Thursday, 13 October 2022

ERTA East-West Rail Update December 2022 - updated as and when!

21-12-2022 Another diagram showing what we need to do for our rail link choice to be done, contrast nil specification on East-West Rail's Northern Route E. We want them worked up, compared and contrasted and then a local referendum to let the people decide once and for all and then all parties including ORR to work constructively at 'can do' solutions, not rote prohibitions. I know this is the season of Good Will. Some principles are common, so getting common principles right, could result in a load of appliations. It is ERTA's view that we need a nationwide plan of action to reinstate select former railways and select new builds to make the rail network more robust, more engaging and relevant for more people and goods to be sent by rail. That saves land, that reduces emissions, is good for environmental and public health and gets things done in a more sustainable fashion. Currently as a nation we are heading the wrong way from a Climate Emergency perspective. 2030 is cut off date for going beyond the bar of global climate change being irreversible. Much of Government is planning on a 2050 date, whilst greenwashing serious climate change denial, deep rooted, deeply embedded in quasi belief systems, which, if we read our Bibles carefully, does not counsel sitting back and being passive, but being alert and doing what we may for good stewardship of planet, resources, sharing and ensuring everyone has the basics for life and everything treated humanely. It is ERTA's view that local to global, so comes down to what we do in our own backyards. Will you be a part of the answer? This is your chance! 




18-12-2022 Updated and more detailed diagram!


Here is, following feedback, our submission for our ERTA preferred route option for rails east of Bedford via St John's area. Not the final word, but more detail than East-West Rail have given on their Northern Route E, which apart from a line on a map, has given us no technical breakdown detail whatsoever. Really, both route options should be worked up to a full specification with a local referendum to decide once and for all and start building it to challenge growing traffic on widening roads along the Oxbridge corridor principally via A428 and A421 for example. Rail is essential going forward and in Climate Emergency lineages, time is not on our side to get these rail-based modal choices sorted and cut emissions and associated 'bads' on the back whilst keeping the wheels turning more sustainably! We welcome support, we are not nIMBY's, we are constructively seeking to engage via our limited resources - human, skill and financial. Steep gradients and long, heavy freight does not go well, our route is on flat land and half of which was formerly the direct Bedford-Cambridge rail corridor. ORR and Government needs to adopt a more flexible and versatile approach to rail. Level Crossings aren't popular, but often is road tresspass rather than poor maintenace, likewise bridges get bashed and are not panaceas. There needs to be room for negotiation, pragmatism and keeping costs down.

01-11-2022

I make no apology for a lion's share of an article I wrote end of August/beginning of September. Since then of course we've had 2 more Secretary of State for Transport and that latest one RT Hon Mark Harper MP remains unknown. An accountant with Jeremy Hunt as Chancellor and Rishi Sunak as PM, money, money, money seems to be their whole world and obsession. Pragmatically money matters, but if we value life at all and things beyond the mundane, then there's more to life than mere money and other values like people, communities, the environment and quality of life issues should also matter. We've gone down a path where commodification of life and privatisation for profit, still wants us to believe it offers the best prospect for value for money and service ethos with a smile. The jury is out surely. For my money, I can see some things the private sector can do admirably, others the public sector and to mix and match the two, can come unstuck.
On East-West Rail the Mayor extolls the benefits, but then insists on Northern Route E, i.e. north of Bedford. Doesn't want houses knocked down, so cramming passenger and freight extras to the existing slow lines is being insisted on as 'do able'. Our route, east of Bedford via St John's is put before these audiences and we would welcome them to pick up the phone, liaise and work at finding solutions to problems, demand it is worked up and the two route options put before the public maybe in a local referendum. It is such a crucial matter, worth getting it right. Northern Route E will have such steep gradients and demand things like pylons are relocated, our route, whilst not without challenges, is where campaigning can prove itself, not us, but bigger fry like councils, consortiums and companies working together, having appreciated the benefits  our route offers: a. flatter, b. less distance, c. probably cheaper, d. yet to identify any houses to be demolished with it and e. links East Bedfordshire with the County Town and vice versa, having recently lost the No. 73 Biggleswade-Sandy Bus link after 100 years (formerly the 176). Likewise, and note this, Route E does not offer any east-north interfacing for freight to/from the Midland Main Line North, nor do any other north-south lines being Bletchley, Bicester and Oxford. Our route does offer that as well as allowing east-west freight to bypass the busy Bedford Midland Interchange. Bedford-Northampton bus is cut back to mainly terminating at Turvey, disenfranchising Olney and onwards to Northampton. So for end-to-end commuting between these big towns, apart from the need to bypass Olney (rail), studies prior showed it would do end-to-end in 35 minutes as a Thameslink sort of operation and crucially with rails from the east via our route, takes freight to Northampton for depots and onwards to West Coast Main Line. That in turn frees up routes into, across and out of London and indeed capacity at Peterborough for example. Northern Route E makes no provision for this and is a load of cost for a straightjacket return.
Foundationally, the Government needs to switch from new roads to local rail solutions in budgetary terms. It needs to have a nationwide plan and get on with it now year-on-year. Instead of sitting on the fence to put it politely, favouring new roads is even more accurate as a description, which sends all the wrong signals.

