Saturday, 31 October 2026

BRTA Essex Forum at Witham Saturday 7th November - All Welcome

 The British Regional Transport Association (BRTA) is a voluntary membership based association: https://brtarail.com/become-a-member/

Our membership is open to all and we welcome people to join and help advocate for the causes we believe in. Principally, we want the following:
1. The government to restore the 'Restore Your Railway' fund and procedure to make local rail reopenings of local railways for passenger and possible freight, more amenable, do-able and help check and balance growing congestion, pollution from too much traffic, not enough rail choices and capacity issues on the network.
2. We want the government to inform a nationwide programme of local rail reopenings. The longer they postpone it and the switch of money from new roads to new local-based rail links, the better for the nation and us all. 
3. We are not asking for new money, we know it is tight, but a switch of government priorities which puts people, places, land use, the environment and modal choices to roads at the heart of governmental departments and tiers of governing and planning at all levels. The push for growth without protecting former routes and new routes is catastrophic as it locks in dysfunction, overcrowding and polluting congestion from day one. This must stop, we are not against growth, we want it on a sustainable platform.
In Essex, we wish for support for:
1. Extend the rail link into Stansted eastwards to link with Colchester and/or Braintree to reunited by rail east and west Essex. A new Parkway Station for Great Dunmow could be added. It would ease congestion on the A120 for example and boost existing public transport networks. Stansted is due to grow, but no requirement to invest in extending the railway nor protecting a corridor for a rail eastwards have been set aside amidst huge housing developments bereft of rail access.
2. The Lower Thames Crossing is £11 billion, at a time for many other calls, the government is saying £no money" including local rail reopening agendas. It will link Kent and Essex by road, we have called for it to be a rail-based provision instead, enabling more freight and passenger movements by rail, cutting congestion, pollution and waste. Norwich-Ipswich-Colchester-Chelmsford-Kent and the Channel Tunnel and vice versa sustainable visitorship, footfall and spend could be the real oyster of gain, instead areas will be blighted by congestion, delay and loss of open spaces.
3. A rail link to Maldon is tabled, but some believe an alternative route is possible. We wish to see a study on it and make the case to add to the list of nationwide local links by rail which could make a huge difference to inward footfall and spend to the resort, and easier commuting with less drive time going out.
Our agenda and details are attached and we clome your kind support. Other events appear on our events page on our website: https://brtarail.com/events/ Thank you. ceo@brtarail.com

BRTA Essex Forum (Witham) Saturday 7th November 2026 starting 1pm food and 2pm business at the Batesford Court, 100-102 Newland Street, Witham, Essex, CM8 1AH 01376-504080 Convenor Simon Barber: admin@brtarail.com 020-8940-4399 and 07522-374740

Agenda.

1.   Appointment of a chairperson

2.   Appointment of a note taker

3.   Introduction to BRTA (3 sentences)

4.   Sign the attendance List

5.   Apologies for absence

6.       Stansted Airport Expansion (to Braintree)

7.       Lower Thames River Crossing 

8.       Maldon Branch reopening – what route, pooling resources for a study and build the case.

9.       East-West Rail including Stansted-Braintree/Colchester?

10.                         Cambridge-Haverhill: Nice idea, is it feasible, demand may be overwhelming, but the practicalities and onwards to Colchester? Direct freight that way to East-West Rail instead of London?

11.                         LT Central Line to Harlow? Does it need a study?

12.                         Existing Rail/Buses issues and services – adequate or discrepancies?

13.                     Any Other Business

14.                     Day, Date and Time for next BRTA Forum at Witham for Essex?

Notes: BRTA is only as good as a growing, contributory and reliable participatory membership informs – please join/donate today! https://brtarail.com/become-a-member/

~ Get Essex sustainably moving minus the emissions roads bring! ~



Wednesday, 28 October 2026

BRTA Press Release 28-10-2026 Northampton-Bedford today, nationwide policy tomorrow?!

