Wednesday, 21 September 2016

The case against the St James’ Link Road in local terms












Pictures taken from Towcester Road Bridge, left (above)1998, right 2012.


The case against the St James’ Link Road in local terms:

1. The road links two congestion hot spots, namely the St James’/Sixfields area and London Road, Far Cotton.
2. The road link doesn’t take traffic out over all. Rather it gives more space to fill up with yet more traffic and loads of new developments go in, majoritively will drive and want to access urban roads.
3. This road goes through an increasingly residential area. New houses, (see above picture on the right) of modern construction will surely not welcome more standing traffic emitting fumes and noise to their neighbourhood?
4. Victoria Parade to the north and the A45 bypass on top of Hunsbury Hill to the south are both congested and the link road is London Road, where this new road link would pour yet more traffic into the system. It is no cure or congestion buster, rather space for more of the same making the end result worse.
5. If the industrial estate is life expired, surely the twin needs of more housing and parking should be first in the queue for a change of use?
6. The idea of a new road bringing sufficient new investment to heighten viability to industrial units seems incredulous. Rather, is there sufficient spend capacity in the system seeking the services on offer?
7. The industrial estate seems run down with quite a few empty or dilapidated spaces. Sometimes we have to accept the life cycle has run its course and it is time to move on.


By contrast the railway, if restored to regular passenger and other services, offers to remove on a local and regional basis traffic from roads through more choice. That will save time and money as well as inform more footfall and spend to the town centre of Northampton, which could make or break shops being sustainable or going to the wall. We at ERTA support the railway and welcome you to do so as well. Please see our website for more information on how to join and get involved: https://ertarail.com/

Thursday, 15 September 2016

Watford Station Redevelopment Plans and Consultations

Watford Station Redevelopment Plans and Consultations

Given the plethora and overlap of consultations and considerations, I am writing on behalf of this association to give our general views and further information may be found on our website: https://ertarail.com/watford-and-hertfordshire-rail-public-transport/.

Our main wish and desire is for a new direct North-East curve be installed off the slow lines of the West Coast Main Line to link and allow direct running into and out of the Abbey Line from the North.

This would require a new single or double track off the slow lines north of A412 St Albans Road a new underpass to allow the lines to curve round and link with the Abbey Line.

Our vision for the Abbey Line is for a double track twin platform station at Abbey with a new booking hall and coffee shop and public conveniences and for doubling track loop at Bricket Wood and a new link line east of that station to a new station on the Midland Main Line (MML) south of St Albans City Station/North of M25 whereby the Abbey lines would go under the MML and link to the slow London bound lines.

This would enable the following:
a. Trains from Bedford-Bletchley to run into Watford and on to the Abbey Station off the West Coast Main Line
b. Specials to visit the area off the main lines
c. waitover for stock
d. Thameslink to Watford Junction from North London MML Stations like Hendon and Radlett
e. More use, patronage and diversity turning the Abbey Branch into a through route dynamic again.

Rarely used platforms adjacent to current Abbey Branch platform at Watford Junction could also be linked to the north via these new lines, making more platform flexibility for more services.

A footbridge linking the Retail Park with platforms and a new booking hall above ground level with lift/escalator access to ground level could give more capacity to the crowded tunnel and stair arrangement from platforms.

Could the office tower at the station be relocated to spare office locations and knocked down for more railway access? Given we have on the west side of Watford Junction the Croxley Link as well as metro lines to Euston more baying capacity is required. If the tower was gone the footbridge could extend across and the current bay line knocked through to the north side of the tower making a 12 coach through platform for interface with fast trains going north. The current bus interchange could be made a multi-storey car park and accommodate an extra bay for extra trains.

We need to encourage people to walk, cycle and use public transport to and from Watford Junction and safer off road cycle and walking facilities with the main High street and radial parks, estates and linking conurbations should also be progressively networked, mapped and promoted. Cycling on busy main roads is draconian for many cyclists and cycling on pedestrian space is also a problem. A off road cycle space, akin to Utrecht in Holland is the incremental way forward so optimising these non car methods more to greater numbers. They will require more lock up space accommodation and the link to the retail park will be useful capacity for this as well as at the front of the station.

