paths, walk-ways, canals,
development) means the loss of routes and corridors is ever-present and article
if it had space could have put forward a call to Secretary of State to make
arrangements to protect routes and consider their case merits with suitable
incentives and sanctions to keep options open. Helston may be the proverbial
Swaffham for not reopening and closing respectively, but what of the Dunstable’s,
Brackley’s, Daventry's and Witney’s of this world, do we write them off or
strategic relief lines or duplicate lines? All defaults to spiral roads and disparity,
whilst the existing rail network looks on and people are locked into driving
lifestyles for want of more choices.
Mr Roden's view on
assessing demand seems limited. On the one hand it could be a combination in
normal times such as coastal resorts having all year round visitorship, which
may not have been so common 50+ years ago. Likewise, bus substitutes may be
less cost, but are they as versatile as rail could be were a line-born freight
and passenger growth plan for every line to be mandatory? We have downsized,
airlines and sterilised what the railway can do, so rule out a click and
collect/send parcels depot x per population 10, 000 upwards on the back of
plethora of problem rather than solutions except money can solve most of them
it seems?
Lay people can
make anecdotal but part of the problem has been:
a. lack of support
for route protection/Cinderella status many years.
b. Costs of
studies. One over-arching is not enough, many sub studies on aspects like
engineering, environmental impact, demand for casting, BCR Rating and so forth
exist. It just goes on and meanwhile the routes are under threat as never
before - see Olney in Milton Keynes as a prime example.
c. Complicated
maths and formulas put many lay people off, it is the preserve of the
specialist or enthusiast for complicated maths and problems it seems - Highways
Agency and British Roads Federation and similar do it for roads, who does it
for rail?
d. Other
'political' aspects. E.g., Oxford-Bedford-Cambridge has numerous studies
commanded as a pre-qualifier at huge cost, but continually was deferred for
decades. People saw Bedford-Bletchley and said "basket case, why do we
want more?" contrast where actions of faith did prevail, Oxford-Bicester
was a resounding success. Same line, different approaches and apprehensions. In
short 'can't, don't won't' v 'can-do, will do, must do'. EWRL was pursued after
7 years of knocking on their doors, by a consortium of councils and public
interest has grown and diminished in waves intermittently. We're still waiting
and could be another 10 years before all singing and dancing delivery infill
happens, contrast development of roads/Black Cat Roundabout and houses being
pushed to the fore now. The consortium came about through campaigning and
advocacy by lay people first.
3. Define rail as
a solution to a real-world problem: Examples could be a missing link,
population has grown since closures, other growths, new markets and lack of
choices on strategic corridors or intermittent places needing better
connectivity. There can be a view that the closures from the 1950's -
Serpell (early 80's) were 'political' in nature, rather than purely demand led
for example. The view "not enough people used them" may only be partly
true and the question why, bring up a demand for modernisation to cut overheads
for example and no money for it, so closure was the answer? Bus competition was
much more abundant and subsidised, government switched spending from rail to
road, power switched from coal to oil, surveys of demand-use could be done in
quieter times, avoiding peaks and term time for example. Poor promotion, a lack
of coordination in the original build of laissez-fare - can/do we learn
today?
LRT/Trams
and buses raises the issue of freight – what good for it/can you send parcels
or bikes by bus/tram? There’s guarantee LRT is cheaper per se and horses for
courses, taking to the streets is one thing, adding destinations and populations
to a nationwide rail-net-work is a different thing and scope of the latter
broader providing you get your marketing right. Otherwise all but main lines to
close brings us back to Serpell, which is a wrong way to go if we are serious
about environment, public transport and cutting emissions surely? I feel the
dismissive of Helston as the example with the 10, 000 people scoping contrasts
to the fact that Cornwall is a much sought-after places with multitudes of
visitorship and whilst many drive to/from it and their homes, they do, like Wales,
use the local rails. The treatment of Helston serves as a cautionary note, but
also sad because it makes grim reading for smaller communities being re-railed
and remnants getting upgrades.
4. Timetabling
is vital: The polemic of trade-off may be false or what of harmonisation of
services, timetables and patterns? Versatility including rolling stock is a key
here surely as well? That is why historical appreciation can be telling (see
Q1). Knowing the history – highs and lows, may lead to a SWOT analysis for
fine-tuning a proposition. Growth and the fact many reopenings have exceeded
predicted usage shows a degree of switch from road to rail not anticipated for
example and higher than predicted take-up of a new rail service from Bathgate
to Borders, from Aberdare to Ebbw Vale and indeed Oxford-Bicester started on
just 3 trains a day 1987 albeit on freight-only upgraded track. They all
exceeded expectations and bucked cold sceptics on demand.
5.
Ensure the infrastructure really is up to the job: Unsure who the article is
pitted for, but these issues seem suited to engineers to answer, not lay
people. Lay people (the public!) are part of wider Stakeholder-ship and so
should be included and valued. Again, the qualification seems to be “if you
have £000’s to spend fine” whereas the public and power need inspiring to
bother, to do what they may and should have called for better ladders for
funding access like a level playing field may inform like the un-green example
of £27 billion new roads contrast a mere £500 million Reopening Railways Fund.
