Friday, 11 February 2022

ERTA Ampthill and Flitwick Forum: Saturday 30 April 2022


Agenda for Ampthill-Flitwick Forum: 

Saturday 30 April 2022, 1pm food, 2-4pm business, The Swan Pub, 1 Dunstable Road, Flitwick, Bedfordshire MK45 1HP T: 01525 754777 E: steph@theswanflitwick.co.uk It is adjacent to the Thameslink served railway station and with ample parking and bus links too. https://www.swaninnflitwick.co.uk/menus/ Everyone is responsible to pay for their own food and drink.
 
1. Introduction and welcome by Chair of the Meeting
2, Apologies for absence
3. The pros and cons of an additional Wixams style station on the slow lines for Ampthill with foot-cycle access off of Froghall Road, motor and bus access from both Industrial Park entrance and from the west off Fordfield Road (linking A507 west with Steppingley and Flitwick West side of Midland Main Line for parking and foot/cycle access). See: https://www.bedfordindependent.co.uk/preferred-design-of-wixams-train-station-revealed-with-2024-completion-still-on-track/ For an idea of what a new station like Wixams could look like.
4. Local needs and issues: public transport, better access, footfall and spend, connectivity with elsewhere and equal spread of opportunities.
5. Environmental considerations: traffic versus wider journeys by public transport
6. Growth of development for the two towns and how that is best managed in terms of wider impacts
7. Commutes/commuters, landscape constraints and better links for cycling and buses between the two towns and principal others like Milton Keynes and Silsoe/Shefford A507 corridor?
8. Any other transport-related business.
9. Next steps: Forum facilitation, canvassing support for updated studies, Area Rep/Join ERTA and raise public support generally.
10. Date, time and place of next meeting, ideally in Ampthill
To help with leafleting or general enquiries contact either Mr David Ferguson –

E. daferguson1212@gmail.com Mr Simon Barber – E. simon4barber@gmail.com T. 0208 940 4399

Write in support of a new station to:

3. MP for Mid Beds: Ms Nadine Dorries https://members.parliament.uk/member/1481/contact

Please seek a skype meeting and sound out on station, a. any objections, b. what and why details, c. have they read the report and other stuff on our website? d. what are their solutions? e. Wixams example of twin track slow line station could be made to work and feed local buses more. f. If local buses go, rail is likely to be more permanent. g. Housing comes to A507 now, so immediate and wider commute/P&R possible. Safer cycle/walk to Engine and Tender Pub/High Street via Station Road and/or along bypass to The Parklands, all possible more for any so minded. Town centre about 10-20 minutes walk for most people. Connecting bus loop for wider area not impossible. h. Wider catchment, Flitwick is in a part valley, all lands built around, so expanding parking a capacity issue with growth including commuting to London from Marston Vale as well as access to Centre Parcs. i. These combinations makes me feel land protection, investment in studying further and supporting the aim, goal and principle is worthwhile courting support where it counts surely including a public survey? j. the putting Ampthill on the railway map would bring footfall and spend, more kudos to the location and boost options for residents in access terms. 
These pro-points should be born in mind surely/are they?
Support, join our loop and help us make progress: richard.erta@gmail.com

Ampthill delusions and exclusions! The saga for keeping options open remains our quest!

On the 2nd March 2022 we received the notice of deliberations of the Ampthill Town Council regarding the station idea for the said town. It had a well-used station until 1959 and was closed due to economy more than usage. Population has doubled since then even locally and 20 years ago, when a study showed it could be done still, the objection was too far from the town centre! Now subsequent development has filled in the gaps so that it is continuous development between Town Centre and A507 former bypass onwards to the industrial estate. The town council’s views were:

·                    Ampthill is adequately served by Flitwick Station,

·                     Active travel and public transport links to Flitwick exist, and ATC’s priority is to support and work towards improving these,

·                     ATC is concerned about encroachment onto Greenbelt land beyond the mainline,

·                     Current railway development proposals (such as East West Rail) are towards fewer stations well supported by active travel and public transport links.  A proposal for a station at Ampthill is contrary to current trends and therefore not a good use of council time or investment.

