Urgent Government Action is required now to help keep options open and better steward potential national assets from ruination and destruction on a grand scale.

Introduction – what matters now
Across the English Regions old railway trackbeds and routes are being subject to no protection whatsoever in a context of laissez-fare planning and development pressures. The result is that an upsurge in bombardments peppering these old railway courses is now visited upon us. Once lost, unless lands are set aside for realigning railway routes in the event of reopening, they are lost and the upheavals of compulsory purchase apart from being expensive are met with objections and much consternation, understandably. What we wish for is the Government to see that at least some of these old railway routes are not just passive phenomenon or mundane happenings, but a potential loss to recovery and realisation of key corridors and assets for the national well-being. We want the Government to act now to strengthen the hand of those wanting to protect former rail routes and realignment spaces where blockages have occurred and indeed to make it a mandatory policy of planning consideration and practise.

Background – the historical context informs todays ‘reality’
The closures of the late 1950’s (pre-Beeching), 1960’s (Beeching and Castle eras) and early 1980’s (Serpell) was of a dubious nature. Superimposed with very little pre-notice, weakened organisational ability to resource and galvanise against, they were the dismantling of what was once the most intense and integrated public transport system and assets in the world. Indeed, we gave railways to the world as one of our legacies. The closures coincided with a deliberate post-war government policy of preferring roads, the M1 in 1959 coinciding with the closure trickle leading to a wholesale flood. Half a century of neglect for those formations, encroachment development means many are compromised or lost. The cycle of road reliance and dependency for passenger and freight transport is that mass demand has informed side effects like congestion, delays, waste of fuel, air pollution, land use conflicts and demand for parking outstripping urban or beauty spot ability to service. Contrast today, what railways remain are bursting at the seams for want of more capacity, alternative route options and re-connecting outlying places and regions.

Get the English Regions Back on Track!
Scotland has blazed a trail in rail reopenings and rebuilds and all reopenings and rebuilds have shown unprecedented growth and usage beyond predictions making the case for them. The Borders Railway is a case in point:
Ø    Brand-new infrastructure
Ø    Some old trackbed recovery but also new build where necessary
Ø    4 million users in first few years of operation
Ø    Serves rural heartlands and outlying urban centres
Ø    Has brought footfall and spend minus cars to these areas revitalising their economies
Ø    Has informed new job and commuting opportunities
Ø    Has led for calls for more re-railing including rebuilding back to Carlisle

The English Regions, with even more dense populations, more congested roads and higher air pollution levels are lagging behind. There is probably about 100 reopenings/rebuilds which could wash their face like the Borders Railway example but the stringency of Government demands, the costs associated with commissioning studies and working up schemes has to be able to access capital funds to draw down and if that means taking from capital funding for road schemes as an investment in modal shift nurture for the sake of the environmental as well as any socio-economic benefits, so beit. In short, we wish for:
Ø    Capital funds for incentivising local councils to protect railway routes and corridors. This does not have to be passive but can interim double up as linear parks, green spaces, conservation areas and footpaths/cycleways as long as the conversion to a railway is understood by everyone and alternative options for relocation of other uses can be designed in to and integral to a railway.
Ø    For Government to commit to giving the go ahead to one reopening/rebuild per region per year from now. For example, Skipton-Colne, Bristol-Portishead, and the Fawley Branch have all been lauded but not given the go-ahead. Other rebuild schemes like Bedford-Sandy-Cambridge need working up, route protection, deviation spaces and speeded up delivery wise. Once the movement and rewards of reopening/rebuilds come on-stream rather than gathering dust on shelves in the form of umpteen reports, so other schemes can work their way up the chain.
Ø    For more incentives for Local Councils and other agencies to intervene and protect routes and realignment spaces for and to entertain reopening/rebuild schemes in their areas and collaborate together to move the agendas from abandonment, encroachment and dismissal to embrace, nurture and responsible stewardship. A lot can change in 50 years, demand which may have not existed then, may exist now. At very least they should be required to make assessment of new flows and demand.
Ø    For incentives for start-up costs to be partly met by grants. Getting more freight by rail can require outlay costs of sidings, fork lift/gantry equipment, reciprocals, sites and wagons/locomotives for example as well as possibly new signalling and other infrastructure. If we are to reduce the costs of road wear and tear, cut carnage and reduce the tonnages on our roads, getting more freight by rail sounds good and is easy to say and quote in a report, but needs seed corn funding to be apparent to enable small schemes upwards to be pioneered and grown to longer/bigger operations. Examples are recycling great and small, pallet-sized consignments to containers, wagon loads to mixed freight. If it is only economical to send all goods by rail if over 100 mile distances for example, then the law should say all freight over 100 miles must go by rail surely, alas this incentive is lacking on the scale required for majoritively modal shift and main carrier status to be awarded back to the railways as the staple future means-ways to send goods.

