Tuesday, 14 January 2020

ERTA London Calling!

Not exhaustive, but some ideas which we would hope would be worked up and promoted where appropriate:

London Wish List 2020

Gospel Oak-Barking line (GOB) services integrated more with existing London services and
lines, with better interchanges at stations along the existing route?
-That GOB network should extend eastwards to Barking Riverside and Abbey Wood via a Thames Tunnel.
-That GOB network should extend eastwards to West Hampstead -Dudding Hill – Acton – Kew Bridge -Heathrow
Thames Tunnel Grays – Dartford (Lower Thames River Crossing scheme), built to HS1 standards, to include Crossrail 1 extension and cater for freight between ports and Channel Tunnel.

New rail link Southend Airport – Rayleigh/Pitsea parallel to A13, A130, A1245
Light Rapid Transits should be allowed to grow organically via local planning systems in North/South    /East/West/Central London e.g.  Croydon Tram link - extend to Crystal Palace and Lloyd Park curve eliminated (site of accident Autumn 2016)
LU -  a) Re-open Bank-Aldwych (closed for sake of new lifts!) and old Fleet Line to Charing     Cross
      b) Extend LU lines -  Edgware – Stanmore-Watford
Mill Hill East-Edgware
Epping – M11 Park & Ride
      c)modern signalling systems
                d)cooling the Tube network (especially in summer) where feasible and affordable
e) up-grade on the District Line (with population increase crowding is set to increase on that line from Richmond in next 25 years; that line is also notoriously crowded in peak-hours between Earls Court and Westminster),
      f) new air-conditioned trains which are energy-efficient with regenerative breaking
7.    New station on London Overground North London Line at North Acton (interchange with LT   Central Line and possibly Crossrail 1, adjacent Chiltern and First Great Western Services).
 New station on London Overground West London Line at Battersea
      9.       More disabled access for both LT and National Rail stations, particularly on London    Overground and LU stations.
 Chessington Line extension to Leatherhead including station for Chessington World of Adventures

Crossrail 1 to Windsor & Eton Central
Heathrow Southern Railway (short tunnel from Terminal 5 and then a mainly surface route parallel with the M25 to new junction with the Windsor-Staines line. HSR will then continue alongside the M25 to new junction with the Virginia Water–Weybridge/ Byfleet Junction line north of Chertsey. Could also incorporate old West Drayton - Staines West branch and be linked into reopening old Great Central mail line in the longer term.

New platforms Willesden Junction Low Level for London Midland and Southern services, thereby enabling interchange with North London Line, West London Line and LT Bakerloo Line.

North Downs Line    a) Double-track Frimley Green – Ash Vale
b) Improved pedestrian access between Dorking West/Dorking Deepdene
c. Elecrify North Downs Line.

Extend Docklands Light Railway Bank – site of old Broad Street station(underground)

Restoring through services to Bromley North from London Bridge/Charing Cross etc.
West Hampstead - new platforms for Chiltern Line services and possibly Metropolitan Line, thereby enabling interchange with North London Line, Thameslink and Jubilee Lines
Crossrail 2 [SW-NE]
Better integration of London's suburban rail with TfL bus, tube and tram services, including new and improved interchanges with these services
All London's suburban rail services must be devolved to TfL (London Overground) as soon as possible
Sites close to railway lines offering potential locations for rail freight terminals and logistics centres must be protected from alternative transport proposals these include disused railways and rail sidings.



Monday, 6 January 2020

Alternatives by rail to HS2/HS3

What we want is: a. Woodhead new built with new bore tunnel, b. Peak Rail, c. Harrogate-Ripon-Northallerton, d. Skipton-Colne e. Keswick re-railed and f. Great Central rebuild/new build from Calvert-Narborough with access from the south (Aylesbury, Oxford, Old Oak Common, Heathrow, Southampton and Bristol) to Leicester for East Midlands and beyond dissemination and via Knighton-Burton spare capcity to Derby for wider dissemination and vice versa. 

This capacity creation would go a long way to connect and re-connect and offer capacity at less cost the High Speed designs. I'm open to see the map of what you propose and whether it would accommodate passenger and more freight by rail and not merely create defaultive capacity (HS2 claim). 


A connection from MML north of Luton (Toddington service station area) - M1 calls at MK West/Coachway/Cranfield links- cross country enter Northampton via the old Bedford-Northampton link serving Brackmills Industrial Business Park, University of Northampton Waterside Campus (new), Delapre Abbey Centre, South Northampton and connects with WCML / loop and proposed and at study stage Northampton-Market Harborough line and DIRFT for example. You could focus on Leicester-Nuneaton via Narborough and parallel M1 with diverse links to Rugby, GC for Calvert and if necessary M1 Watford Gap-wherever in the London area you have in mind. 


