Tuesday, 4 August 2020

Great Central Corridor Re-railing

Great Central Corridor Re-railing between Oxford/Banbury/
Woodford Halse or Oxford/Bicester/Calvert and Brackley-
Woodford Halse and onwards to Willoughby, Rugby, Barby, 
Lutterworth and the Leicester/Nuneaton Lines Gatewaying to/from 
East Midlands Direct.

Who
The English Regional Transport Association (ERTA) is an unincorporated voluntary membership-based association which takes a particular interest on the agenda of forwarding better public transport especially rail around the English Regions.
It has a growing membership across the regions and welcomes more.

What

Our concern and interest here are the re-railing of the former Great Central corridor which we believe could play a significant role in the areas and inter-regional connectives it could serve for both passenger and freight. It is not born of nostalgia but of the fact that if we are serious about climate emergency matters, modal shift pro-active is an essential ingredient to get traffic volumes, congestion and pollution down and re-railing incrementally is a key part of that.

Where

The section of Great Central corridor we are focusing on is in scope between Calvert and Narborough and possibly Banbury and Northampton as an interceptor link with mutual benefit. Places like Brackley, Woodford Halse, Willoughby, Barby and further north Lutterworth need re-railing. They are busy areas, loads of upgraded roadways, but a long way from rail connectivity.

Why

Currently trains between the triangle and all between Southampton/Bristol and Leicester/East Midlands have to go via London or Birmingham. This means few paths are available, restricts growth and takes capacity other trains could utilise.
GC re-railing would enable. Freight, South Coast-East Midlands, South West and Wales-East Midlands and all in between and vice versa.

East Midlands being a gateway to wider distribution networks. Currently there’s a feeling that East Midlands is being shadowed and second fiddle playing to West Midlands spotlight and both should be equally getting new/reopened lines and investment to optimise potential and that sustainably with a view to environmental impacts. That means rails and this is a prime example. The ambition of vague ‘defaultive capacity’ created on the backs of HS2 for example, still leaves no direct rails to/from the East Midlands but via London and/or Birmingham and that is a capacity problem compounded unless new/rebuilt rail links are provided like this GC re-railing idea. Passenger-wise direct access ‘not via Birmingham or London’ means Cross-country could be beefed up to offer more diverse services like Penzance/Paignton-York/Scarborough via Oxford/Banbury or Bicester/Brackley – Leicester and East Midlands principal stops and vice versa. New audiences and new markets.

A real chance for rail to woo off roads reliance to rails and a Nottingham-Bournemouth service is also potentially in the frame as well as new links and services between East Midlands/Leicester/Burton and Derby for example to Marylebone (London), Old Oak Common (via Princes Risborough or a rebuilt Calvert-Grendon link), Heathrow (a link between Chiltern Main Line and the Guildford-Heathrow Southern Proposal has been made to the DfT in numerous communications) and finally via a new chord onto the east-west rail Oxford lines via Bicester to Reading for example and via the Didcot avoiding lines to Bath and Bristol for example. In reverse these new flows to Leicester and beyond offer sustained flows of footfall and spend, visitorship and exploration including access to the Peak District if the Matlock-Buxton line is reinstated and Sheffield-Manchester via Woodhead. All called for rebuild in recent years to take traffic pressure off the road system and cut emissions as a result whilst enabling more mobility to all.

How

The missing rail links are between the Oxford-Bletchley line – Brackley – Woodford Halse/Banbury-Woodford Halse-Willoughby-cross WCML/M1 on new viaduct to cross back to either serve Lutterworth or a wider area station and freight interceptor station east of the Mi with links between rail and the merging M1/A14/M6 Junctions and onwards to west of M1 to link anew with the Nuneaton-Leicester existing lines. At Knighton freight for further afield and indeed a diverse passenger alternative to Leicester could be to divert to the Knighton-Burton line for quick access to Derby with connections. The Knighton ‘Ivanhoe Line’ and Leicester access lines could share the passenger and freight business on offer and enjoy more apiece. There would be plenty of business and benefit on offer and buoy up any business case and that could work back as a plus for the case to re-rail by return. It needs backers, funding study support and on-the-ground action.