Case examples (not exhaustive):

1. Bedford-Sandy-Cambridge: Part of the East-West Rail scheme, been discussed in various arenas for over 35 years. Meanwhile nothing has been done to protect the former trackbed and acutely access to the urban interface at the Cambridge and Sandy locations as well as Bedford. Default is not enough. Brand-new routes, because of increasing development going in, also face problems and spiralling costs. ERTA wants the traditional route with modest deviations where blockages exist. This cannot happen if the original route as an option is missing from consultations and is not protected now to keep that window alive. In short, bypassing Bedford, linking at Shepreth onto existing lines rather than Trumpington should not be allowed. It should also be insisted that physical tracks link the radial north-south main lines to the east-west rail so for example Peterborough-St Neots-Bedford, Thameslink from Stevenage-East Bedfordshire-Bedford as well as Bedford-Sandy-Cambridge can be entertained.

2. Great Central South of Narborough and Rugby: This route needs recovery and protection as is under threat now. Largely fallow until the last 10 years it is now bombarded with piecemeal development without any incentive to consider what re-railing the corridor could do. HS2 will not provide intermediate stations between Old Oak Common and Solihull, so all in between growth-wise will be flung to existing roads and rails. Meanwhile the M1 often draws to a standstill, likewise the M40 is busier than ever. Saving land and offering real rail choice going where these flows also go is what recovery of the railway could offer.

3. March-Spalding: Closed 1982 this trackbed was dormant apart from Whitemoor Prison for a long while but now development pressures abound and the consensus around building homes is high on the Council’s mind. However, more development without infrastructure, means all on to the local roads. £millions are going into more bypasses and yet they say there is no potential demand or justification for a parallel railway. Better protection mandates and a rolling programme of reopenings/rebuilds as part of the mix of what Government facilitates for the railways could help strengthen the call for protection and study to assess whether in fact the railway could deliver benefits and dividends and be well used. Suffice to say the costs of the new Werrington Flyover and routeing upsurges in freight by rail the long way around from March-Peterborough-Spalding shows that efficiency gains by a direct railway could free up cost and bottlenecking elsewhere.

4. Guildford-Cranleigh-Horsham-Shoreham: Over the years whilst a main part of the route has been protected as a walkway-cum-cycleway, development blocks the route in Cranleigh for example. A deviation or compulsory purchase and relocation of the development is required if the railway is to be rebuilt. Likewise, the footpath and cycleway may either need to be slewed to share the corridor with a fence separating the two or relocated alongside off the trackbed to enable the railway to get through, ideally with double track or long passing loops such as a Cranleigh Station could inform. Demand and benefit of reopening is in scope from Reading/Heathrow-Guildford-Horsham, Gatwick from the south, Shoreham for Brighton and relief to the Brighton Main Line, A24 and sustained town centre footfall and spend minus the cars keeping town centres vibrant. It would also open up new employment and commuting opportunities to a wider area.

5. Harrogate-Ripon-Northallerton: Development has scotched early hopes of progressing reopening and now we need Government to demand that alternative access is identified, laid aside and provide seed corn funds for studies to work up the case and demand with a real prospect of sanction for rebuilding the entire line in due course. Benefits connecting the regions and 2 main lines as well as benefits to the ancient location of Ripon should not be under-estimated and new development if tailored correctly could inform new demand, especially with commuting for example.
The way ahead:

A rolling programme of line reopenings and rebuilds is crying out across the English Regions. A level playing field would inform more schemes can be worked up and investigated. Better and stronger Government mandatory rules, guidance and laws are needed to stem the rot of routes being lost beyond reasonable recovery to keep options open, make development more integrative and sustainable.

Unless Government acts and starts a rolling programme of delivery even a trickle of one per region now, we are saying goodbye to sustainable transport options and the conveyance of people and goods more by  rail, which evidence shows is being used more today than ever before – this on 1/3-1/2 the network which existed in 1955 for example.

We call on elected representatives and others to add their voice to our calls and champion them to the highest levels of Government as an investment in ourselves. Likewise, if members of the public agree with our calls, why not join ERTA and help us do even better?

For an index of the top reopenings we have identified please request our Rail Reopenings Pamphlet which lists 32, again not exhaustive but indicatory that if a fraction were being incentivised to be protected, worked up and delivered by Government sanctioning a rolling programme akin to calls for more electrification for example, then in our view, that would be a very prudent act and investment in our nation’s well-being.