I would suggest look at incrementalism and working with local lines and infill select new pieces first and then whole hog if necessary? Happy to entertain and discuss in the round further, principally via email richard.erta@gmail.com and my Vice Chairman and associated do the face-2-face meetings more often than not. 


I dislike the adversarial and aggressive approach of HS2 or bust stances, and wish for a more inclusive, broadened and concilliatory tone which carries more with us. For example, our Great Central scheme would propose a station at Brackley and between Southam and Daventry, none of which HS offers whilst all the design and intrusion of a railway they cannot use. #ertarail




Friday, 3 January 2020

Getting more freight off roads and onto rails in the East Midlands

For 20 years we called for a rail-road depot for Elstow Storage Depot off the MML south of Bedford/off the A6. Alas, we were ignored by tiers of government and now we have Wixams with proliferated depots and loads of lorry movements and no rail access, so dysfunction is locked-in. Likewise Brackmills Industrial Park, Northampton - which could be rebuilt if those regional distributor companies clubbed together and led from the front. Sadly they are waiting for others to blink first/brinkmanship (?) and in track laying roles there is NR and not much else unless third party funding is available. Where rails exist companies can spruce up green credentials by having a rail access, but reaching out to take rail movements off through tracks demands some vision, cost and initiative. Thus, Northampton Rail freight depot is a link off the through tracks and could be a problem operationally as these tracks through Northampton are extremely busy with passenger and freight.

Hinkley has rail access from Felixstowe-Leicester and Liverpool-Nuneaton. BUT, no north-south access which avoids London to places like Bristol and Southampton for example. Oxford-Milton Keynes reopening (2024?) still has the issue of capacity on the West Coast Line whilst A34/A43/A14 and associated roads are bunged up/subject to delays and that is cost. This is where our Great Central Plan comes into its own, as if a spur were built off Narborough (Leicester-Nuneaton) and new build back to Rugby / WCML that in itself would offer M1 parallel on north-south axis but WCML is at capacity (selling point seized on by HS2 as an answer even as it won't cater for much freight if at all/relies on predicted defaultive capacity creation, which in my humble view is over-egged!). Great Central south of Rugby to Calvert enables passenger links from East Midlands to Aylesbury/Oxford, Old Oak Common/Crossrail/Heathrow and freight off existing lines and road to East Midlands from Southampton/Bristol to Leicester and yonder and/or via the Burton Line to Derby and yonder (avoiding excess paths being taken up through Leicester). 

So I feel GC needs to be studied again, councils need to come together, pool resources with quangos like English Economic Heartlands and see how vital a role a GC revival south of Narborough could be for game changing the current set of dynamics we face. Orbitals of Birmingham are few and far between, but with Peak Rail (interest exists) access to Manchester/capacity for passenger and freight can be had and dissemination thereof.

Hope of interest. Any industrial development linked to rail with actual rail a lion's share is better than none at all, but Government could be asked to mandate it and set a percentage of rail business modal shift from day one, so we avoid speculative greening and proliferation of lorries. Midlands Connect sadly promote roads it seems, but that is short sighted, if they could buy into these rail projects, it could be a game changer.




Thursday, 2 January 2020

English Regional Transport Association (ERTA) 2020 Vision


02-01-2020
Press Release

English Regional Transport Association (ERTA) 2020 Vision

We want to see the Government commit to a rolling programme of rail rebuilds and reopenings across the English Regions. So much has been poured into HS2 and HS3 when so much elsewhere cries out for working up, starting up and delivery cost funding to be made available. We need a level playing field within rail and between rail and road expenditure and ease of accessing capital funding for projects for example.

In the south we have things like electrification of lines like Ashford-Hastings, North Downs Line and Bedford-Bletchley as infills. Ashford-Hastings would enable through services via Ashford onto Brighton and with a new Polegate-Stone Cross, more frequency and faster could offer competition to road building demand and costs. Likewise, the North Downs Line could enable Thameslink to run semi-fast into Guildford and possibly Reading from Redhill and Bedford – Bletchley could enable more through workings between the West Coast Main Line and the Midland Main Line making more of its strategic significance.