ERTA will continue to try and get its message across, but as ever from education to proof of the pudding in the eating, delivery is still the only goal which informs more modal shift from road to rail. Thank you. Our newsletter is now out and anyone wanting a free pdf copy can send email requests to richard.erta@gmail.com

At last there seems a groundswell of movement to actually taking a consultation around rail links east of Bedford to the places affected: 

But what ERTA would like, is for our route options on east of Bedford to be worked up and the two options set before the public once and for all so that post Public Inquiry, we can get on with a rail alternative that adds up and is cost effective, not steep gradients, but on flat former rail alignment (for part). Problems to be overcome and worked on, finding innovative solutions like Cardington Road, Priory Level Crossing and much more, not straightjacketed rigmarole based on flimsy evidence it is a lack of maintenance that endangers level crossing usage, but public need for an education programme. It needs a more pragmatic approach of what fits a given scenario and landscape. Why should a local rail solution be held back by a dogmatic insistence that bridges and tunnels or bust for rail? 

There's always more, email if you wish to discuss. May I clarify we do not want to reopen the old St John's Station as one of my colleagues mistakenly said, but use the land for putting the railway back for a triangle and a railway east of Bedford.
Our appeal to Cllr Headley, Mayor Dave Hodgson, East West Rail Company and other promoting outlets and partnerships to talk with ERTA more. Big business is backing the IDEA of a rail link, but what we need is a comparative analysis of fine detai and get the process of formal consultation, Public Inquiry and outcome to be sorted by the end of 2023. Doing projects like this for decades - 35 years I've been involved and counting! - rather than say a 5 year or bust cut off deadline, means the potential to drag on. Now, if ever, we do not have that luxury. Development is happening and critical lands are being compromised. Unless we sort this sorry tale out asap, access and lands to link with the East Coast Main Line (ECML) in and around the Tempsford area, will be lost. That is like a business doing fish and chips saying "sorry we only do fish!" Optimal links for optimal use makes more business sense and public benefit by better and more sustainable transport options? So options need to be kept open.

Meanwhile, getting the government to say 'yes' to the proposed rail bypass at Ely to enable more freight by rail, would be a winner and should be supported by all. Thus, it is our view that were Ely to have a direct link to the south off Ipswich and Norwich lines, and link to our proposed route for East-West at the ECML Tempsford area, which is code for 'south of St Neots, north of Sandy'; then Cambridge would only be for passenger use mainly. Again, both options should be worked up and put before the public. There will always be NIMBY objection whatever route/s are put before the public, always some interest or not; but for my view, speed is not everything, any railway will beat the unadulterated traffic congestion on east-west roads and junctions, so even at a minimum of 25 mph, you will get to Cambridge as a nodal point of regional reference and links to other lines, quicker than road. Dualling the A428 Black Cat Roundabout - Caxton, still leaves the fact urban roads are gridlocked now, more traffic for more volume capacity facilitation, will result in compounding a bad situation, not making it better.


Politicians love the photo opportunity to cut ribbons. But we need to be more selective. What really matters? If we save that piece of land for conservation, but ignore masses of lands where hedgerows are cut to minimum, where topsoil erosion for want of trees and other foliage is rife and where birds have nothing to eat because production and chemical spraying takes precedent, are we really being 'green' or green-washing?






Tuesday, 4 October 2022

Reopen a new Northampton-Market Harborough Rail link and stations to benefit all!

10-11-2022 

Notice of Public Meeting subject to conditions of rail travel:




Details: To discuss Northampton-Market Harborough (MH) rail link being restored and accentuated others including stations, Rugby-Leicester, Magna Park and Lutterworth.

Local contact Cllr Peter James: peter341@btinternet.com

 ERTA Contact: Mr Simon Barber, 20 Fitzherbert House, Kingsmead, Richmond, Surrey, TW10 6HT T. 0208 940 4399 E. simon4barber@gmail.com





Monday, 3 October 2022

ERTA Guildford Area Transport Forum ~ Committed to seeking a reopened local Guildford-Horsham rail link. ~

17-11-2022

17 November 2022

 

Press Release

 

ERTA Welcomes Government announcement on reopening Bristol-Portishead local rail link solution

 

ERTA welcomes the announcement for reopening the Bristol-Portishead local rail link solution and wishes it every success. It has been long advocated and campaigned for and yet is but one of many likewise awaiting support across the country as a whole.

 

ERTA calls on the government to top-slice the allocated £27 billion new roads budget and pep up or tilt the Rail Reopenings Fund which is pitted at a mere £500 million. If the switch was enacted by the government, many more local rail schemes could be advanced and rolled out offering better public transport, congestion reduction through choice, more freight off roads and back on the rails as well as reductions to emissions, pollution and land take which new roads inform.

 

“There should be a nationwide switch and plan to ensure every region gets similar schemes. Colne-Skipton and Woodhead in the north and Guildford-Horsham-Shoreham in the south-east and elsewhere.”