·                     If you support the railway station lands being protected to keep the option open, the station idea being studied further and pursuit of reopening please write to:

1.Ampthill Town Council, Ampthill Town Council, Park Lodge, Ampthill Great Park, Woburn Street, Ampthill, MK45 2HX.

2. Central Beds Council, Priory House, Monks Walk, Chicksands, Shefford, Bedfordshire, SG17 5TQ 

3. For emails and elected councillors see websites: https://www.ampthill-tc.gov.uk/ and https://www.centralbedfordshire.gov.uk/directory/14/your_councillors/category/67

The ERTA Response:

1. Ampthill and Flitwick are close to each other, but that is not unique on the rail network. Luton and Luton Airport Parkway are just one local example.

2. The railway station at Ampthill would provide more capacity for rail usage, parking and riding which Flitwick, due to the fact the lands around it are all built up with non-railway development, cannot expand more. So as growth returns to the network post-pandemic, these issues and that of local aggravations through on-street parking will be exacerbated more.

3. Buses are being cut left, right and centre and are not a fixed asset. Whereas railways, especially a main line are more permanent notwithstanding a complete outburst of Government folly! The railway station, serving all south of Wixams, Marston Vale, Milton Keynes, M1-A507, Centre Parcs to the west and A6/Wrest Park/Silsoe to the east would serve about 15, 000 catchment, leaving Flitwick with an equivalent amount. People tend to drive south in the commute to London, as it saves fuel costs and gives drive-time which many value for time to themselves.

4. Land west of the Midland Main Line to Fordfield Road, was tabled as to be developed by 2030, so ideas of Greenbelt seem at odds with that intention? Relocating the Industrial Estate in part to the west with road access from the west, enables more and a station which could benefit all, not least year-round footfall, spend and visitorship as well as employee access minus land-use parking demands.

5. The comparison with possible proposals to close stations on the Bedford-Bletchley Railway as part of as plan by East-West Rail are hardly comparable with the spread of distance or demand for stations on the Midland Main Line served by Thameslink’s on the slow lines which could, at 4-5 each way per hour could be staggered in any case to ensure a good half hourly or thrice hourly frequency.




Wednesday, 2 February 2022

Great Central Corridor Re-Railing is essential to avoid default congestion on roads more!

ERTA's schemes and calls are of local, regional and nationwide interest and impacts - re-rail is positive, to not re-rail default to roads more which is wholly negative. Not anti car, but be pro-choice is a better policy command generally. 

We invite your support and help us find champions for our causes please. Use what power you may have, we need you to help take our ideas on to a next level. Timescales of Government and agencies seem too long given the Climate Emergency, however informed. 

Great Central Re-Rail Corridor Conundrum

Given HS2 takes the whole land take of the current and former Great Central alignment and beyond in width terms, that translates to a scuppering of the former Claydon Junction where GC fed onto the Oxford-Bletchley rail line. Therefore, any new re-linking of an Aylesbury-Claydon-Milton Keynes arm, will need a junction further east unless a new spur from north-east could be done at Bicester? Therefore, some have suggested any new rail link north towards East of Brackley (Brackley East) would have to either take more land east of the proposed Aylesbury-Milton Keynes arm or wherever the link is made, to have a northern curve making a crossover junction. It needs studying. But before even that, we need a universal or specific buy-in to the idea of a new domestic line north of Claydon to serve places formerly served by the Great Central rail corridor, not served by HS2 and which are growing catchments. Places like Brackley/A43 interception with links by bus with Silverstone from a station (rail head) interchange, Woodford Halse, which has an estate built on the former GC line (bad stewardship!) and onwards via new alignment to serve Willoughby, Barby and links to the West Coast Main Line and/or Northampton Loop Lines for running a. into Rugby LNWR, b. running towards Northampton and c. going further north possibly. If a backer could be found to the idea and principle, it could be studied and fine-tuned to a credible proposition. Thinking aloud here, but as these and associated areas grow and HS2 will not cater for them, all traffic will go by roads and that means more congestion, hazards and impact, not least air quality and environment. So, all to play for, no use moaning after the horse has bolted! Today is the day for decisions, actions and consequences, positive or negative. 

