Sunday, 8 March 2020

Kempston Retail Park Station needed now please!

Kempston Hardwick needs a car park for kiss and ride and could have a picnic site or some housing developed for more footfall. However it is ages away from the Retail Park Kempston and that is where a new station serving it and Kempston Town should be picked up on and if you have any influence, please feed this into their hub:
a. 2001 circa Steer Davis Gleave 100 extra off peak rail users per day
b. 1500 car park full x7 days a week all day long
c. Kempston is 18, 000 population
d. cycle network can be developed
e. made design planning stages -circa 2006- but lost to a few votes for fear of local election back-lash - some in Magnolia Close fear its rammifications
f. Owners were okay to share costs in a study, Borough not apparently keen/forth-coming yet found capital funds to try and broker a deal for MML Wixams
g. Parking could be expanded south of Southfields Road with connecting foot-cum-cycle-bridge linking town and Retail Park
h. Retail commands 2 buses an hour, busy roads, long delays (Ampthill Road)
i. Loads of potential
Happy to discuss further, but conquer the Retail Park conundrum and numerous gains on and off the rails. Shuttle should be seen as temporary - lengthen halts to 4 coach and electrify medium term?
If you agree please let the East West Rail Company know your views and join our email loop richard.erta@gmail.com and/or come to our local forum via Richard Pill 01234 330090
https://eastwestrail.co.uk/get-in-touch#general-enquiries

Saturday, 7 March 2020

Wey and Arun Canal Threat to Trackbed wanted for rail reopening

07 March 2020
Press Release

Canal Threat to former Guildford-Horsham rail trackbed – ERTA leads to effort for route protection

The Wey & Arun Canal had recently submitted a planning application(with very little consultation) to enable the canal to take over part of the Downs Link, which is a footpath and bridleway connecting the North Downs near Guildford and the South Downs near Steyning in West Sussex .It is used by people such as walkers, cyclists, joggers and horse-riders. The Downs Link utilises the former track-beds of two disused railway lines, which used to link Horsham with Guildford and Shoreham respectively.

If the canal extension goes ahead, the section of the Downs Link would be sacrificed for its users, particularly local people who live in the village of Bramley. More significantly, the Downs Link protects the track-beds of the former railway lines which the ERTA would like to see re-opened following several new housing developments and population growth along the track-bed corridors. The increased population will increase road traffic which is already horrendous at times along the A281 Guildford - Horsham road. The re-opened railway would also provide a direct link between Brighton and Guildford (and beyond). The Downs Link therefore could be slewed beside the re-opened lines being separated by appropriate fencing (including a hedge) to keep out children and trespassers accessing the railway.

Several objections have already been made to this planning application to Waverley Borough Council (Planning ref. no WA/2020/0004), including some from organisations such as Sustrans and the Ramblers. and comments can still be received up to 31 March 2020 to consultation.planning@waverley.gov.uk. Alternatively, write to Waverley Borough Council (Planning and Building Control), The Burys, Godalming, Surrey GU7 1HR ". Further information and liaison Mr Simon Barber: simon4barber@gmail.com T. 0208 940 4399

End of Press Release

Further comments via Mr Simon Barber simon4barber@gmail.com T. 0208 940 4399



We may have been over the benefits before and through our engagements have learned of the problems associated but remain hopefully problems can be seen as challenges and challenges can be overcome. For example, some see the reopening in isolation, whereas we see it in the context of improvements to the rail network in the round such as electrification of the North Downs Rail Link (see inside newsletter) with a new curve from Shalford direct into the Cranleigh line would enable an East Croydon-Redhill-semi-fast to Horsham via Cranleigh and loop back via Three Bridges to Gatwick and back (see map attached). Likewise electrification of the North Downs Line would enable semi-fast Thameslink Trains to access Guildford and save changing and trekking to Waterloo for people coming from north of London for example. 