 

End of Press Release

 

Further Comment: Mr Richard Pill, ERTA Media Spokesperson:

T. 01234 330090 E. richard.erta@gmail.com

Ref: https://www.bbc.co.uk/news/uk-england-bristol-63633295

01 November 2022
Press Release
ERTA Calls for support to reopen the local rail link between Guildford and Surrey and grasp other connectives as well.
About 7 people attended the recently held Guildford Transport Forum in Guildford and ERTA wants to consolidate support for progressing the local rail reopening between Guildford and Horsham. Lots of controversial development is happening beit new build, bypasses and the result is more road traffic. Dunsfold is another expanding area. ERTA calls on local councils to support the idea in policy terms, to protect the route from any further obstruction and round-table with neighbouring councils, agencies and Government to pool resources. We call on them to study the reopening idea with a view to progressing it to become government policy. Courting support and investment would bring benefits of footfall and spend to places like Guildford, a bigger share of visitorship, lower congestion rates. There is a need to be careful on regenerating and developing around Guildford rail station as spare land is needed for more by rail capacity. Rebuilding to Cranleigh and onwards to Horsham would enable trains to run-on to somewhere else than idle in existing through rails blocking other services. If the North Downs Line was made third rail, it would enable Guildford to be part of the Thameslink Network with a semi fast service from East Croydon in addition to existing services. The proposed Southern Heathrow rail link should be supported but extended to Old Oak Common Interchange and link on to the Chiltern Main Line. These give more options to ‘not via London and change’ for everything.
 
End of press release
 
Further comment: Mr Richard Pill 01234 330090 or richard.erta@gmail.com https://heathrowrail.com/

ERTA Guildford Area Transport Forum

~ Committed to seeking a reopened local Guildford-Horsham rail link. ~

Agenda for ERTA Guildford Area Forum: Saturday 29th October at The Rodboro 01483 306366 1–10 Bridge Street, Guildford, Surrey, GU1 4RY https://www.jdwetherspoon.com/pubs/all-pubs/england/surrey/the-rodboro-buildings-guildford Food* 1pm, Business 2-4pm (approximately). All Welcome. For numbers, please let Simon Barber know in advance. *Everyone is expected to pay for their own food and drink!
1.     Apologies for absence
2.     Introductions going round the table and fill in attendance list.
3.     Guildford-Horsham Rail Link: update, issues, goals setting and determine to push it pro-affirmatively through including a direct new link off North Downs Line for direct running south of East Croydon to Cranleigh and Horsham for example.
4.     North Downs Link, in a sea of third rail, surely the easiest option and enable Thameslink direct semi-fast running to Guildford and maybe on to Reading, saving changing at Redhill + new footfall and flow from visitorship off the Thameslink Network.
5.     Guildford Station and adjacent plans, land and capacity issues – plenty or not and what role could run additionally to Horsham enable?
6.     Membership, recruitment and volunteers willing to help on the projects? Rail must come first as it deals with bulk and actually helps remove congestion, pollution and emissions over all.
7.     Woking-Heathrow-Old Oak Common/tunnel to link with Chiltern Main Line and associated.
8.     Any Other Business
9.     Day Date Time and Place of next Meeting – say quarterly, same venue unless invited by others elsewhere within walk/taxi of a well-served railway station relevant to our goals.
·                     Horsham Public Meeting likely to be late April subject to funds and do-ability. Set dates today! Court sponsors and a speaker relevant to what we are seeking to nurture.
·                     Councils needed to help work up the merits, study the case and protect lands for reopening.


Meeting convenor and general information: 
Mr Simon Barber, 20 Fitzherbert House, Kingsmead, Richmond, Surrey, TW10 6HT T. 0208 940 4399 E. simon4barber@gmail.com






Typical Thameslink Train these days!

Sunday, 11 September 2022

ERTA Ampthill-Flitwick Transport Forum and associated news and events.

ERTA Ampthill-Flitwick Transport Forum

~ Seeking an Ampthill Parkway Station and associated issues. ~

Saturday 11th February 2023 1pm food*, 2-4pm business

Venue: The Swan Pub, 1 Dunstable Road,

Flitwick, Bedfordshire, MK45 1HP

T: 01525 754777 E: steph@theswanflitwick.co.uk https://www.swaninnflitwick.co.uk/

 

All Welcome.

 

Contact and convenor: Mr Simon Barber, 20 Fitzherbert House, Kingsmead, Richmond, Surrey, TW10 6HT T. 0208 940 4399 E. simon4barber@gmail.com

