Thursday, 23 April 2020

More Freight by Rail to and from East Anglia and The South Coast to English Heartlands


Rail Magazine Issue 903 April 22-May 5 Pages 48-55 and then pages 56-57, the demand-capacity issue has to be weighed with radial lines, the legacy of closures and what gives or takes going forwards. Werrington Duck Under is being implemented. It helps ease pathing on the ECML, but given there's growth demand for more freight from East Anglia to Doncaster for example, a brand new strategic link from the March area to the Spalding/Deeping St Nicholas for example would seem logical as paths between Ely and Peterborough are going to be premium, yet this is not listed as a goer in the articles rather a Peterborough-Wisbech-Kings Lynn new railway; which raises the question, where are we going, are we singing from the same hymn sheet, who is the director-lead person/s and what is the dynamic plan? Bedford-Cambridge east-west rail will probably not be a freight user friendly design line and the gap is surely between North London Line and the great way round Peterborough-Nuneaton. Meanwhile the A14 and A421 do a roaring trade in user-demand for more roads with wall to wall juggernaut movements east and west, let alone the A47.   

What is willing to take a lead and say we, like Rotterdam to Germany, need a new, direct freight line (which could have passenger workings in gaps) to get freight direct from East Coast to West Midlands. Otherwise the conflict with London centric interests, environmental concerns and junctions like getting through Leicester just proliferate. Southampton has issues with Reading bottlenecking and can't run direct to East Midlands, which gets all the lorries whilst Birmingham gets all the trains! Something along the lines of a new direct Peterborough-Northampton for M1, DIRFT and wider proliferation on the one hand and Great Central via Oxford to Leicester direct, albeit with a new link at Narborough would seem logical.  


Update 23-07-21
2. Our twin railway solution:




Monday, 13 April 2020

Round up of rail views - why Northamptonshire a special case?

Wellingborough is a difficult area whereby A45, Whitworths, The River Nene and an Industrial Estate south side and besides the river, the arm which linked to the MML is blocked with housing estates.

On Bedford-Northampton there is a sense we have been up hill and down numerous times. The article in the April edition of the Railway Magazine sums up where we are at, but Milton Keynes has two arms, one says “yes we want the railway” and the other says/allows a load of development to block the old route both sides of the A509 and puffing out northwards meaning that a realignment or bypass or new construction of about 5 miles may be necessary - we may have to leave Olney out and benefit from end to end timings. The town council show little faith or vision in the reopening and currently we are working with businesses for a Light Rail at the Northampton end and lobbying all 5 councils to get on board as a complimentary scheme to the core East-West Rail scheme.

On Great Central, our call is Oxford-Calvert area of east-west rail and a new spur onto GC metals and new bypass rail-wise of Brackley and onwards with a study to examine routes around and through and linking WCML in the Rugby area - a new route along criss-crossing the Canal corridor east of Willoughby/west of Barby with new station and linking via grade separated junction where the Northampton Loop Line bears off from the WCML main lines. North of Rugby alongside M1 with a new chord to link onto Nuneaton-Leicester with the route via Knighton-Burton helping as a wider freight relief whilst passenger links to Leicester and East Midlands heartlands. Likewise, the Banbury arm of the former link with GC is obliterated with development and M40 for example.

On Bedford-Cambridge, Whitehall have made it clear the new route is 'it' and will not be changed now. We are calling for junctioning at Tempsford with ECML for the benefits you reference including Peterborough-Oxford freight sweep. East of Tempsford/ECML is as is and understood. Yes, we are fairly flexible, as what is is what will be and if they bodge it up, at any rate half a railway will be better than none. Still leaves a freight by rail desert between North London line and Peterborough-Nuneaton lines - a considerable gap.

On Northampton-Market Harborough - yes, we support it. It could appear we want all reopenings, but Northampton radial links are a special case in point as it is a major logistics hub as per Milton Keynes, both of WCML, both on M1 as an urban attachment and yet both without direct rail links to East Anglia and Felixstowe for example. Local authorities commissioned a study for Northampton-Market Harborough and Network Rail were involved, but where it has got to now, notwithstanding lock-down, is not known to us. But the idea is Oxford-MK-Northampton-Leicester passenger links and freight via Leicester to the Oxford lines taking on Northampton depots and DIRFT enroute. It is about deriving at alternative means unless and until a means-ways-support scope for more direct lines old or new or somewhere in between, can be done. 