 FOR IMMEDIATE RELEASE

The British Regional Transport Association (BRTA) has welcomed confirmation from Network Rail that discussions, draft proposals and technical work relating to Northampton's future rail connectivity are currently underway as part of wider transport planning.

The confirmation came in response to a Freedom of Information request seeking information concerning potential rail links associated with the proposed Universal Studios UK Resort, East West Rail, Northampton Gateway and the former Northampton-Bedford railway corridor.

In its response, Network Rail stated:

"We hold some of the information you're looking for."

The organisation further confirmed that the request relates to:

"a variety of discussions, draft documents, proposals and other scheme information that are ongoing and which have a bearing on a larger piece of work still in progress."

Although the information has not been released at this stage, Network Rail stated that the material is being withheld because it relates to ongoing work and unfinished proposals.

BRTA Response

Richard Pill, Chief Executive of the British Regional Transport Association, said:

"This response confirms that discussions and technical assessments relevant to Northampton's rail future are taking place. While the documents have not yet been disclosed, it is important that Northampton remains fully represented as these discussions progress.

The proposed Universal Studios UK Resort presents a major opportunity for the wider region. Northampton is one of the largest towns in England and should be fully connected to the economic and transport benefits that emerge from future investment.

The BRTA believes there is a strong case for examining all opportunities to improve east-west connectivity, including proposals linked to East West Rail, Northampton Gateway and the reopening of the Northampton-Bedford railway corridor."

Importance for Northampton

Professor Andrew N. Williams said:

"This response demonstrates that discussions are taking place and that some technical work is underway. While the documents themselves have not been disclosed, it is encouraging that these issues remain under active consideration.

Northampton's residents, businesses and institutions will naturally wish to know whether the county's largest town is being fully integrated into planning for one of the most significant single economic developments in modern British history.

Unless there is bold action leading to significant investment in railway infrastructure serving Northampton, there is a real risk that the town could fail to secure its full share of the economic and transport benefits arising from the project.

The Government has recently committed £1.3 billion towards transport infrastructure associated with the Bedford area and the proposed Universal destination resort. To date, Northampton has seen no equivalent commitment despite its size, strategic location and economic importance.

For many years there have been growing concerns that Northampton has been overlooked in discussions about rail investment despite its strategic location, growing population and economic importance.

Northampton should not be an afterthought. It should be an active participant in conversations about the railway network of the future."

The BRTA is calling upon Network Rail, East West Rail, local authorities, Members of Parliament and central government to ensure Northampton's transport needs are fully considered as future rail investment proposals develop.

Improved rail connectivity has the potential to support economic growth, widen access to employment, reduce dependence on road transport and help ensure that Northamptonshire shares fully in the opportunities arising from major regional developments.

ENDS

Notes to Editors
Freedom of Information Reference: FOI202601914.
Request submitted to Network Rail on 28 September 2026.
The request concerned the proposed Universal Studios UK Resort, East West Rail, Northampton Gateway Strategic Rail Freight Interchange and the former Northampton-Bedford railway corridor.
Network Rail confirmed that it holds relevant information but declined disclosure under Regulation 12(4)(d) of the Environmental Information Regulations 2004 because the material relates to ongoing work and unfinished proposals.
The British Regional Transport Association campaigns for improved regional rail connectivity and the reopening of strategically important railway routes.
Media Enquiries

British Regional Transport Association (BRTA)
 Email: Richard Pill ceo@brtarail.com and Professor Andrew N. Williams anw@doctors.org.uk 07923 489254

 Website: https://brtarail.com/b2n/

Blogspot: https://brtarailvolunteer.blogspot.com/   









Monday, 26 October 2026

Protecting former rail routes, studying credentials for reopening and not writing off, is essential for more rail-based modal chocies!

 The British Regional Transport Association (BRTA) sees and hears the cries of many commuters that it does not take much for the existing rail network across the South East to get overcrowded; one hitch can ripple across the network resulting in delays and cancellations.