~ Everyone is responsible to pay for their own food and drink. ~

Background and now: This is your invite to our quarterly forum – be part of ensuring the adequacy of public transport capacity (rail), bus links and adequate lands for fostering more. Help us with shared ownership and responsibility. Triple stacking car parks solve one problem but create others. This in a context of growth of a 10-mile radius. Growth is inevitable whether on our own doorsteps or in a wider area contact beit Central Bedfordshire Unitary Council area or stretching from Milton Keynes/off the M1 to Marston Vale to Wixams arcingly and out to say the A6 Clophill/Silsoe sort of areas/A507 corridor. We have to give recognition that for many reasons people for London tend to drive south, saving money and drive-time to themselves for example. Wixams Station can deal with local residents accessing the local rail services, but will also have people bypassing Bedford Midland Railway Station (parking and congestion issues) and will land at Wixams to catch a commuter train to London or one of many destinations on that network. Also, a triple stack car park at Flitwick, will be courting a large and growing volume of traffic pitted at the twin roundabout single bridge linking east and west Flitwick, Tesco, the Station and other outlets. It is busy now, and what about better facilities for pedestrians and cyclists and denting car/vehicle dependency, the ambiance of the place, getting to/from Dunstable Road and much more? Is it being driven through as political expediency or is it being thought through as to how things will be in say 5-10 years’ time? ERTA believes the time has come to look at a new relief additional railway station on the industrial site at Ampthill. Ampthill and Flitwick would both gain with relief, sharing growth and the additional footfall, spend and visitorship such a gateway could usher in reviving local bus links and serving Woburn to Wrest Park and all in between including local schools and businesses. ERTA believe an Ampthill Parkway Station could be a win, win and therefore lands need protecting east and west of the site for a railway station. Studies need to be done and build the case with courting public support. Please join us and come to the forum, have your say, debate and work constructively for a more balanced picture in Central Mid Bedfordshire area.

Available on: https://ertarail.co.uk/publicity/ or via requests for the free pdf version via richard.erta@gmail.com

We (English Regional Transport Association/ERTA) have put together within our limited resources, to highlight some key issues which we believe are local debates around planning, development growth and conserving land-take, quality of life and ambiance. It is a fact that pollution from exposure to exhaust and tyre particles harms human respiratory and other health related issues: https://moderngov.kingston.gov.uk/documents/s21745/I_Vehicle%20Emissions_WG%20Report.pdf and https://blog.greenflag.com/2019/tyre-particles/ and https://www.kcl.ac.uk/news/study-supports-link-between-traffic-related-air-pollution-and-mental-disorders Whether fossil fuel powered vehicles or electric vehicles (EVs) the one emits harmful gases to respiratory and causes other health related issues and evs of themselves may 'cure' that, but tyre particles causes harm and evs do not deal with unadulterated rising volumes of vehicle dependency and proliferation in the wake of large scale developments without alternative infrastructure like an Ampthill Parkway Railway Station may inform. To pretend otherwise is to put head-in-sand and we need to stop, think and do alternative approaches within respective powers and advocacies now. 
To keep the option of a fully working Ampthill Parkway Station, we need to:
1. Protect lands west- side of the Midland Main Line and north of Froghall Road for relocation of a few business units, parking and riding facilitation and an access road off Fordfield Road from A507 and to Centre Parcs within walking and cycling distance.
2. Club together to study the matter, make the case and court further support and funding. We need councils to be interested and supportive. We have been told lands west of Midland Main Line and north of Froghall Road Road are earmarked for housing by 2030 some time ago, so why not use this opportunity to ensure it is used for the rail-based development instead which will alleviate Flitwick and Ampthill whilst revolutionising visitorship on a sustainable basis? Greenbelt can be saved and conservation pocketed in designs more if we ensure the strategic public transport people actually use - rail and station access - is kept as and progressed as a viable option. 
3. Please appoint a liaison rep and send to our Ampthill-Flitwick Transport Forum to help us in deliberations and moving the matter forward please. We have an email loop specific to this matter and all are welcome to join it for liaison via requests to richard.erta@gmail.com Thank you.
The future can be brighter if we get this transport matter positively handled, if we block it, refuse it or scupper it amidst development of the wrong sort without public transport infrastructure, we harm the people we purport to serve and throw away an economic source of positive input. Please don't let that happen. 
As an addendum, Biggleswade is getting enhancement following many years of campaigning and will reap benefits from that. Likewise Flitwick Rail Station is secure and getting improvements, but is land locked to cater for a lot more regional growth, unless you triple stack parking. Few want that and the roads certainly will struggle with the volumes. Ampthill Parkway Station could share the growth load and balance things out more. That is both our conviction and aspiration and we welcome you to join us in it and invest for the medium term. Thank you.

Ampthill Flitwick Forum Notes from meeting at The Swan Pub, Dunstable Road, Flitwick, Bedfordshire MK45 1HP 1pm food, 2m business.

Present: Colin Crawford, Simon Barber, David Ferguson, Richard Pill and Mr Stephen Anderson, Center Parcs, Woburn Forest, Fordfield Road, Millbrook, Beds. MK45 2HZ.

1.     Apologies for absence: Ms Jodie Irwin, Principal Strategic Transport Officer, Place and Communities Directorate, Cllr James Jamieson, Leonard Lean. 