Our association supports select others doing their campaigns in other areas and very much seek to fill gaps on the one hand and act as an enabling entity to empower others to get involved and indeed where suitable take a lead.

You are very welcome to join us or liaise or help out. Some are enthusiasts and that can run away with them, others look at evidence or seek to bring it about and resources are scarce. If you think you can work with us and find common ground, by all means. It is an 11th hour for some, many rebuilds/reopenings and we are lobbying Westminster to tighten up and incentivise Councils to protect old formations and realignment spaces - as yet PPG13 is a toothless tiger on the ground sadly. You may find our Blogspot of interest:

Our door is open and hope we can work together where we may agree. A Daventry West station on GC line is laudable, and would also act as a P&R for Southam via the A425. Some other documents can be found via our website publicity page: https://www.ertarail.com/publicity-page 

If someone did an article for Rail Magazine putting our views across and started a debate referencing us somehow, that would be a welcome thing, as we have had a blanket silence on our aims because of their polemics over HS2 and claims we want the whole GC rebuilt with knocking down premises galore through developed Leicester-Nottingham-Sheffield for example, which we have not proposed. If HS2 can bypassed Brackley using our route, a conventional line alongside with a station should also be studied in the frame, otherwise the area gets blight and intrusion of a high-speed line and no means to access it for benefit, which seems somewhat perverse.

A pity East-West Rail may not go south of Aylesbury? One wonders who makes these decisions, ditto ignoring our calls for a Retail Park Station serving the Kempston area south-west of central Bedford, 18, 000 population is Kempston Town and more out of centre parking is needed. Studies were done 20 years ago, but no-one locally seems to be keen to pursue it.

Tuesday, 7 April 2020

Olney fresh development threats and ruinations

Land West of Yardley Road/ Aspreys Olney - Leonard Lean had phoned me on Saturday at about 12pm stating that a new Planning Application had been submitted for that site which lies to the south of the old Cobbler Line track-bed. You will probably recall that a Planning Application had been submitted for the site about 3 years ago and evidently the developers had since revised the original bid after it had been first approved. Consequently both Leonard and I have since responded to the consultation for this new Application. See https://publicaccess2.milton-keynes.gov.uk/online-applications/ (MK Council Ref.20/00835/REM). The Case Officer is Jeremy Lee and the consultation closes on Thursday, 23 April.

Thursday, 2 April 2020

Bedford-Northampton Rail Link coverage

Bedford-Northampton Rail Link coverage

The April 2020 edition of The Railway Magazine page 38 has an article on Bedford-Northampton rail link for your kind perusal. It does show that the spade work is with Local Authorities and what will it take? In 1987-1994 we had exactly the same issue then over rails east of Bedford 'no case, therefore no need to protect' was the gist and taken another way 'no need to protect, as no business case and therefore no need to study (to see if one can exist!)' Brackets mine. How do we break the log-jam? I welcome ideas, comments and suggestions please. I know that I am unfortunate on local councils whereby they seem to bypass, ignore or do exact opposite - whether in the public interest is a matter of debate. A lesson may be that rather than look at blockages, look at possibility scenarios. Yes, exact Bedford-Sandy is ruled out now, with focus being on Tempsford instead, but they found a way round the blockages and so new railway interpretations like cracking the Olney proverbial nut, is what we would expect a study to consider just as the EWRC et al have done on Bedford-Cambridge. We need partners to take the campaign forward. Current situations apart. I think the man who interviewed me has given it a fair spread and we thank him for his engagement with us.

On the issue of trackbeds and preservation versus reopening for regular Network Rail style lines goes; I can't see why you could not have a twin track solution - one bi-di signnalled at speed for NR rail and the other preservation with perimeter fencing as usual between the two. Indeed if in open lands, could a third track to make the NR one double just be a matter of broadening the trackbed with suitable landscaping and drainage? Northampton-Market Harborough could be a case in point, and we are aware of elsewhere where such measures need evaluation like Guildford/Sandford-Cranleigh for example and beyond.