If someone got to former Rugby Central and made a park and ride southwards from there, would that be so bad? Numerous places, Bicester being a local one, have 2 or more stations and beit bus, LRT or other linkages have been fostered. Why are we so reticent about 2 stations? Worcester has 2 stations and now a linking junction station. There are probably other examples people can think of. 

Born of 19th century private enterprise to get railways built for commercial reasons, competition and own-brand mattered and rivalry between rail set ups did not help. Ditto what land was available, remember many were reticent or hostile to railways. Post nationalisation, BR spent time and money to try and reconcile these diverse stations with links and/or closures and running trains (where possible) to merged hubs. Leicester, Manchester and Birmingham are larger examples, growth informing now that more than one station is needed and spread gives room for footfall and spend and enjoying the place accessed by rail. Rail bypasses of major urban areas also need looking at and Sheffield and Leeds should not be destinations of themselves, but a recognition people want to seamlessly travel beyond major places to other locations. Come the day when direct running from Nottingham-Glasgow via Leeds-Carlisle railway is ‘normalised’ rather than changing and segregated railways? ON GC Corridor, there’s good reasons to sort a rail corridor out and back is and avoid the fall out of abandonment. 

Whether local, national or regional government and/or agencies, were needed to come away from ‘weather man’ sort of general drift analysis of ‘corridors’ without defined specifics of what rail reinstatements will go/new builds too where. Avenging planning blight was once a no, no, now we have planning allowing development without rail-based infrastructure defaulting to roads more, hardly environmentally savvy. England’s Economic Heartlands (EEH) seems arbitrary, remote and lacking hands-on specifics beyond the set up of East-West Rail and associated being seen as a model of threshold set up for being taken seriously. What of EEH having its own rail-based agenda beyond existing lines or works in progress, to become champions for our GC Corridor Re-Rail scheme? Can local authorities and MP’s support such? ERTA has an idea, but lacks a champion for it. 

Time is running out as piecemeal development after piecemeal development scuppers corridors plethora of former alignments and possible deviations – Olney being the classic example! A new build on a new route is possible, with less pain if not cost than trying to negotiate with Olney in relocation terms, but a little more beefy support from councils, agencies and Government generally, could have informed development with accommodation of the rail link. Armchair critics say “once closed, can never be reopened” knowing full well closures of the 1960’s were rigged and put-upons and leave default if we don’t reopen, to roads, fossil fuels and losses not least locked-in disenfranchisement creep on a comprehensive scale. They have no real solution and lecturers or not, should be challenged – who can and will? Doing something different is one such possibility and GC Corridor Re-Railing seems to be a good example where ‘something rail-wise, just needs to be done’. The future belongs to us all, but powers have a special responsibility to care and take an interest. Please do.



A reader - the electric car revolution, does not tackle the volume of traffic and wider impact and implications. We do need closer and more modal chocies like local rail can deliver if treated equitably. https://sourceable.net/we-cant-build-our-way-out-of-traffic-congestion/


Agenda for ERTA Aylesbury Forum: Saturday 9th April 2022, 1pm food, 2-4pm business
The Bell, 40 Market Square, Aylesbury, Bucks. HP20 1TX T. 01296-388080
https://www.jdwetherspoon.com/pubs/all-pubs/england/buckinghamshire/the-bell

1. Appointment of a Chair for the meeting and minute taker (come prepared!)

2. Calvert Scenario: HS2 takes the land former GC railway and associated Claydon Junction took, so any new domestic Aylesbury-Milton Keynes link will need new alignment alongside or further east of HS2.

3. Junction off East-West Rail and linking with Aylesbury ‘arm’ to east of Brackley and beyond. This is not reinstating the Great Central, rather a new domestic rail extension to serve the former GC corridor which HS2 will not cater for (provide a station between Solihull and Old Oak Common). Growing development and associated road traffic impacts and floods to existing and Winslow stations. The corridor could extend to link all south of Aylesbury with Rugby, Northampton, Magna Park, Lutterworth and Narborough for Leicester-Nuneaton (see diagram overleaf.