2.     View of Centre Parcs: They are reviewing sustainable travel issues and only a low percentage comes by public transport, most by cars/vehicles. The resort is back at pre-covid levels and a station at Ampthill with access west-side for Fordfield Road could be handy for workers and others visiting the centre, giving more options. It was suggested that an arcing bus from Milton Keynes Railway Station (West Coast Main Line) – Ridgmont (to be part of East-West Rail (Oxford-Bedford) and Flitwick (Thameslink/Midland Main Line to principal cities, airports and Eurostar could become a winner.
3.     The case for the new Ampthill Parkway Station: Ampthill is an important addendum attached to the area, but the Parkway Station would serve a much wider and diverse area. Currently commuters come to Flitwick from Milton Keynes, M1, A507, Marston Vale, Ampthill-Flitwick conurbations and out to the east to and from the A6 catchments. It was noted that people tend to London commute – drive southwards for private space and to save on cost. Thus 36, 000 South Bedford + 18, 000 upwards.
4.     Background and arguments:
Kempston would drive south to the new two-platformed Wixams Station, but all at Wixams and south would continue to Flitwick. Flitwick is land-development locked-in and so unless they triple stack the car park (blight) there is not a lot of expansion potential. Moreover, the increasing all-day volume of traffic centred on just one bridge spanning the railway is a major pinch-point and congestion in all directions with local residential conflict and objection will only get worse. The overall volume of traffic, station apart is up. It would be a nice thing to have a bridge zebra crossing to enable safer and easier access from station to The Swan Pub (accessibility) especially for disabled people. Current arrangements are lack-lustre and inadequate. In 2004 Ampthill Town Council paid for a outline pre-study by Scott Handley Partnership which indicated you could slot a station into the busy and frequent timetable. More Ampthill background can be found on our Publications site: https://ertarail.co.uk/publicity/
Wixams and Ampthill could coincide together without conflict as of 5 trains per hour, even twice hourly stopping at Ampthill would be a benefit and the London-Corby electric trains could also make a stop (a few). As for close proximity stations, Luton and Luton Airport Parkway are closer than Ampthill – Flitwick gap and a Thameslink Train at approximately 70mph took all of 37 second between old Ampthill site and Flitwick. If we add 5 minutes to calling at an Ampthill Parkway Station ‘all in’ do the gains as a relief station in a context of growth make that sacrifice worth it for greater gains on and off the railway? Ampthill has walking, cycling and bus + vehicle access/parking + kudos of being on the national railway map and the marketing potential of weekend breaks and visitorship close and easier is something for a wider area to benefit from surely? Woburn to the west, Wrest Park to the east.
5.     Taking it forward:
a.     Simon and Colin to have an exploratory meeting with Ms Jodie Irwin, Principal Strategic Transport Officer, Place and Communities Directorate and to try and see what scope for working with the council in taking it forward planning, case making, building support, bringing key land owners and others together to our forum meeting and/or elsewhere. Given we were told the Paddocks west of the Midland Main Line and North of Froghall Road were to be developed by 2030, time is running out to salvage a road link off Ford Field Road for the station, space for a 100 car park and exiting/access to the 2 slow line platforms (see Wixams model for detail of design) and possible relocation to the west for some immediate industrial outlets to enable east-side access to a small booking hall, ticketing booths and maybe a coffee lounge and toilet facility and maybe a click-send, click receive parcels facility?  
b.     Decided to meeting Flitwick the Swan Pub for time being. This and June 2023 date for next meeting would be reviewed by the Executive Committee. Ideally local people would warm and adopt the idea and advocate it informing a small team. Alas we do not have that, so more leafleting is required with a message which strikes the right tone.
c.      Colin and Simon to have a meeting with Cllr Mark Smith – Ampthill Town Councillor, Central Beds Councillor, Bedford Voluntary Bureau Officer and key orchestrator of objections to plans to development across Central Bedfordshire. The station would make any development – which is happening regardless of infrastructure now – more sustainable and manageable surely?
d.     Richard to produce a new flyer/pamphlet but needs help with Speed, Distance, Time Calculations/more volunteers generally. Meeting finished 14.40pm.

All enquiries via richard.erta@gmail.com Offers to help are welcome please. You don't have to be just a local either!

See our website publications page for more: https://ertarail.co.uk/publicity/ 





 