Please give your support: e. richard.erta@gmail.com / https://www.ertarail.com/publicity-page


Wednesday, 25 March 2020

Memories - what could have been.

Trawling through my remnant archive, I found this picture of us at St Mary's Hall, 1988 Huntingdon Public Meeting - left to right Richard Pill, Steve Wilkinson, Peter Wakefield, Peter Hayman, the late John Clark and Colin Franklin. Well attended meeting I recall. Now we have a new route, passenger only specification (?) but a railway in the pipeline non-the-less. Hope of interest. Second picture is Blunham looking east over being built Station Court and west towards Bedford old trackbed to the right.






Tuesday, 24 March 2020

ERTA Update and North Downs Line Theatre

We may not be able to meet anymore, but we can liaise and do on-line work and use spare time/capacity to get jobs done.
Network Rail offering to implement a turn back off the Brighton Main Line to Reigate. Laudable - frees up waiting on through tracks/creates paths and capacity. But whilst I would urge you to write and add your support, please consider the bigger picture and advocate that also:
1. Electrify the North Downs Line to Guildford and
2. Semi fast Thameslinks to Guildford
3. Include Reading electrification as a Phase 2
- frees up changing twice and taking Underground from St Pancras to Waterloo for example.
4. Sandford - restore direct curve and track to Cranleigh and it could clear and cater for trains from both Guildford and Redhill directions, clearing tracks for other services.
5. We want rebuilding of Guildford-Horsham-Shoreham. One project, but may have to be done incrementally?
Please interject your views and where you feel able, give support via the Network Rail consultation.
Feel free to email and exchange/chat with your Executive Committee any of our work, projects, ideas and aspirations and for example on project work, if you feel able to make a contribution beit pretty diagrams, data gathering, photos or whatever, feel free to contribute/offer. There's no need for splendid isolation and boredom! We can keep in touch if we wish via email and so on. e. richard.erta@gmail.com

https://www.ertarail.com/become-a-member-or-donate


Tuesday, 17 March 2020

East-West Rail Bedford-ECML Section

I have put a mini paper together for consideration please. The consultation and working up procedures should look at pros, cons and costs of both route options and let the people decide. Ditto a junction versus a station with the drawbacks a station would mean. We need to optimise scope of the physical re-railing theatre, not restrict to passenger only and then changing trains,. waiting time and costs contrast direct, cheaper and competitive end to end timings of buses for example. 

Please work with us and liaise. There is a sense that the Borough is ignoring us and our contributions and has gone for a golden bullet option only which is 'as long as it serves Bedford Midland we don't much less care on anything else' which misses the point. Understandable, but we have a once in a lifetime chance to get this railway right and need to weigh the wider context carefully. No-one is saying 'go back to the drawing board' but for example, our southern route avoids the new Black Cat Roundabout and new road work configurations north of Little Barford/St Neots area, whereas the new route would have to cross the A421 / A1 and face gradients into/out of the Great Ouse/Ivel Valley. Once again, from Clapham-Milton Ernest to somewhere north of Ravenden to Tempsford, people get all the intrusion of a railway but no gain as their beef is a direct road arcing the north of Bedford for A1/A421-A6 transits without a 16 mile drive around Bedford via Kempston and Biddenham et al.

It needs dialogue and an inclusion in the frame of what we are suggesting is a more advantageous option. If Government cannot rule dispensations for level crossings where sensible to have them, then that needs looking into. They work perfectly fine with standard rolling stock triggering automatic engagement. In this respect, we should be looking at lengthening platforms of numerous halts along the Bedford-Bletchley line with some borrowed Turbos from Chiltern, to send these ex London Underground stock elsewhere. They seem unsuitable for the safe operation and reliability of the line, the exact same issues bedeveiled the former Railbuses on the Bedford-Hitchin line and we know what that led to - diminishing numbers and pre-Beeching closure and the rest is history!

We need to put Kempston Town on the Railway map (Bedford-Bletchley with a connecting footbridge to the Retail Park with extra parking off Southfields Road, Kempston. Likewise, were the southern route to prevail, trains could come through Bedford Midland from the north including a rebuilt Bedford-Northampton rail link and go off east or west on segregated tracks post getting through Bedford Midland either way.