We would encourage a study to consider incremental phased extension of the underground from Stanmore and possibly Edgware to Watford and that the Watford Metropolitan Station is not lost to railway use but retained for more services including use of the Amersham north to east curve for a Watford-Aylesbury service without a need to change. This could be a Chiltern Railway diesel service and link to the East-West Rail Network.

A possible heritage centre and some preservation/museum could also be developed around the site adding another attraction and boosting footfall and spend across the vicinity.

The north to east curve at Watford would have a triangle platform with the said footbridge (see diagram) so trains from the north bound for either the Abbey or Thameslink could call at Watford and again save changing trains. From tourism to sport, commuting to further afield travel, this would give more options for local and regional rail.

For more information please see: 






Monday, 15 August 2016

Impact of development great and small

The proposed 20, 000 houses east of the M1 near Junction 14 stretching out to link Crawley with Cranfield and Moulsoe must surely be a concern as to the weight and impact of the traffic? The Government I feel is either powerless or deliberately posturing as such to inform a laissez-fare attitude to development. The M1 junction is often congested at peak times and unless it is made 3 lanes over the M1, surely these congestion 'hot spots' will get worse, not better as these houses are built and as commuting is the main stay employment window, access to the M1 is one artery, driving across MK urban area is another but if the Central MK Station is the goal, then demand for parking will exceed supply of land and so costs may be imposed or urban on-street parking causing conflict with estate residents. 

Likewise at Olney we face a development which may seem benign enough but which we believe will inform more greenfield to brown field and act as a wedge to more development. What a Northampton-Olney-Bedford rail reopening offers is a station on the A509 at Olney to cream off commuters to London nearer source, better enabling Milton Keynes to cope. We face an Informal Meeting which is tantamount to an inquiry in all but name and form. I've never done one solo before and am, if honest nervous. They say we can speak at it, but don't set a time limit, the Council Planning Committee was 3 minutes and that enables better planning. Shall I do the same or speak for an hour? How long is a piece of string.

The National Infrastructure Commission is including examination of Northampton-Bedford in it's review and I have a meeting with Northants County Council to debate the relative merits and hopefully assure them that Northampton would gain from direct links between it and Luton/Airport, Bedford and with East-West Rail, ultimately Cambridge and vice versa. Their new University Waterside Campus backs onto the old railway route into Northampton. We do not want it to be made into a road access, we want a station there to enable students to find it easily straight from the airport or principal main line stations and terminus' namely London, Birmingham and all in between including Northampton, Olney and Bedford.

Villages will take a lot of the cross-traffic as development models are being unleished across the English Regions without the essential local rail infrastructure being restored as part and parcel of the deal. Therefore the whole lot goes on the roads, the roads are congested and whereas Ely, A14 and Norwich have new roads and widening; this creates more brownfield for development, and erodes the countryside, ability to grow food and imports rise.

So I welcome any support and collaboration. Local Government has been whittled down and needs to be revitalised, more people means we need more MP's and Councillors to represent them, not less. Taxes must rise but should be proportionate to incomes. There is no more that can be cut and whether direct or indirect, costs and adequate funding of public services is essential for well being than misery.

Cutting from Milton Keynes Citizen, 04-08-2016. 20, 000+ houses and no new rail infrastructure. That is dire planning!


Battle for the rail link and soul of Olney!

Battle for the rail link and soul of Olney!

https://publicaccess2.milton-keynes.gov.uk/online-applications/applicationDetails.do?activeTab=externalDocuments&keyVal=NUID79KWLAU00

The Planning Application south side of Lavendon Road, Olney for development has gone to appeal. This is due to take place on 23rd August 2016 at Milton Keynes Council Civic Offices. I've never done a quasi public inquiry solo before. All I can say is what I've said before, namely that the land should be retained and is required for a station, a railway and commuter all day parking and until such times as that is the case, the land should be a pastoral green belt and retained in the farming tradition as such. Otherwise I consider this development will reignite more and that will put pay to the prospect of a railway ever serving Olney in our lifetimes. https://publicaccess2.milton-keynes.gov.uk/…/applicationDet… And Planning Inspectorate Website ref: APP/Y0435/W/16/3147906 for further information. This and the threat of a link road taking the trackbed at Northampton could mean in a few months from now, we either redouble efforts for reopening the line or take a step back and leave it in yes, God's hands prayerfully and literally! End of the day more awakened support and interest from Olney people and town council could make or break these things, likewise Northamptonians respectively. It has to be a push from Northampton to Bedford to happen as Bedford, well connected to London looks south politically and sub-terraneously culture-wise.
People who wish to get involved, here's the Gateway:https://englishregionaltransportassociation.wordpress.com/