Thursday, 8 September 2022

Transport Reality - what for rail choices? TfSE needs a reality check

re: https://transportactionnetwork.org.uk/campaign/road-to-ruin-for-se-plan/ 

Please do a meeting and try and win over to what we wish for - namely Guildford-Horsham and Shoreham + Polegate-Stone Cross or variants thereof. 
This is appalling if we take a Climate Emergency seriously. 
They should be coming forward incorporating our rail-based solutions and delivery mapping in a timely manner 2030 not 2050!
People can join ERTA and swell our active ranks. People can write to their MP's, any 5+ letters and they are mandated to act apparently and join our Guildford Forum on Saturday 29th October 1pm at the Rodborough: https://www.jdwetherspoon.com/pubs/all-pubs/england/surrey/the-rodboro-buildings-guildford
If you want more and better, join us, help us, offer to serve and assist. It can be done if we can get enough reliable people involved, holding councils and candidates to account - what can THEY DO? They need to audit the blockages and find/study solutions. They need to pool agencies, other councils and tap into grants to invest in case-making studies to take the projects to next stages of Network Rail's GRIP and DfT Reopen Railways Grants to advance the candidacy and have development policies tailored to inform pro-affirma re-railing. I don't under-estimate the challenges, but do also feel alongside that, the problems conceived or actual can be seen as a looming shadow, when the reality is more straight-forward and less daunting.
Please give us your support: https://ertarail.co.uk/
Electrification of the North Downs Line would bring footfall and spend to Guildford from South London/East Croydon by a direct Thameslink inclusion semi fast, leaving interim stations for the Reading-Gatwick shuttle to serve, which - given the sea of third rail - should be pragmatically done as an infill engineering rectification for efficiency, not debates and no action on hydrogen, greening or default status, unsatisfactory quo. Likewise, Guildford Station - we get mixed feeds of 'loads of spare capacity' and 'lacks capacity for more services'. Which is it? But in any case, the restored rail link to Horsham would enable a train to deliver and off-load, run onto somewhere else, clearing the platforms for other services. Currently, coming in, unless you're heading North Downs or Portsmouth, standing idle at Guildford blocks that other access. More land, more sidings, more reopenings is the way to go if rail market share is to increase, reducing congestion. More roads just deliver more congestion, pollution and harms the public. https://academic.oup.com/jpubhealth/article/33/2/160/1591440?login=false Food for thought! But there's big money and influence at every level and so the log-jam of people having more alternative choices needs breaking and enabling choice more and people to walk free of locked-in dependency, however luring.






Wednesday, 31 August 2022

ERTA Newsletters - be part of our email loop!

Greetings. It is that time of year again. ERTA produces a bi-monthly newsletter which serves our purposes and budgetary arrangements more often than not. We have people and organisations come to us from a variety of walks of life and frankly we can never satisfy everyone. 

If you want more, be prepared to be part of the answer of will something happen or more and better. That is the only way we can grow and do more and better. So things like joining ERTA as a member helps us to pay our bills in the endeavour. Volunteer to help, we ask about 1 hour per week minimally. The opportunities abound. 
I am convinced we can tailor something for everyone which works well with us too. To get anything done, to do anything justice requires reliability, commitment and a shared vision. Compromise to get the greater good, do not compromise to get it done! The more people I can organise to recruit more area members, focus on specific projects, team-working and making representation, case research and field work, the better. Then there's running the association, the Executive Committee, Constitutional work, administration and yes, we do seek more people to be the answer to strengthen our work. 
Membership is a gateway. We do take on some non-member volunteers, but it is hard work to recruit. Sounds familiar? At ERTA we still need a flow of new blood frankly of a lower age profile. Many ask themselves "what's in it for them?" or want 'instant satisfaction' whereas many projects we engage with demands patience, sacrifice of time, interest and endeavour. We need a dedication to make the news for the right reasons in and out of season, not just follow the news or what is popular.
On the campaign front, things are happening, pockets here and there and that is of course welcome. However, the system and process is painfully slow, money is a finite resource, and we wonder sometimes whether it is being well-used for optimum effect. 
Most reopenings have exceeded expected usage and indeed the closures and dismantling of the most intensive railway system in the world as once was, was based on a false premise and misconception in the first place. Some believe the closures were wholly justified and we are where we are today as the outworking default and instigated design result. 
Others believe the closures were wholly political, wrong and detrimental on and off the rails in terms of legacy and impact. Not all can be reopened now, many cases are too far gone. So rewinding the clock is not a realistic option. Where salvage and recovery can be done, needs to be kept open as an option, identified and a system needs creating which moves towards reopening more. In every way, we're running out of time in a Climate Emergency and the resources to rectify or seize opportunities in a timely manner. 
One Christian Church friend I respect, acquainted with management, said to me "the car will be the last to go". It threw me slightly, but if we settle for less, what could it look like to turn for example 90% freight currently by road to 50% by rail more? Northampton-Coventry-southern rail bypass of Nuneaton-Leicester is possible to do if West Coast Capacity enables on the back of HS2, but like Werrington near Peterborough, is a great way round and direct roads have the advantage. 
So getting more direct rails makes good sense and working back, protecting routes and working towards reopening seems prudent. It is also as every other scenario, protracted. Some areas are excelling more than others, other places are virtually rail deserts. 
It will take a very bold and committed government to redirect away from £40 billion new roads to £20 billion rail reopenings budgets and only £20 billion new roads, but that is what we need, not more money, but a better balance and level playing field to enable do-ability more for what we wish for, not avariced 'all eggs in one basket' purported panacea mega projects, which promise more in decades, whilst proverbial 'Rome' burns or floods today! 
Please stay with us, encourage others and let's work together, however loosely to see some social, environmental and economic justice done and our area of focus has to be getting the transport right surely?
To join, look at this page on our website: https://ertarail.co.uk/become-a-member/
Thank you.
To receive our free, no obligation pdf newsletter, please email requests to richard.erta@gmail.com


Wednesday, 24 August 2022

East-West Rail Turbulence: ERTA points the way for rail and save some money!

Bedford Midland Station Designs: https://sacuksprodnrdigital0001.blob.core.windows.net/regional-long-term-planning/Eastern/Bedford%20Area%20Strategic%20Advice%202022.pdf is the latest installment in the saga. Good news intrinsically, although we want a rail route going east of Bedford via St Johns, not Northern Route E which in our view is costly and engineeringly problematic, let alone environmentally more questionable than going along an established former rail corridor for some of the way?