Disclaimer: The English Regional Transport Association is a voluntary organisation and as such relies on the generosity of professionals and public for entertaining and supporting our work and calls. Please help us and be part of the answer to the question of why reopenings/rebuilds are not happening and help get the English Regions moving in a healthier way.

"_______________________________________
Tear Off and Send with Your Subscription or Renewal or go to on-line:
 https://www.ertarail.com/become-a-member-or-donate
Tick if a New Member: o_____ Tick if renewing as an existing member: o_____
Membership of ERTA costs £12 per annum. I/We wish to join o_______
Name (Please Print): __________________________
Address: ___________________________________________ Postcode: _______________
Tel/Mobile: __________________ Email ________________________________
I/We hereby give consent to our data being used and stored for the purposes of communication with ERTA and its purposes compliant with General Data Protection Regulation (GDPR) o______

Signed: ________________________ Dated: ____________________
Please send completed form and payment to ERTA Membership:
ERTA, 24c St Michael’s Road, Bedford, MK40 2LT (01234 330090)
Join our free email loop: E. richard.erta@gmail.com
Website: https://www.ertarail.com

Monday, 21 October 2019

Reopen March-Spalding


MINUTES OF THE ERTA FORUM HELD ON SATURDAY 19th October 2019
1.Present – Simon Barber (SB); David Ferguson (DF); Mike Cockerill (MC); Gavin Chase
2.Apologies: Richard Pill; Sir John Hayes (MP for Spalding); George Scott (Spalding Transport Forum); Cllr. Nicholas Worth (South Holland District Council); Cllr. Christopher Brewis (Lincolnshire County Council)
3.Notes of Previous Meeting (4 May 2019) and Matters Arising:
Park-and-Ride Station should be built at Cowbit which is a growing village which used to have a station on the old March-Spalding railway
4/5.March-Spalding strategic missing link/Spalding’s strategic position and why re-railing is needed:
More thought and time is needed on project
6. Deeping St. Nicholas (between Peterborough and Spalding)– Freight depot plan scrapped. Village too small to justify station at present.
7. Werrington Flyover (East Coast Main Line) – Work now in progress.  Also housing development in same village, which would justify station on current Peterborough – Spalding line.
8. Plan for tackling politicians, MPs and media – Spalding Today, one of the area's local papers, had an article in regard to our campaign in January. Today’s event was also listed in the recent issue of that same paper, plus also another local paper, Spalding Voice.
9. Regenerating Town Centres – No conclusion reached
10. Electrification of Joint Line (Spalding – Doncaster) - Low priority for Government
11. AOB - Re-open Donington Station (between Spalding and Sleaford)
                  New spur linking Spalding–Sleaford and Sleaford-Boston lines
                  Liaise with campaigners for re-opening March-Wisbech and Kings Lynn-Hunstanton

12.Next meeting - Saturday, 9 May at the Ivy Wall, Spalding from 2 – 5pm (3-5pm business)
Enquiries: Mr Simon Barber T. 0208 940 4399, E. simon4barber@gmail.com





Tuesday, 15 October 2019

Sunday, 13 October 2019

Northampton Forum Minutes 08-10-19


Minutes of Northampton Forum Tuesday 8th October 2019 at the Quakers Meeting Room, Wellington street, Northampton NN1 3AS

Present: Simon Barber, Mike Cockerill, Richard Pill, James Sorrie, 
Norman Bonham and Tony Bush.

1. Chairman’s Welcome – by Simon Barber.
2. Apologies: David Ferguson, Colin Crawford, Pat Mayall and Tim Page.
3. Minutes of the last meeting. These were read out. David and Tony have no report on their under takings which remain to be followed up.  We still need to get more active people in the Northampton area.
4. Northampton’s Strategic Position and why it needs comprehensive re-railing:
Access to Luton/Airport, Thameslink, Eurostar St Pancras and East-West East and vice versa those audiences to Northampton is why a new Northampton-Brackmills-Bedford rail link is required. Passenger and freight access by rail more.
5. Northampton-Market Harborough: Consultation on reopening has been out to feedback. Blockages to be overcome though and accommodating the existing preserved operation at Brampton. @disusedrailwaysandstationsinNorthamptonshire is a site one of the attendees cited as worth a perusal.
6. Northampton-Bedford: WSP Consultants recommended reopening to MK Council in a mobility study. However intrusive development is making the chances of a reopening and station accommodation prohibitive at Olney except a bypass. file:///C:/Users/User/Downloads/MK%20TIDP%20Final%20(June%202019)%20CONSULTATION.pdf summarises it.
7. Daventry rail link: Members of the public have raised it. Population 84, 484 and growing without any rail link or station nearby. It is between WCML and GC corridor, so something could be done if supported in principle to serve this growing population. Source: https://en.wikipedia.org/wiki/Daventry_District
8. Role for Light Rail from a somewhere to a somewhere via a somewhere:  This was discussed but conventional rails seemed more of a priority.
9. Regenerating town centres – ideas and realities: Discussed, better rail links needed.
10. Great Central, Roade and Castlethorpe: Roade needs a new station.
11. Any Other Business – any new members/offers to be an area rep: None but something to keep working on. Simon had had a letter published in the local Chronicle Newspaper and this was welcomed.
12. Day, Date, Time and Place of next meeting: Saturday 22nd February 2020 1.30pm set up, 2-4 core meeting, 4.30pm out. A speaker and earlier/better marketing would be sought by Simon.