Calvert or Banbury - Woodford Halse

Our original proposal wanted to take a spur off the being rebuilt Oxford-Bletchley lines onto the redundant GC trackbed to south of Brackley and via a new descent to raised trackbed in the valley to go to the east of the town intercepting the busy A43 and a bus link to Silverstone to make the most of the catchment served initially by a railhead station. The old formation was lost years ago with demolition of the old viaduct and houses built to the north of the old station. Thence a Phase 2 would be to extend to the north of the GC trackbed unimpeded with more or less relay to Woodford Halse where some realignment or relocation deal would have to be struck.

Now HS2 wants to utilise the old GC formation adding extra complication and cost and the ‘throw everything at Calvert area’ by multiple schemes of one sort or another means getting a chord onto a new domestic line alongside HS2 is potentially problematic. Moreover, the trackbed or alongside new domestic build to that of HS2 would require more land and some demolition/compulsory purchase upheaval. That is always controversial even as big brothers seem to have more ability to assume that displacement role than domestic others. So, getting to north of Brackley and indeed serving Brackley is the most expensive bit, complicated and controversial. North of Brackley, with HS2 veering away to Solihull at a north-westerly angle, we assume the old trackbed.

Another suggestion has been to utilise existing tracks and rebuild a new rail link north of Banbury to Woodford Halse with modest distances and negotiations, albeit would have to negotiate M40 and HS2 and maybe some smaller developments en route. This gets you there quicker, this cuts the cost of the Brackley link, but also means Brackley is still disenfranchised by being served by rail.

Once in the Woodford Halse area we proceed to south of Willoughby (new station) and a split with a link off serving Barby and linking to where the WCML fast and Northampton Loop lines diverge on a graded flyover which going south would veer to the west. The other GC route – old alignment would go into Rugby and have a second station (Rugby Central) and cross the WCML via new viaduct.

Our view is we don’t mid overly. Both have merit and should both be studied. If HS2 brigades were to offer to passively design rail access for domestic link to serve Brackley, that would be a kind and welcome gesture given they have no intention of providing such a station.

Both options should be studied and weighed on their merits. In terms of getting things done, the cheapest, least protracted option and quickest to deliver should be done.

Direct link to Rugby Central and beyond
We have already mentioned our suggestion of getting into Rugby (WCML) for linkage (passenger and freight). The old Rugby-Leicester formation and line would have been useful even as far as where they intercepted with the GC/M1 area so a loop and chord onto the GC ‘new build’ could be considered.

Deviations around built areas would be required. But again, the idea of a new link between Rugby and Leicester with their connectives commends itself for consideration. Likewise, a direct new viaduct GC cross and go alongside the M1 to Lutterworth/A14/M6 Junctions and onwards crossing back over or under M1 to lands west entering via a new chord to descend to flat junction link with the Nuneaton – Leicester lines.

You could have a west and east junctioning, which from the Nuneaton line direction, would enable early GC access and reduce transits along WCML between Nuneaton and Rugby for example or vice versa accessing WCML or West Midlands via Nuneaton. It is all direct routing, all new capacity and catering for growth not just on existing lines or default, but instigationally. You cannot have default capacity if the lines don’t go where the business is and that is plundering road congestion, not competing between rail companies!

Summary of Passenger AND Freight Benefits:
  • Direct AND Default capacity creation
  • Re-railing a corridor unserved nearby by rail access
  • Taking on the roads, not other railways and operators
  • Open access, open to all
  • Provider of infrastructure must benefit from use
  • Outlying area re-railed giving modal choice
  • Regions better linked not via Birmingham or London dependent
  • Direct, faster uninhibited access enabling more by RAIL
  • Enabling and underpinning sustainable growth
ERTA, 24c St Michael’s Road, Bedford, MK40 2LT (01234 330090)
Join our free email loop/request this as a pdf:
E richard.erta@gmail.com

All support welcome.
1. Join ERTA
2. Join Our Teams
3. Give funds
4. Write to MP's and Councils
5. Trackbed watch and object to potential threats
6. Encourage bids for Reopenings Funding Grants to study further
7. Let's together over-come the problems and re-rail this much needed rail solution!