This is a failure of tiers of Government as well as anyone else. On the one hand, ERTA takes a view the route between Bedford-Tempsford area-Cambridge was unworkable beit engineering, steep gradients and lack of things like east-north from east-west rail to Midland Main Line which the design did not incorporate. On the other, taking prior support and with reworking for the taking into account development creep has curtained off the Sandy area for accessing the north-south main line (East Coast Main Line/ECML) and that such a physical linkage was not inherent in the 2019 consultation, means the wider range of market potential inclusive of north of Stevenage, south of Peterborough and East Bedfordshire is written off, but no-way are people to be expected to come to Bedford from one of these areas changing trains at middle-of-nowhere even with 300 new houses Tempsford to come to Bedford when they can drive or bus in less waiting time? 
ERTA believes we do need an east-west rail link and discerns that freight should be an important element in such a design. However, a passenger line serving Cambridge as one main market and a new passenger and freight line to link with radial lines at Ely: https://www.networkrail.co.uk/running-the-railway/our-routes/anglia/improving-the-railway-in-anglia/ely-area-capacity-enhancement/ which is being pushed for a rail upgrade but being stalled by... government! Who is the Secretary of State for Transport? Is it not one Rt Hon Grant Shapps? Again, as with the strikes, he is unwilling to consult with us and consider a Plan B option, it is do or bust and that is sadly, unworkable.
As for Richard Fuller MP's rhetoric, we should note A1 and A421 roads are being flooded by unadulterated growth of traffic in a context of no east-west rail comparative choice in 100 miles north of London. Black Cat Roundabout and dualling to Caxton (near Cambridge) will at best buy time, but the development rate and overflow straight onto the roads, means that gridlock congestion, urban, rural and at junctions is at best delayed, but when it comes, what then? A1 motorway-isation has been on the cards for decades and where to put bypasses of built Biggleswade and Sandy bring their own issues, to the east of Sandy you have growing Potton, to the west growing Beeston and Blunham/Ivel Valley course of river. To tunnel under Sandy Heath would conflict with RSPB HQ (birds!).
There's no easy answers. 
ERTA appeals to Councils, MP's, DfT, East West Rail Company and others to talk with us, reason with us, invest in studying our proposals and do a comparative assessment contrast the cost, upheaval and other issues including getting through Black Cat Roundabout area which does not make passive provision, and see our suggestion could make a whole lot of sense. Currently we feel marginalised and ignored by the media and the various parties and we wonder why? Suffice to say "the stone the builders rejected, turned out to be the capstone!" So we are in good company!
Please stay with us. Join our loop via email richard.erta@gmail.com and for the pdf - but the situation is changing all the time. Page 18 of the current Modern Railways Magazine* apparently has a new story of a new platform at Bedford Midland. This sounds like what we have suggested for catering for Oxford trains calling at Bedford. Two bays are needed. But it is made in such a way as to keep open going north of Bedford. That means station booking hall rebuild, that means 2 new arches under A4280 Bromham Road and knocking down 40+ houses with 6 tracking; so bays seem more sensible, reversing and out from the southern link. However, for freight going north of Bedford, better access to the existing twin slow lines is needed, so a complete redesign/revolution is required. If, when and what we await with excited anticipation and of course the upheaval it will inevitably bring on and off the rails. There's always more and rationale can lead to conspiracy theories rather than to put it baldly 'cock-up'! Jury is out, but a roundtable could bring representatives together including ERTA Reps, and together we could work at making a rail link a success, rather than an embarrassment. Realism wrongly predicated on pollution, large land-take and environmental degradation, is unsustainability by design (more roads only answers) and a false premised economy. We need a sustainable railway and our suggestion could reduce costs, speed up end-to-end journeys and rebalance road-rail usage. If Dr Beeching could see the strategic potential of retaining the Bedford-Cambridge rail link, x3 over 6 decades of growth on and off the roads and rails, then so should we. Location, location, location! *From text, now corrected, it is to be on the west side of the existing station. That will cause its own issues and is mega disappointing.




East-West Rail Turbulence: ERTA points the way for rail and save some money!
For reflections on the past, please refer to reference (1) below and scroll down and click! But the announcement that Grants Shapps may cancel east-west rail (2), surely does not mean Oxford-Bedford which is a rebuild job, but the new construction ‘gaps’ between Bedford and East Anglia. On the one hand the problems were inherent with the whole project from the start. Disunity amongst the rail fraternity and on the other a post-rail culture developing where roads are the way for freedom. Carefully ignoring congestion blight, but seeing more roads as the answer to congestion, not rebuilding rail links.

Caption Left: Bedford-Sandy trackbed at Goldington looking west 1985. Why build brand new with up-hill/down-hill, when this flat land commends itself and you can always slew a cycle/footpath alongside in such an open-land context surely?