With the push for growth through development, without more and better railway infrastructure, duplicate routes and indeed, new routes tapping into new flows and enabling quicker journeys; exacerbation of dysfunction in transport on and off the rails, is highly likely.

We are calling on Government to protect former rail routes to help keep reopening options open and study proposals to explore if there is in fact a case for reopening/new-build and pursue it in the name of modal choices, cutting road building blight and reducing congestion and harmful pollution.

On rail routes to Brighton; Lewes – Uckfield is one; but the push stops short of pursuit of reopening. On the matter of Shoreham-Horsham-Guildford for direct running to/from Reading and Heathrow; getting commitment to route protection and deviation lands as well as studies to make the case (BRTA is not resourced to do so); is what is required to optimise reasonable recovery. National Government has a pivotal role to play and people can email their local MP in support of the BRTA calls: https://members.parliament.uk/members/commons?sort=1

BRTA is voluntary and welcomes members of the public to join and offer to help as volunteers. We welcome all ages and backgrounds as long as people can be reliable, flexible and work with the grain of what we are seeking to achieve.

Please see our website for more: https://brtarail.com/

This is the time for action!



Sunday, 25 October 2026

BRTA Update - going forward as a team

 Outlining key challenges - the model repeats. Mind the gap! Northampton faces disenfranchising unless a new rail link to Bedford gets government push, not indifference. Likewise, Bedford-Cambridge rail link, needs a new vote on routing, ours stands as the best. Northern Route unsatisfactory, bypassing Bedford southern route then has Universal blocking it and our route needs editing of 1000 houses at Willington to ensure a twin track railway with electrification can get through. These sorts of issues repeat, failure to protect rail routes and lack of government commitment to treating road and rail fairly; is the root of the problem.

1. BRTA Well Being: We face a mammoth task whilst larger groups like Railfuture and Campaign for Better Transport (CBT) seem to have lost their way somewhat. Laudable to be resourced to publish reports and call conferences, but unless the vital spade work of protecting routes is well peopled, organised and being done nationwide; the effort falls down.
BRTA is under-resourced. Our goals are clear:
a. push as much as we can for a nationwide government supported programme of local rail reopenings, select pieces of new-build and existing rail upgrades and capacity enhancements.
b. a programme of former rail routes, lands and especially where junctions existed, to be protected from non rail related intrusive development. We must have former rail routes and new proposed route corridors kept open for possible future reopening/rebuild. Failure to do that at least adds to cost and upheaval and closed down modal choices in a context of growth, development and exacerbates all the bads of road building agendas and their spin-off consequences and impacts.
2. In order to do that, we need a steady flow of people joining, donating and providing reliable volunteering on fronts we need filling and strengthening BRTA internally with reliable administration, ensuring the Executive Committee on and off line is quorum and ensuring the proper lead-management of the forums, which can play a role, but need proactive follow up, marketing and team building.
3. Update on Campaigns:
a. Great Central Corridor Old Oak Common to Leicester Central: Like all other reopening route options under attack and pressure. It needs a team loosely working together in a coordinated manner. Great need for it, HS2 is not a silver bullet and we ideally need both, and if you, like me, believe conventional rail is essential now, then join in with us to help progress our projects.
b. Gloucester-Ross-on-Wye-Hereford. We need local people to join, take a lead and help usher the feasibility study it needs, protect the remaining corridor and deviation spaces. 
c. Twin Track Rail Bridge across the Severn Estuary, much needed to give more capacity for more by rail. It needs someone to court council and other outlets to support and get a study done.
d. Guildford-Cranleigh-Horsham and Shoreham: West Sussex County Council admit it would be a god-send now, but in the name of encroachments are pursuing a policy of proliferated abandonment and blockages more! Such belligerent beggars belief when all they are doing is adding to congestion, new roads and traffic blight, when they say they want a better environment?! The project needs a team to work on progressing it.
As Campaigns Coordinator, I can give guidance, but I cannot pursue every campaign myself, sorry, but that is unrealistic.
4. Area Reps: You can do your own forums on and off line, recruit members, build a team, delegate down and advance the cordoned agendas as laid out on our website. You don't have to do it all, but doing something, liaising and sending up updates for dissemination, is the minimum we do need please. Everyone needs to be tolerant, able to forgive discrepancies and get on with the tasks set before us conjointly.
Area Reps are needed for North West, East Anglia, West Midlands, West Country (Wilts, Hants, Gloucestershire and Bristol area for example). 
We have 50 members, we need more like 500 members. We will do our bit; but must be a team effort. Organising any 5 people in any constituency to email their MP in support of BRTA is powerful, costs little time and yet if that model is repeated, turns interest more to us.
Thanks very much.