In the north we want Harrogate-Ripon-Northallerton, Woodhead, Peak Rail and select others to get a higher priority for investment and rebuilding. Harrogate-Ripon-Northallerton, as well as taking on the A61 and enabling growing populations along the corridors better commuting by rail access, would also help to declutter York and shave 40 minutes off through transit times between South Yorkshire/Midland Main Line and Newcastle and Scotland via the East Coast Main Line. Woodhead would cater for passenger and freight between Hull and Liverpool and all in between. Peak Rail would link North West with East Midlands, populations, commuting, airports as well as principal main lines and offer environmentally friendly rail access to the south Peak area.

As a voluntary association, we rely on public and professional interest and generosity and welcome to grow our membership to enable us to campaign more to foster these and other schemes towards ultimate delivery. Our forums, conferences, leafleting and growing email network offer opportunities to engage.

End Press Release

Further comment, please contact Mr Richard Pill 01234 330090 / richard.erta@gmail.com

Monday, 30 December 2019

ERTA Calls for the re-railing and rebuilding of the Northampton Brackmills Branch!

ERTA Calls for the re-railing and rebuilding of the Northampton Brackmills Branch!
The English Regional Transport Association believes there is a strong case for re-railing the Brackmills Branch as a piece of railway infrastructure. Benefits of so doing could include:
Ø    An out of town park and ride could be established to give more parking capacity off the A45/A428 into the town centre and main railway station of Northampton
Ø    A drive for getting the big players located at Brackmills Industrial Estate to club together and explore sending more freight by rail. Being off main lines, it keeps existing tracks open for more trains.
Ø    If the Northampton-Market Harborough line reopens with a local service to Leicester, trains could wait over on the capacity and land the Brackmills Branch enables.
Ø    Special Trains, Heritage Operations, running around trains, the branch could help existing lines operational efficiency.
Ø    ERTA believes these and other gains including the medium term rebuild/new build back to Bedford for links with Luton, Luton/Gatwick Airports, St Pancras Eurostar, Thameslink and east-west rail to Cambridge and vice versa to Northampton for vital traffic free footfall and spend commands that local councils take an interest, form a consortium, draw down funding for commissioning studies and keeps the option of re-railing alive. Business cases have to be made and cost money, Councils, Business and other leaders are best placed to secure what is required and make the case as robust as necessary.
Please write to your local MP c/o House of Commons, Westminster, London, SW1A 0AA and
1. Northamptonshire County Council, Northamptonshire County Council, One Angel Square,
Angel Street, Northampton, NN1 1ED
2. Northampton Borough Council, The Guildhall, St Giles' Square, Northampton NN1 1DE
3. South Northants District Council, The Forum, Moat Lane, Towcester NN12 6AD.
Please let us have copies of any useful replies or forward emails to richard.erta@gmail.com




ERTA Northampton Forum – Saturday 22 February, 2.00-4.00pm,
Northampton Quaker Meeting House, Wellington Street, Northampton NN1
If interested contact Mr Simon Barber T. 0208 940 4399, E. simon4barber@gmail.com

1. Chairman’s Welcome
2. Apologies for Absence
3. Appointment of a Minute Taker
4. Previous Minutes and Matters Arising
5. Brackmills Branch Issues, Discussion and Solutions
6. Bedford-Northampton – getting councils, organisations and others involved/East-West Rail adoption.
7. Northampton-Market Harborough/Progress/Support
8. Northampton Depot News/Parry People Mover and re-railing goals/how to advance them
9. How to get more locals on board to turn out and join
10. Appointment of any officers beit area reps, project helpers, trackbed watchers, fund raisers
11. Any Other Business
12. Date, Time and Place of Next Meeting (Autumn 2020)





Monday, 23 December 2019

Southern Choices - who, what, where and when?!

Probably for the New Year now, but this has come to my attention and seems to dance around real issues and us.
1. Guildford-Horsham et al should be in the frame, little chance of more capacity without more rails both sides/flanks of the Brighton Main Line (symmetry).
2. Electrification of the North Downs Line even to Guildford would enable an hourly Thameslink to Guildford for connections beyond. Getting to Waterloo from Kings Cross is crowded and protracted. Reading at a push, Thameslinks have dual voltage capability and Reading links are considerable. It means less changes and more options on spare capacity lines?
3. Could a Thameslink also turn off once an hour at Redhill for linking with Tonbridge for Hastings and Ashford etc?
4. Polegate avoiding curve for more not less diverse train services inclusive of Eastbourne, not one versus the other.
5. Is Dorking physical curve link now not viable?
6. If our line came off, you could have Redhill-Cranleigh-Horsham-Gatwick-Redhill loop.
7. Canterbury curves, can they still be done?