4. Aylesbury-Princes Risborough-Old Oak Common domestic (is Calvert-Grandon lost due to HS2 land take?). Benefits of terminal bays at OOC for Chiltern as terminal capacity into Marylebone is premium.

5. Beyond Old Oak Common (Denham-LSWR lines) and (OOC-Heathrow – Woking-Guildford and beyond) and vice versa.

6. On a new Aylesbury-Milton Keynes arm, should be in proximity to HS2 and a new station for domestic access and another at Claydon to share the load more?

7. Any Other transport-related business.

8. Day, date, time and place of next meeting. All support welcome, stay in our loop/join ERTA.

All offers to richard.erta@gmail.com please. ERTA contacts generally:

Mr David Ferguson – E. daferguson1212@gmail.com,

Mr Simon Barber – E. simon4barber@gmail.com T. 0208 940 4399

Tuesday, 25 January 2022

Leicester, Capacity and Northampton-Market Harborough Rails

Leicester, Capacity and Northampton-Market Harborough Rails

Ø     Leicester is not just a gateway to the East Midlands Region; it is also a gateway from and pivotal part of the East Midlands. That diversity means it is a place people want to get to, through and from for a variety of reasons and purposes and that the mode they choose to use will be centred around norms, costs and access options.

Ø     Northampton is supposed to be part of the East Midlands Regional take, but also comes into the sub regional sphere of South Midlands, yet Northampton has no direct rail link connection with Leicester/East Midlands and vice versa.

Ø     Reopening Northampton-Market Harborough would provide multiple links and serve numerous markets. There’s local, providing a rail choice, currently lacking along the A508 corridor and challenging the M1 which does link Leicester and Northampton of modal choice and market share for people and goods more by rail as part of modal shift and environmentally ‘greening’ agendas.

Ø     Northampton – Market Harborough Rail Link offers Oxford/Watford-Milton Keynes-Northampton-Leicester and beyond and vice versa. That is new linkages of expanded populations which were not present when the line shut as part of the Serpell Report of the early 1980’s. Yes, the passenger service was with drawn during the 1960’s, when Milton Keynes was not built and Northampton half its current size or less, but was used for freight until the end.

Ø     A curve could be provided at the southern end from north-west for direct running from Felixstowe and anywhere else to the inland port of Daventry International Rail Freight Terminal (DIRFT) and vice versa. The line could also serve the new Northampton Rail Freight Depot as well as wider north-south and making use of east-west (Oxford-Bletchley) for rail to grow into a larger inter-regional share of markets.

Ø     Capacity on the Midland Main Line (MML) is constrained apparently. But ERTAs solution is to have a new Bedford-Northampton ‘not via Olney’ line constructed which would enable some diversionary traffic off MML tracks between Bedford and Market Harborough which in turn would create more paths for MML services (passenger and freight). Looking at electrification north of Market Harborough-Sheffield could coincide with widening the MML and tracks through Leicester to service more rail-based operations. Where can be done, it should and is long overdue for such a consideration.

Ø     The issue of business case, should warrant powers that be taking an interest, studying and making the case to tick boxes of candidacy to court what investment may be available for more and ultimately progressing the delivery of these rail links. The can’t, won’t and don’t mantras of arm chair critics, even so-called rail ones, should be challenged with pro-active pursuit of this rail agenda, as those critics are consigned to a roads only 20th century tunnel vision which does not see rail as pivotal except big spend footprints like High-Speed solutions. We may need both, but leave it to them and half-baked more of the same is most likely to be the default in short roads, roads and more roads with congestion!

Ø     Widening a green corridor for incorporating twin track rails, cycleways and footpaths will take some doing, but short-medium-long term, could be plan-directed to adapt terrain to it.

To support, join our free email loop via requests to Mr Richard Pill richard.erta@gmail.com


Media Coverage: re: recent Northampton area press-media coverage.