Yours sincerely,


Richard Pill
BRTA CEO











Saturday, 17 October 2026

Re-Rail Dunstable! A commitment is needed.

https://brtarail.com/dunstable/

The British Regional Transport Association (BRTA) calls for support for re-railing #Dunstable! Much is against it on all sides and ways, but rail delivers footfall, spend and regeneration in its wake which few other options do. Dunstable is caught in a catch 22 whereby Central Bedfordshire Council is too spread out and under resourced to strum up such a vision, pluralism melts when singularity and focus demands dedicated commitment!

In a nut shell, it is a clear choice #Luton (separate Unitary Council) and Dunstable which they need to determine and decide on principally "Busway versus Railway" in modal choices, futures and directions. Busways are cheaper, but do not do bulk, rarely inform modal shift from cars to rubber wheeled buses and concrete renewal is an on-going cost, do bus revenues justify it? That leave Dunstable out on a limb from the rail network and 5 miles to the nearest rail station, is a set back to well-being in numerous ways to get out and go anywhere by rail beyond the mere locked-in 'locals' which buses only agendas inform sadly majoritively?

BRTA would welcome people to join, offer reliable voluntary services and help over a 20 year period nurture policy and practises which move Luton and Dunstable towards a shared rail link re-conversion and benefits shared. It needs a study on confirming the case, why and how and scoping for taking it forward to link Milton Keynes with Luton Parkway Railway Station. Integrated to Thameslink, it offers a bolt-hole off the Midland Main Line (MML) enabling more trains to serve and go through Luton Railway Stations.

Existing stone freight sidings at Luton could be relocated to a new freight servicing depot adjacent to the main line at Sundon, enabling a new 5 track, new under-arch at Hitchin Road Bridge and a duck-under to plough through existing Luton Interchange with a railway - bus shared land space with a new Luton Railway Booking Hall.

BRTA makes suggestions, plants ideas but a study can work up practicals and leaders must decide if the re-railing is a sense of direction our leaders at all levels wish to go over a 20 year plan, relocate, policy and development strategy? National Government has a role too and people can email their local MP's to call for support, research and working up tangible options to give the public a say, a choice and invest for the best outcomes. Contrast this to the staus quo languishing of the two town centres.

Likewise, with growth approved, £billions pour into the profits of London Luton Airport and associates, a portion of that money should be re-directed to invest in re-railing a new Luton-Dunstable-Milton Keynes rail link and an eastward extension via the #Knebworth area to link from the south to #Stevenage and enabling onwards to #Cambridge for excample. Not either Oxford-Bedford-Cambridge versus Milton Keynes-Dunstable-Luton and beyond, we need both, serving different markets, different populations, complementing each other and enabling more by rail, lowering congestion, pollution, ill-health and bringing tangible benefits on and off the rails.

Our diagrams are illustrative of a vision, they need working up to a specification; but our faith and what we hold out, is if taken up and progressed, everyone will benefit from local to regional and integrated to the national too! ceo@brtarail.com