What more could more parity inform?
6.
Justify the reinstatement: Okehampton is not a reinstatement, Tavistock drives
because a closure was pre-Beeching does not render them then or now as ‘basket
cases’ by default per se. Many speculative developments banked on growth to the
new stations and only 2 World Wars dented that trend mainly. Had the wars of
been avoided, Great Central may well have survived to this day with select
others.
7,
Siting Stations is critical: I suggest people use what is available and Parkway
status brought nearer to where populations are means less drive time, less
traffic, less emissions, so re-railing is aggregate gain. We need a map and a
plan of coherence and intent, not pontification, dithering and fragments.
8.
Stakeholder engagement is vital: Yes, but if that was true, HS2 would have been
turned down on the back of mass protests to it, they were all over-ruled,
literally!
9.
How will you reopen the railway? You have to start where you are at and do what
you can. However, power closed the railways and so power must by and large
address matters of such scale, cost and challenge. There is a wider
socio-economic and environmental cost if we do not re-rail and needs to be done
sooner than later. Otherwise, we pay for the loss in different ways then,
subsequent and now.
10. Avoid wishful thinking: 45 mph is quite good contrast crawls on roads and junctions of less-than due to congestion in normal times. As long as people can be on the move, speed of itself is not necessarily the main consideration. This especially for local lines serving poorly served rural areas, linking principal local places and ensuring accessibility is more universal, not the preserve of those with time, money or specialist interest. For years professionals dismissed parts or all of Bedford-Cambridge for reopening as ‘pie in the sky’. That cynical approach informed a failure to protect ‘why bother’ (?) the route. Then, when studies found there was a case, a good case, the route by then was sadly lost and now the conundrum of a brand-new route with as many if not more upheavals, challenges and costs is the name of the game, but with development and road proliferation happening now, 5, 10 or 15 years hence beg the question of practicability however worthy the case. So, some joined up coherence here as part of a nationwide approach plan, is what we need our railway media folks to start advocating, not just niche interests and negatives out of reach for most ordinary hard pushed people of any and all ages.
Richard
Pill
26-0102021
richard.erta@gmail.com
Monday, 25 January 2021
Notes from ERTA Meeting Herts Southern East-West Rail Links/M25 Corridor 22-01-2021 14.00hrs
Notes for ERTA Meeting Herts Southern East-West Rail Links/M25 Corridor 22-01-2021 14.00hrs
Present: Simon Barber, Colin Crawford, Richard Pill, Cllr Steve Jarvis, Owen O’Neill, Cllr Nigel Quinton, Cllr Ian Stotesbury and Kathy Keeley.
1. Chairman’s Welcome: Richard and
Simon duly welcomed people.
2. Apologies for absence: Cllr Stephen
Giles-Medhurst, Cllrs Chris White and Jackie Taylor.
3. Background: Several links are in
existence; others present as possible and then there are gaps which moderately
could link up to inform a through route with inter-links with radial
north-south lines and principal places.
4. The Croxley Link to Watford Junction:
It was felt the rail project should go ahead but had stalled following TfL’s
refusal to fund it and a deficit of who will/can? It was felt it should be
terminating at Watford Junction for interchange. It was felt a tunnel linking
it to the Abbey Branch was unrealistic. Likewise, Colin Crawford felt people
for Amersham and Aylesbury can change at Moor Park, rather than use the direct
curve from the Aylesbury direction for dual running, even though it would
enable Chiltern access to the Junction and Watford West and bridge a missing
link between Watford and Aylesbury direct by rail.
- Cllr Ian Stotesbury confirmed the renewal of
Watford Junction Station.
5. The Abbey Branch: It was
acknowledged a new loop at Bricket Wood, but some felt it should be considered
as a public transport corridor of some descript beit conventional rail, LRT,
Guided Busway. Old route to Hatfield has development on it at St Albans.
The meeting did not seem too sure of a new
rail link from Bricket Wood to new freight depot and linking with MML at
Napsbury. The new freight depot was to be rail-served from day one and would in
all probability require a duck-under rail link from the north-south Midland
Main Line slows to it in the Napsbury area. This new depot was given the go-ahead
and is being promoted by Segro.
6. Napsbury Interchange Junction Station:
ERTA has raised the question of whether a new Parkway Station south of St
Albans City on the MML could utilise the depot’s new rail infrastructure and
double up for passenger use as well? The station could serve growing
populations south of St Albans but also if lands are protected, enable the
following to be studied further as to feasibility:
a. Extension of the Northern Line from Barnet
to St Albans Abbey Station (reinstate second bay)
b. A new rail link (same or additional tracks)
veering off from south Napsbury to the east alongside the M25/serving the
London Colney area and onwards to link with the ECML at either Potters Bar,
Hatfield or a north-south junction in between.
c. If Abbey Branch was retained as heavy rail,
the new link to the depot could be extended to Bricket Wood and enable
inter-urban-London Thameslink services to go on to Watford Junction, making
more of the branch infrastructure.