Thursday, 20 January 2022

ERTA Horsham Public Meeting 26-03-2022 'Open to all' - all welcome!

I attach a poster for our Horsham Meeting and welcome help to get people to join us for that meeting. Apparently a retired solicitor is challenging the decision to allow the canal and a rethink may be that the councils involved will consult further and give more opportunity for the rail to be further considered as part of any plans. Remember, we only lost by 1 vote last time, so much to engage with. For more information, please compare notes with my colleague, Mr Colin Crawford: Mobile 07836-693977 E: colin.crawford1@btconnect.com  Thank you.

Please object to the canal threat to the former rail trackbed. Email this letter now!






Thursday, 13 January 2022

 

13 January 2022
Press Release
ERTA Calls for people to consider becoming 
“reliable assistant volunteers”
The English Regional Transport Association (ERTA)’s vital work across the regions demands growth of reliable, assistant volunteers, to help us better service existing commitments and to be in a better position expand our efforts. Volunteering with ERTA can provide useful experience and CV filling as well as enabling others with time, talent or both to contribute and give-back to the national interest. The key roles we want people to assist with is:
ü    Leafleting beit Great Central Corridor re-railing, Horsham, Bedford and elsewhere – it is exercise, must have own transport and a modicum of common sense. Reliability is key.
ü    Research, fact finding and putting cases/coherent arguments together for advancing our projects. Guildford-Horsham, Horsham-Shoreham, Woodhead, Northamptonshire and London.
ü    Forum and helping with marketing meetings: Horsham, Leicester, Bedford, London and elsewhere. Getting people to our forums, engaging positively and helping advance existing goals and policies, as well as identifying new and ensuring they are resourced.
ü    We request people consider joining ERTA as a Member which gives more rights and enables Committee work and inner echelons to better function. Qualities are reliability, admin ability and keeping sight of what we are trying to achieved and getting the balances right.
More information can be found on our website: https://ertarail.co.uk/ and/or join our email loop via requests to richard.erta@gmail.com, attend forums and tap in to what we are doing and explore what you can offer in terms of time, talent, recruitment and resource generation. As a team, we can aim for turning the tide from fragmented railways to route protection, year-on-year rail reopenings agendas; cutting congestion, emissions and waste by re-railing people, places and glaring gaps in the national rail network of a local, conventional type.  
End Press Release
Further comment or contact: 
Mr Richard Pill, ERTA Chairman 01234 330090 
or richard.erta@gmail.com




Tuesday, 11 January 2022

Sara Homer/Brackmills Rail Link News

An update from Brackmills Northampton.

The Brackmills Industrial Estate Business Improvement District is forming a GID (Green Improvement District).

This will form a coalition between Brackmills, Delapre Abbey and the University of Northampton (Waterside).

Our aim is to create a triangle between us to enable all the three factions to work on reducing congestion, emissions and to make the area a cleaner, greener area to live and work in. The idea is to improve easier and better ways to commute to and from work and to also improve fitness of our employees, residents and students that live and work in the area.

This should give us more of a voice to apply for grant funding and any other available monies to move forward to the potential of re opening the railway track on Buryport Road. This will run from Brackmills, passing by the University of Northampton at Waterside on Mid-Summer Meadow and finally stopping near to town centre.

To be on Sara’s email loop send requests and support to: sara.homer@brackmillsindustrialestate.co.uk





‘Open to all’ Public Meeting

Meeting to explore, discuss and update on the re-railing of the Brackmills Railway Branch for better public transport.

Saturday 26th of February 2022, 2pm-4pm

Brackmills industrial estate ltd.

C/o In N Out Autocentres

Brackmills business park

Caswell road.

Northampton.

NN4 7PW

 

Meeting for lunch* at The Lakes Pub, opposite Brackmills off the A428/Bedford Road, Northampton from 1pm  https://www.hungryhorse.co.uk/pubs/northamptonshire/lakeside/

 

For further details, please contact Mrs Sara Homer, CEO of Brackmills Industrial Estate: sara.homer@brackmillsindustrialestate.co.uk

Brackmills BID m: 07891016896