Through trains exist from Cambridge to Horsham, why not Guildford as well? Likewise the Brighton Main Line is like many local roads, full and needs relief lines. Our Guildford-Horsham-Brighton via Shoreham rail link would enable access to and from the South Coast to Reading for wider diasporas, direct and 'not via London'; freeing up seats and saving people cost as well as time. It is all good for the environment and could inform an all year footfall and spend minus the land use demand for ever more parking spaces if you opt for a roads only option and doing nothing to support these rail options is precisely what that delivers. Some have raised the issue of same corridor used by a canal, a cycleway and footpath meaning no room and a conflict with calls for a rail link. However, could the canal interest be sent by an upgraded river course, could the trackbed of the railway be widened in places to accommodate more - a 'green' corridor than mere remnant trackbed? Likewise footpaths and cycle tracks can be slewed and re-worked to make way for a rail link, whereas railways need formations in-keeping with their engineering requirements.

What we wish for is an accommodation, policies commensurate to protect the route and widening and a formation of a consortium of councils and other organisations to pool resources, apply to the Government's Rail Reopenings Fund and commission a study which could include looking at these seeming conflicts and how an accommodation could be rendered as part of an overall vision, plan, leadership and direction of travel.

At Cranleigh and elsewhere, could a deviation around the town be planned to ensure the passage of the railway and a new station to give ease of access on and off the railway? These things need to be looked at, mere passivity leaves them hanging in the balance whilst population, infill development and impacts on communities go unchecked and roads only outcomes; which is bad for conservation, air quality and the environment we all would proffer to want to protect and cherish. It should not be seen as a threat, rather a chance for renewal and the benefits of a railway and local access. This can be true elsewhere also.

I therefore would encourage support for this rail link and associated schemes to upgrade existing lines to enable more by rail. The English Regional Transport Association (ERTA) hopes to (when unlock occurs) table forums at various places to more engage the public and grow a consensus following to help inform more and better pressure for supporting this rail link. We believe it should be supported and kept as a live option and welcome your kind interest to that end please. Thank you.

Copies of our Brochure PDF can be obtained via requests to Mr Richard Pill via richard.erta@gmail.com


Thursday, 5 March 2020

Getting an integrated Bedford-Cambridge rail link on right lines?

An alternative option or second route for freight and consideration of a proper linking junction at ECML interface, forget station, they exist at St Neots and Sandy already, so people can travel direct by rail to Bedford if the physical junctioning rail links are done. The angle of approach is wrong from the northern current EWRL route option, whereas from Willington following the southern side of the River Great Ouse trajectory you approach north of Station Road, Tempsford and South of Little Barford - a flood plain - from the south easterly direction, for onwards to Cambourne and so forth. A new station is wrong and not needed. We want a railway able to cater for freight and passenger trains. Reversing into and out of Bedford Midland can happen on segregated lines. Please wave it to others and invite them to think again or go for a dual route option - but put a junction, not a station at ECML interface? Just a thought.


You can disagree, but have to accept passenger only and ask the question will people from East Beds/Peterborough-St Neots really change at another station and wait with cost for a train to Bedford, than integrated with Thameslink direct to Bedford for example from the East and vice versa?

I received the following from the DfT. It makes little sense to me as anything south of High Field Road Oakley would clash with Clapham surely? Personally, whilst I welcome a new railway it is likely to cater for passenger services not freight. That is disappointing. I thought if it went north of Oakley to somewhere in the Milton Ernest area, you could resurrect the idea of a station to serve the villages of North Beds and as a junction station could do north-south and east-west. In about 1989 Milton Glebe was mooted - should the idea be refloated? It will be interesting to see the plans and how it will configure. At Tempsford it will have an interchange station with the main line, but will people from East Beds and St Neots want to change trains, taking time and money when buses do both direct? Rather would prefer physical rail links so Stevenage and Peterborough to Bedford were possibilities as well as the Cambridge link. Likewise at Cambridge following a south easterly direction from Cambourne it is a 160 degrees curve to join a north-south main line heading towards Cambridge and a 10 mph curve from Cambridge to the single bore tunnel Newmarket line. Working back, it is vital Northampton-Market Harborough reopens for freight via Peterborough and Leicester. If we want to declutter paths on the Midland Main Line, alternative route options need to be revisited. For my money, eastwards of St John's Bedford and to the north of built Blunham to approach Tempsford from the south westerly direction and head off to Cambourne via a north easterly direction with physical rail conenctions for diverse services - passenger and freight. We get one chance at this and unless Thurleigh Airport is to be revisited, a comparative to the old route into Bedford should be explored on practicability, cost, gradient and optiumum usage/usefulness.
Bottom line is a railway is better than none, but it won't be all singing and dancing unless these things are thought through. richard.erta@gmail.com 