7. Extension of Barnet Northern Line to
Napsbury and duck-under to terminate / share either St Albans Abbey or Watford
Junction or both. It needs studying and coming together of interested
parties to work at it and see the bigger picture, opportunity and again make
the case for funding.
8. New-build local rail link from Napsbury
to Potter’s Bar with ECML link up inclusive of London Colney: This is
thinking aloud but choices remain – either all roads with growth of development
and loss of lands for rail options or we consider what local rail solutions may
offer and work at it.
9. Extension from Cockfosters to Potter’s
Bar rail link: This was raised but again needs studying further and issues
of crossing over/under M25 and what inter-link access opportunities and how it
could link to station interface at Potters Bar – either an underground station
and/or redesign to allow access to a new bay for example.
10. Potter’s Bar to Harlow – Stansted –
Braintree via Great Dunmow/A120 corridor: It was acknowledged that
extending the Central Line from Epping to Harlow could make sense, exact
routing needs studying. Lands in all these scenarios needs protecting and that
costs, balanced to the cost of not doing so. Cllr Nigel Quinton said “we need
balancing rail and development to work together”. There was also the question
of whether Herts CC has examined the issue and question of county-wide
east-west rail infrastructure and the role it could play? The Croxley-Maldon
Link joining up, courts 3 large and powerful counties – Bucks, Herts and Essex.
They could bring formidable influence to their Government to look favourably
and ensuring policy does balance and join up the dots sustainably. Rolling
stock was discussed and eco-friendly. Class 230 by Vivarail are in use on
several lines and will soon be battery powered. They are fairly versatile and
act as an example of what could traverse these lines as infill. Once you reach
Harlow, tracks exist to Stansted and so new build is needed from Stansted –
Braintree for access to the GE Main Line at Witham. Witham – Maldon is a very
few miles of reinstatement, but would create capacity for commuters and inform
all year-round footfall and spend to the resort, famous for shell fish amongst
other things.
11. Witham-Maldon Branch: There has
been local vocal calls for the reinstatement of this link.
This could make a joined-up railway with
shared tracks with conventional local trains and Underground stock services.
12. General Discussion around pros and
cons. What cost to roads if we don’t protect lands and nurture policy for a
joined-up rail corridor? There was heated and muted discussions. It was felt
that our Westminster Team must press Government for land/route protection
measures which are applicable for a number of reinstatement schemes across the
country. It was noted Grant Shapps, Sec of State for Transport grew up in the
Croxley area and is sitting MP for Welwyn, Herts. So local familiarisation
should make talks slicker potentially.
13. Any Other
Notified Business: It was raised on numerous occasions that clear graphics
mapping out were needed to be provided by ERTA. The answer is that we all have
different talents and some excel at mapping and computer software crayoning
more than others. We are voluntary and rely on volunteers to offer their able
services to Mr Simon Barber who is keeping a database of volunteers and work
together with him. Meanwhile we do the best we can, tabling and facilitating
discussion of ideas is at least a start and much needed. Our door is open to
budding talent, rather than same tired people doing everything and collapsing
under the weight of it.
Notes: We will work at
these things and want to build a loose alliance of friendly inclined and
favourable to conventional rail people.
Background: Network Rail's Report talked of a southern east-west rail. Our idea is
seeing what can be done interim, not 2050. Piecing together chunks and bite
sizes, joins a localised rail base network. Unless lands are protected and
buy-in to the ideas are accepted by politicians and councils, development sprawl
will scupper any hope or chances. Then you face the difficult decision of the
middle east-west rail Bedford-Cambridge section of which is a lesser of
two evils route.
Croxley could be done.
Whether a tunnel under WCML south of station off Croxley to feed into
Abbey Branch is feasible is unknown, but needs studying as to pros / cons.
Bricket Wood to get a loop. Needs direct link to freight depot and
Napsbury Junction Station with duck-under to join slows and onwards to serve
London Colney and split/integrate with extended tubes from Barnet which in turn
could go under Napsbury and terminate at a second platform at Abbey/make more
of it.
London Colney-Potters Bar or north thereof - Harlow, links with lines to
Stansted. Stansted-A120/Great Dunmow-Braintree Branch link up has long been
called for but nil action.
Finally, there is a localised call for the Maldon Branch to be reopened
for commuters to the main station at Witham.
So, pieces coming together informs a localised east-west link with
principal lines and places not well served by rail east-west. Saves going into
London and checks traffic growth on local roads in normal times.
Moving such ideas forward is the heart of the discussion. Hope this
helps.
Please liaise
with Mr Simon Barber on offers to help: T. 0208 940 4399,
E. simon4barber@gmail.com and campaigns-wise richard.erta@gmail.com likewise any amendments to these notes. https://ertarail.co.uk/events/
Tuesday, 12 January 2021
Road v Rail Event - It is time for a national plan of modal shift from road to rail and that means local rail reopenings and nurture.
This event is free apparently and 'open to all': https://www.eventbrite.
Oxbridge East-West Rail Event and Thought
There will be an important conference/event: https://