Showing posts with label roads. Show all posts
Showing posts with label roads. Show all posts

Saturday, 12 August 2017

All aboard the Flitwick vanity trip! Reopen Ampthill Railway Station for relief.

The reality is that Flitwick is about 10 miles south of Bedford Midland Station on the Midland Main Line and a 10 mile arc at least, draws a load of people from outside Flitwick including Milton Keynes overflow, M1 via A507, Marston Vale extensive new developments and Wixams all commute by driving south and catching a train. That arc east-west of some 15 miles won't want to drive along the busy A421 to Wixams but go south, saving fuel and rail costs to Flitwick for Thameslink to the City of London et al. ONLY an Ampthill Station can give the land-use capacity needed to ensure the long term relief to Flitwick and Ampthill of being a large on-street car park for non residents. Central Bedfordshire Council are opportunist and head in sand if they believe anything different. 10 years growth will render current development plans inadequate and besides Flitwick has not got the road layout for peak time overflow of traffic. Bypassing from Westoning to A507 east of Flitwick for A6 access via Clophill may be something to consider, but if infill housing to Greenfield goes in, then a bypass is scuppered locking-in the congestion and single bridge concentrate. 

http://www.centralbedfordshire.gov.uk/news/april/flitwick-regeneration.aspx

See also and join us: https://www.facebook.com/ReopenAmpthill/

ERTA is the successor to BRTA. We have updated and changed our contact details, posted below this email. Please update your records accordingly. 

Those keen on an Ampthill Station can follow these links:




We very much welcome any support. Main website is: https://ertarail.com/ampthill/

Please follow the links, supporting does not have to be heavy or a chore, but many hands make light of hard work. The campaign can be successful, but it needs local people willing to come forward and to team up. Meanwhile if you wish to be on this list the email is ampthillstationreopen.brta@gmail.com In any case we will keep people updated if anything turns up.  Ourrichard.erta@gmail.com is the main email address and all on it get our pdf electronic newsletter.

Many thanks. If you don't wish to be on any email, let us know, ideally sending original email to help us locate you. 

Please do feel to pass on to friends and all are welcome to our meetings for liaison, interest and networking opportunities. Thank you.

Thursday, 26 January 2017

Olney Neighbourhood Plan Publicity Consultation

Mackowiak, Marek <Marek.Mackowiak@Milton-keynes.gov.uk>
Today at 16:38
Dear Sir or Madam,

In January, Olney Town Council submitted the final version of its Neighbourhood Plan to Milton Keynes Council. The Plan is now being published in accordance with Regulation 16 of the Neighbourhood Plans (General) Regulations 2012. This is the final stage to make comments on the Plan.

The Plan and its supporting documents are available to view at:


Any comments on the Plan at this stage (including those from members of the public and other organisations) will be passed to an independent person to consider when he or she is examining the Plan.  He or she will consider whether the Plan:
-              Meets a number of basic conditions
-              Satisfies the legal requirements for neighbourhood plans, and
-              Identifies an appropriate area for the referendum.

As part of this process, the Examiner will decide if the Plan should proceed to the Referendum stage, which is where local residents will have the opportunity to vote on whether the plan should be made (adopted) and used in the determination of planning applications in the area that it covers.

As this is the final chance to comment before the Plan goes to examination and then on to Referendum, it is important if there are any outstanding concerns you have regarding the Plan, that they are raised now for the Examiner to consider.

Comments should be sent to: Development.Plans@Milton-keynes.gov.uk

by 5pm on Wednesday 8th March 2017.

Kind regards

Marek

Marek Mackowiak
Planning Officer


T: 01908 254573
marek.mackowiak@milton-keynes.gov.uk

Milton Keynes Council | Development Plans| Civic Offices | 1 Saxon Gate East | Central Milton Keynes | MK9 3EJ

ERTA wants the railway rebuilt between Bedford-Olney and Northampton. The original route is blocked at Olney and the Handley Alignment (above red line) shows how those blockages can be overcome and link the old trackbed east and west of Yardley Road and River Great Ouse to the east. We want to ensure that the route option is retained and kept 'open' to allow rebuilding of the railway in a way that best suites engineering. Therefore any ambitions to expand the town of Olney northwards either side of the A509 is a threat unless tailored to protect the green-space railway corridor. If expansion goes ahead, the stupidity of it is that Olney has a major traffic issue. A509 has a lot of continuous traffic trundling through Olney. A bypass has been said to be a death-knell for the town's small businesses but equally many of the cars, vans and lorries do not stop and besides Olney has a lack of parking in relation to those who wish to park and volume to space ratios. Thus a car park with a railway station north of current built Olney could double up as well as improved lanes and paths and crossings for encouraging cycling, walking and public transport options in an integrated manner. The railway would deliver volumes of people contrast roads only which just erodes the otherwise pleasant surroundings. Please help us by responding to the consultation and mentioning the benefits and merits of reopening the railway which should be supported by the Town Council. To discuss further e. erta.9rails@yahoo.co.uk or join ERTA: https://ertarail.com/membership/