Friday, 1 September 2017

Better Rail Links for Northampton

Re: Northampton-Bedford rail link restoration

Northampton’s strategic position means it gets a lot of north-south and east-west traffic. A key logistics and population centre it reaches gridlock congestion and a high content of juggernaut lorries on both M1 and the east-west A14-A45-A43 and vice versa cross roads based on urban Northampton. This cannot continue to grow without some rebalancing between road and rail. For that to happen we need Northamptonshire County Council to see the strategic need and case for reopening the rail link, the benefits for Northampton and wider county and table a cross border consortium to vie in the market of calls for reopenings nationwide for this specific reopening regardless of other projects, agendas or happenings. In short it needs a sustained, incremental nurturing which softly-softly delivers a realisation that it is a strategic missing link with a new revitalised role to play and robust market to serve in the 21st century.

There need be few costs. Tabling the Consortium and gathering support from private and public sectors, realising funds for commissioning a proper feasibility study (Bucks County Council allocated £100, 000 for one looking at rebuilding a new High Wycombe-Bourne End link for Thames Valley – East-West feeder arc).

Northampton-Bedford has many attributes as to why reopen passenger and freight and some of these are detailed in my booklet published earlier this year priced £4.50 + £2.00 postage. But integrated Thameslink (Luton Airport/Northampton link via Bedford) and Northampton-Bedford-Cambridge East-West Rail integration. If Bedford-Cambridge has an east-north axis rail link, then Felixstowe-West Midlands freights can go that way via the Leicester south curves. However, Bedford-Northampton enables access to Brackmills, Northampton, DIRFT AND the West Midlands. Side benefit is the freeing up of many paths on the West Coast Main Line (capacity) to enable more passenger and freight services, all taking traffic and wear and tear off our roads, cutting pollution and contributing to better public health and ambiance (sell-able asset!). We must not throw this away, we must nurture support – University of Northampton and stewardship of the trackbed bordering their Waterside Campus an early winnable port of call, getting Olney Town Council to believe reopening is do-able and to protect a route around the town – a new route or recovery of a route is required is a study in itself. But the key gain for Milton Keynes is more trains serving Central Station, without Bedford-Northampton West Coast paths are premium and restricted, informing over-crowding, pricing management and more traffic on local roads than otherwise could be the case. Nice as letters saying “I/we support…” are what we need is for you to:
·        Work at forming a consortium
·        Gather support
·        Work with us/liaise
·        Keep it as informal as possible until we get a break through of all on board end to end of the line.
·        Encourage business to be involved – less congestion helps them, therefore it is in their interest to lend support, acumen and leadership
·        Win over the East-West Consortium to give it credence by making the case of what a ground changer this project could be for all its projects and interests.

ERTA holds events and tables an informal forum in Northampton and we welcome people to meet with us, offer support and work with us to move things forward, which is the only way chances for success can be realised. You can see our diary on: https://ertarail.com/events/
The reality is that development goes on regardless, to make development sustainable we need the rail link restored. It has been on the Secretary of State’s desk twice in the 20 years I’ve been involved with the campaign, one of which was 2004 with the London South Midlands Multi Modal Study (LSMMMS). Network Rail’s GRIP process escalators projects towards recognition and potential adoption. We must not think of the branch line steamy past, but of a robust passenger and freight by rail opportunity, save the countryside and cut urban squalor and blight congestion informs. The railway would boost footfall and spend to both our ancient town centres and restore local sense of underpinning and a sense of well-being whatever the future throws up. Thank you.

Yours sincerely,



Richard Pill

ERTA Chairman


Could people respond to this consultation and suggest that a Northampton-Bedford rebuild rail link should also be integral to Oxford-Cambridge railway renaissance for inclusion and to ensure the freight by rail shift aspect is not compromised? http://www.englandseconomicheartland.com/Pages/engagement.aspx