Getting the Brackmills Branch Moving towards re-railing

Monday, 2 March 2020

ERTA Newsletter March-April 2020 available by request pdf email

I attach the newsletter and a final chance for pre-booking to come to our conference which is filling up, but still has plenty of spare places. Please support this event as if it goes well, it bodes supportively for more and helps us get our message across, encouraging others to take an interest.

ERTA continues to need more resources in the form of reliable people coming on board and donations are welcome via our bank account: HSBC ERTA Sort Code: 40-45-27 Bank Number 92086808

These help us with production of flyers, brochures, venue hire and practical things - all geared to highlight and bring to the fore our core values and requests towards better public transport.

It is for local people to get organised and determine what they wish for and set about fostering it unto fruition. ERTA can be an agency banner to do that work and it helps us and by wider promotion and reification of principles, aim to connect the grassroots with the powers, authorities and agencies of funding to bring to fruition beit route protection measures, reopenings, rebuilds, better bus links between principal bus and rail stations (Bedford is an example) and much more.

On Bedford-Cambridge, whilst we welcome a route, we still believe there was much merit in going east of Bedford via St John's and diverting before or after Willington, approaching maybe via North of Blunham in the Grange area Tempsford from the south and having physical rail linkage, not just a station making people from Stevenage, East Bedfordshire and Peterborough change whilst meaning no passenger or freight trains can come to Bedford off or onto the East Coast Main Line out of Kings Cross. This seems short sighted and Bedford Borough, English Economic Heartlands right up to Government would do well to keep options open and remember strategic contingency planning, passively design in potential and maybe for example St John's Halt to Cardington Road could be made a cycle-cum-walk-way and keep the old platforms for picnicking for example, rather than block off the route with housing later to regret this loss to the Sustrans Cycle route to Sandy for example from the railway interface. 

Elsewhere development pressures abound and we are seeking to protect routes and engage, but unless strategic ratcheting up of route and deviation protections is forth-coming from Government with incentives to local councils, we may see the spectacle of Government with one hand rolling out funds to nurture reopenings, whilst through negligence, allowing very same routes or others to be lost with the other hand, nullifying the whole endeavour!

So interesting times and the work continues. Thank you.




Saturday, 29 February 2020

Call to protect former rail routes more.

Despite the good news on East-West Rail and the Government getting the ball rolling on allocation of reopening bid grants funds, there is a real need for Government to act now to protect former rail routes to keep options for reopening open. Currently the projects we are ERTA are concerned with have such threats like:
a. Olney - development battles continue and a study is needed to look at alternative routes just as they have done on Bedford-Cambridge.
b. Guildford-Cranleigh - a canal utilising the old trackbed is threatening the current trackbed corridor used currently as a footpath/cycleway. 
c. Woodhead and Don Valley Railways are under threat and need public support to protect from development encroachments and keep options for rebuilding as realistic possibilities.
These are examples, others abound. Planning Policy Guidance 13 (PPG13) is a toothless tiger and more stringent inducements for councils to protect routes and deviation spaces - even making them Grade 2 status listing or some configuration thereof is needed. Our Westminster Team will be pressing for more. It has vacancies.