Tuesday, 8 October 2019

English Regional Transport News Update

Dear Friends and colleagues,

The Strategic Plan - see link https://westnorthantsplan.inconsult.uk/consult.ti/WNSPIssues/consultationHome includes consultation/proposal to reopen the Northampton-Market Harborough line pegged to the reopening of the Oxford-Milton Keynes Western section of the East-West Rail https://www.eastwestrail.org.uk/
This would link main urban areas like Leicester, Northampton and Milton Keynes with access to and from radial lines to and from Oxford and Aylesbury respectively for both passenger and freight by rail. This would also enable a parallel to the M1 between Northampton and Leicester (gate way to/from the East Midlands Region) of which Northampton is traditionally Incorporated into on regional boundary allocations but is structurally disadvantaged with no direct rail link. So please do write emails/letters of support to the said Council and follow the news. This is a good new story potentially, problems and blockages to overcome doubtless, but in a Climate Emergency Crisis and a dire need to reduce congestion, give choice, cut air pollution from exhausts and frictions of rubber on hard surfaces, re-railing comprehensively is a key aspect of responsible response. 

Our meeting in Northampton tomorrow - see attached for details, all welcome to come and take part. Likewise Spalding for the March-Spalding missing link - we need to grow teams of people for our projects and welcome any time or skills or resources you may be willing to put our way for us to do more and better. It starts and stops with that front line being suitably serviced in terms of what we can reasonably do. 

We hold forums and other meetings in a variety of locations and people are welcome to tap into them, networking opportunities exist and collaboration can bring a wealth of benefit across the board. Please see our Blogspot for details and scroll down: https://ertarailvolunteer.blogspot.com/

Our next newsletter will be in November. Meanwhile thanks to all who do contribute or bother to take an interest. Our nation needs Government to commit to a rolling programme of local, conventional line reopenings, rebuilds and select new builds, not HS2 which arguably costs a lot, doesn't cater for freight and defaultive benefits are over-egged as all south of Leicester will rely on existing roads and rails with new growth and development. We must start locating warehouses by railways and ensuring they are rail connected and served lion's share including waste and recycling from day one. That is why we would welcome anyone keen to help us call for re-railing of the Northampton-Brackmills branch with a road-rail access off main lines, away from residential areas and off A45/A428. Milton Keynes Council have invested in a study recommending reopening Bedford-Northampton rail link (Northampton-Bedford-Cambridge and Luton/Airport and vice versa to Brackmills, Riverside Campus of University of Northampton, Delapre Abbey, South side of Northampton and finally the main line connection with a reconfigured Castle Track and Platform layout to accommodate more trains of whatever origin, destination and configuration. These heart of England areas are a critical test case for radial other similar rolling out of the model of intent and direction of the way our transport and environmental/land use mastery is to go. Please do write / email your MP c/o House of Commons, Westminster, London, SW1A 0AA.

Finally our conference in pencilled in for Saturday 25th April at Berkhamsted in Hertfordshire on the West Coast Main Line. Please see poster attached and feel free to pass on. More details in due course. Thank you. Our conferences bring people together, inform, exchange and encourage positive interest and actions commensurate to the task we face as a nation and indeed the rest of the world.

Yours sincerely,


Richard Pill
ERTA Chairman. 

For pdf docs please email richard.erta@gmail.com Thanks.

--
Association Chairman, Campaigns Advisor, Bedford-Cambridge and Bedford-Northampton Rail Links Liaison Officer, Membership, Bedford Area Rep., Publications, Sales, Media Spokesperson,
Co-Conference Organiser and Newsletter Editor: 
Mr Richard Pill, 24c St Michaels Road, Bedford,
MK40 2LT T. 01234 330090. E. richard.erta@gmail.com