Scenes around the trackbed near Olney: Help us save the old trackbed now + adequate spaces for realignment where current blockages exist and for station, bus interchange and all day commuter parking in the vent of a local rail reopening: Birmingham - Cambridge 'South Midlands Link' via Northampton and Bedford and Thameslink extension Luton Airport-Northampton 'Plane to Brain'!










Wednesday, 10 August 2016

East Midlands-Midland Main Line-South Coast - what should be done?


Stations North of Bedford and associated links

The English Regional Transport Association (ERTA)’s predecessor organisation the Bedfordshire Railway and Transport Association (BRTA) led the way following the demise of the idea of a station immediately north of Bedford at various sites in the mid to late 1980’s at Cut Throat Lane, Bedford, Oakley and Milton Glebe. These floundered for a variety of reasons.

BRTA organised meetings and did surveys and reported these at the time to councillors, media outlets and via the old websites. Our take was and remains that stations north of Bedford are needed as part of and included with a new local station stopping service in addition to principal limited stopper fast services. So electrification of the Midland Main Line North of Bedford holds the prospect out for improve fast services and also the reintroduction after 60 odd years of a local stopping service especially between Bedford and Leicester, Corby, Peterborough and Melton Mowbray and back via Syston to Leicester for example. Another arm could be the reopening of the freight only Knighton-Burton line with new stations at Ashby de la Zouch and Coalville, enabling Bedford-Burton – Derby by an alternative route.

Stations we would like to see is as follows:
1. Oakley (on land between Highfield and Lowfield land if development does not beat us to it).
Cut Throat Lane is considered too near to existing Bedford Midland and now the bypass slices through the land formerly allocated and is ill-judged in our view. Far better to have Oakley served off the A6 bypass slip roads, so no traffic through the villages. Of course, any traffic which goes though Bromham and Oakley to get to it, should be directed to use the new bypass which is what it is there for.
By spacing stations out you establish an even pattern, create more loading and parking capacity. However, London bound commuting is overcrowded and limited track and terminal spaces in central London means we need to turn the map upside down and pin point alternative routes and destinations to the London area such as:
a. Reopen the Dudding Hill Line (links with Acton, Heathrow, Windsor and Eton, Southern Region and Reading/Thames Valley).
b. Electrify Bedford-Bletchley and integrate services with Southern for Bedford-Watford (accesses the tube via the new Croxley Link)
c. Utilise the Carlton Road tunnels to run directly onto the Gospel Oak Line for North and East London and Thames Gateway.
d. Rebuild a new conventional rail link from Guildford-Cranleigh-Horsham-Three Bridges and via Shoreham-Brighton for alternative end to end Bedford/Midland Main Line- South Coast.
This may sound farfetched, but the current system is creaking at the seams and something must give to accommodate more people travelling by train and by giving choices and competitive price gains to bypass London by rail frees up seats for those who must go to Central London.
2. Other Stations North of Bedford which should be studied looked at and lands protected for access roads, parking and growth should be:
a. Sharnbrook: Better road link off the A6 needed and bus integration via Templers Way.
b. Wymington: Should have a station with southern expansion of Rushden part of its catchment as Woollaston.
c. Irchester for Rushden could be dubbed ‘Irchester and Rushden Parkway’. A separate rail linking Rushden with Irchester Station could be looked at and maybe the preservation outfit could link up there akin to Cholsey and Wallingford Lines.
d. Burton Latimer and Finedon combined station north of Wellingborough. Ideally a new link north of Wymington loop would traverse the Nene Valley and cut the curves at Wellingborough for more capacity and faster movements. With diversity you can have plenty of trains to serve plenty of principal places and also bypasses to serve outlying areas which are development sites now. New station would serve both communities and draw off the A6 with links to Irthingborough for example.
e. Desborough. A new site is required and this needs to be looked at carefully. It was suggested a new curve linking Midland Main Line North with the Corby line would enable a Leicester commuter orbital loop line with Melton Mowbray being the northern arcing to it.
f. Kibworth – a growth area needing a station between Market Harborough and Wigston Junction.
g. South Wigston Midland Main Line to compliment the local halt on the Leicester-Nuneaton Line.
3. Infrastructure: A Kettering-Birmingham commuter service could run direct via the Leicester south curve to give alternative commutes to just London, Bedford, Luton and Leicester. A new ‘Manton Curve’ could be looked at for Kettering-Corby-Peterborough, although a great way round, would enable utilisation of common train stock on a loop from London St Pancras International Thameslink subsurface station-Peterborough and loop back via Bedford.
Tracks between St Pancras and Brackfriars are designed for 4 12 coach trains per hour x 24 hours per day x 7 days per week. Clearly operations nor lifestyles are not there yet! Everything is in a context of growth and more options for people is a healthy thing, than just chucking £billions at London and leaving cross-country routes and choices neglected or nonexistent by rail, which locks-in congestion to trunk road systems and urban areas putting pressure and stress of cost management systems to stem urban parking and land use balances.