Please do feel free to enquire further on any of the above - a letter is attached and you can write in support of protecting the trackbed there. I attach a letter from the DfT on east-west rail and our updated trackbed protection brochure. Newsletter will be sent out on Monday. This is a busy time for us and we welcome people to offer to join/help/offer to help and one way to support is to book and come to our conference please: https://www.ertarail.com/conference-2020

Any enquiries via Mr Simon Barber: T. 0208 940 4399, E. simon4barber@gmail.com Simon works hard for the association and it can only continue with more reliable helpers and adequate resources. Please consider what you can offer, we wish to overcome obstacles, not be overcome by them! Thank you.



Friday, 21 February 2020

Olney News - help save or keep a rail option open not scuppered!

Please encourage all interested to get writing:
a. MK Council and Olney Town Council stating the benefits of a railway and that a route for rebuilding needs identifying and protecting not scuppering.
b. Traffic through Olney is appalling - needs another crossing and a bypass!
c. call for more studies in support of the railway, including the Bletchley-Bedford-Northampton loop off the WCML to make more capacity for non-time-critical train movements on lines with capacity for example - enables more to service MK Central.

Floods at Olney, they are working in a quagmire currently!

Now Bedford-Cambridge is being progressed, could a direct link be designed passively to arc directly for a new MML-Northampton direct link catering for freight and more cross-country rail services eg. Birmingham-South Midlands-Cambridge-Stansted or Norwich for example? B'ham-Leicester-Peterborough is a great way round currently. Ask East-West Rail Company Ltd to consider passive design with a phase 3 build following on from Bedford-Cambridge?


May I encourage people to pre-book for our conference - a good networking opportunity, ask a salient question of our speakers and help us help fulfill our mission more please. The sponsors have been good to us and we want to have a good turn-out as it bodes well for the future. Please encourage others. We have options on our website conference page: https://www.ertarail.com/conference-2020

Northampton Forum this Saturday - open to all/all welcome: Northampton Forum: Saturday 22 February 2.00-4.00pm Northampton Quaker Meeting House, Wellington Street, Northampton NN1 3AS. See website: https://ertarail.com/events Contact Mr Simon Barber T. 0208 940 4399, E. simon4barber@gmail.com Book stall available.
Below: Olney A509 Warrington Road Area - circa 2015 Now we have a Sainsbury's and other development being expanded both sides of Lavendon Road with little real additional infrastructure beit a A509 town bypass or a rail link or both. Where there's an engineering problem, there is likely an engineering solution! Make your voice heard and join ERTA and help us take the rail idea forward.



Our people are active - can you be too please?
Dear Sir/Madam,

I am writing in regard to the plan for retirement flats and bungalows at the corner of Lavendon Road and Warrington Road,Olney following the developer's appeal against the Council's recent decision.


The reason for writing is that "I am a member of the English Regional Transport Association(ERTA),which is a voluntary membership-based, pro-public transport improvement association which started in  Bedfordshire but its remit has since increased since several of its projects have a nation-wide positive benefit and impact.

It is endeavouring to re-open the Bedford - Northampton railway which once had served Olney,and the old track-bed survives in several places along the route,although some parts have already been built on.The old route therefore needs to be protected and any new deviation needs to be identified, not destroyed since the railway would bring several benefits to the town.In fact the land which the flats and bungalows would be built could compromise the trackbed(or any new deviation required). More studies are needed in support of the railway.

The re-opened railway would connect Olney to the national rail network and demand would increase with the town's rapidly growing population;it would also connect Olney with London.Many commuters to London from Olney and around drive to either Bedford or Milton Keynes Central to catch their trains and the car parks at both those stations are congested,so are the roads into these towns during the week-day peak-hours.A Bletchley-Bedford-Northampton loop service would also bring more capacity to the West Coast Main Line enabling more train services to Milton Keynes Central.The rail link will also increase footfall to Olney High Street.In fact the land earmarked for the flats and bungalows could be a potential site for a station car park.

Furthermore,the traffic through Olney is appalling and a bypass is needed."

Yours faithfully,
Simon Barber
Email address: simon4barber@gmail.com