Conclusion: This list is not exhaustive but shows that the strain and conflict could be eased with these measures seen in the round. They compliment, not detract other schemes we are promoting like the Cobbler Line/South Midlands Link and East-West Rail for example. Ideas such as reopening part of the old Bedford-Hitchin line with a western flank bypassing Shefford and running directly to loop the Luton Airport, lines off to the Hitchin Flyover and linking the Midland Main Line at the Toddington/M1 area and south of Luton Hills onwards for Harpenden should be seen as separate schemes, studied separately and a contribution from the Airlines and Airport for studying and making the case should be expected. In all this, capacity for freight and de-cluttering our roads, is a prime task the railways need to be given and Franchises, if not abolished, incentivised to be lead players in nurturing these projects, not just day to day operations and pattern maintenance, when clearly it is creaking at the seams and sweating as a system of basic operation. Something has to give and ERTA takes the view that expansion and more railways is the answer, not more of the same dressed up ever more cogently dubbed ‘modernisation’, which has de-manned stations, eroded passenger service, attention and care to a security and bureaucratic system which delivers mixed messages, inconsistent services and fares!

What you can do: If you agree with any or all of what we are expressing here you can:
a. Join ERTA – every member helps make us a louder shout for more of what we may wish for.
b. Offer time and talent – if you want to get involved we have volunteer opportunities and whilst we welcome reliability and enthusiasm, we welcome any special focus’ or skills.
c. Area Reps convene meetings, gather people together, inform teams and help move projects along. It could be a new station, it could be a new piece of railway. It can start with you, as all progress and advocacy of improvement must.
d. Join our email loop, it is free, no obligation and makes for news and audience support network build: richard.erta@gmail.com

Sunday, 3 July 2016

NIC East-West Rail Consultation

I do invite people to write in to this consultation in support of a Northampton-Bedford as well as Oxford-Bedford-Cambridge rail link being rebuilt and restored. Northampton is mentioned 2.3 and 3.2 and any further enquiries should be sent to erta.rails6@yahoo.co.uk

Saturday, 2 July 2016

More freight by rail... what is the true cost?

I think the environmental and pollution case demands we put ideology before straight statistics in this case and subsidise a renaissance until it can stand on it's own two feet again on the back of a rolling programme of reopenings. Toll Motorways if it requires it. Small load freight from lines like the Cambrian could be where the renaissance restarts. How we bring it about of course depends on Churches, Universities and Public and that is remote sadly I feel whilst petrol is so cheap. So an escalator commuted to good causes like more freight by rail would be good, but can we trust politicians to do just that akin to Brexit and money back for NHS?! At what cost elsewhere?

http://www.railmagazine.com/news/network/2016/06/07/rail-freight-volumes-at-their-lowest-since-mid-1980s and https://www.facebook.com/Save-Forders-Sidings-620452731425801/