In 1985 that was very much the emergent case and in 1987 when the first organised effort to formally suggest the rail link east of Bedford should be supported, met with incredulity. Interim, bypass building has been done and the volume of traffic has grown to fill the new vacuum of capacity created. Despite the views expounded and reified by media that bypasses offer relief from congestion, in fact, Bedford is very much congested today despite those bypasses. With the growth of development, that congestion will grow and be exacerbated and with roads everywhere, there will come a day when nowhere else to go transport-wise. In short, a rail link east of Bedford is essential to counter-balance the growth of traffic and bring some choice to the market of business on offer. ERTA has long argued that whilst we need them, buses are no good at luggage conveyance, bikes or freight. Only the rail alternative can cater for this, to reduce the juggernaut volumes and give car owners a decent alternative to make them think public transport as a realistic and viable option. Where things went wrong, apart from disunity at the start and counter-objections to a bridging of the former Bedford-Sandy trackbed east of Bedford with the A421 in 1993, the 1997 Steer Davis Gleave Consultants report made the case for a Bedford-Cambridge Railway, but Bedford Councils could not make up their minds! Some touted an inner route serving Bedford and faithful to the old route, others wanted a new-build outer railway avoiding Bedford. They wanted cake and eat it, the darn cheek being they had spent a decade saying things like “there’s no case or demand for a railway” and “blockages prohibit rebuilding” I paraphrase from letters I used to receive from them. They knew we lacked the resources to challenge their bigoted views. Then, here, 1997, the report of consultants, trained and experienced in such matter are saying “it can be done” and “benefits if done to…Bedford!” – again I paraphrase. All we had been saying was shown as ‘do-able’ being getting east of Bedford via the old route, realignment south of Blunham and a new route north (then) of Sandy with connectivity to the main north-south main line and new links to Cambridge via the Ickleford Curve. Alas it floundered, alas the disunity meant government following a post Iraq financial deficit, took its money elsewhere and just turned the question back to focusing on the then ‘western section’ Oxford/Aylesbury-Milton Keynes/Bedford. East was abandoned, Central Beds Council as it became developed over the north of Sandy lands blocking off access for a new railway. So, we come to the 2019 consultation whereby it comes up out-of-the-blue, with a new route east of Bedford. Our lay assessments showed that it was engineeringly challenging to put it mildly and ill-judged. On engineering, environment impact (knocking down houses) and fit for purpose criterion, it was dismissed by us in utter disbelief and disappointment and we counter suggested a new-build using the old route instead with realignments at Willington and instead of south of Blunham, to go north of Blunham. Their meeting point was ‘south of St Neots and north of Sandy’, which by my map means the Tempsford area, north or south of Station Road. But despite our efforts to warn the EWRCO that their new route north of Bedford would court a lot of opposition, they ploughed on and now it hits the buffers. That means we get the Oxford-Bedford link, but no rail link to East Anglia. 

If we wait 10 years, rate of development means all options will be lost. A421 is growing like M1 with about 50% juggernaut lorries, so any new railway must cater for freight from day one, ideally in roll-on, roll-off/Piggyback terms, we must have vision for this and build accordingly. But the proposed new route had steep gradients, was circuitous and lacked connectivity with the East Coast Main Line (ECML) in the Tempsford area (Peterborough, East Beds and Stevenage for example in scope) and as for the new route to Cambridge, because and weaving between development, avoiding compulsory purchase and re-build, it weaves to join the Royston-Hitchin line from Cambourne on new trajectory and against the grain of the landscape meaning new embankments of some size. It is a circuitous route, a controversial route and costly.Our route to ECML from Bedford uses the old route to just west of Willington. A realignment is possible, but speed need not be the main consideration. Our route then goes north of Blunham to approach the Tempsford plains from the south-westerly direction with physical connectivity with the north-south main line for optimum passenger and freight reaches to the Bedford-Oxford corridor and vice versa. Our route is shorter and probably cheaper than Northern Route E and despite some councillors claiming to the contrary have yet to specific exactly what houses would need demolishing if any, whereas 40+ in the Poets area of Bedford would be required for the Northern Route E, which our route would be hard pressed to equal! Yet for all that, the Mayor, for all his attributes, has failed to grasp these merits and lead from the front in asking our route to be assessed with a view to overcoming challenges, not building new housing on the old St John’s Station site which would scupper any rail link east of Bedford forever. Caption below: Simon Barber captured the old St John’s ‘green site’ in urban Bedford circa 2019. Why block an amenity for housing, when a railway + a green corridor could really add something in the urban context, including traffic reduction?
On east of Tempsford, we believe there is merit in connectivity to Cambridge principally for passenger requirements. However, if the link to the Royston-Cambridge line proves too much, we believe a new look at a new rail rebuild to link with Norwich, Ipswich/Felixstowe and Cambridge/Stansted lines from a new multiple linkage at the Ely area from the west. If we act now, lands can be acquired and the new link pushed through. A key objection from Cambridge is that loads of freight through the urban centre would be counter-intuitive and given the capacity constraints both there and Newmarket Tunnel, I can see their point. If all goes via a new link across to Ely and the Ely bypass being mooted but stalled by… government, whose Secretary of State for Transport as at 23-08-22 is still Rt Hon Grant Shapps MP despite Government agreement we are in a Climate Emergency, is pursuing roads and counter intuitive policies to any environmental/land-use stewardship cares. It presides over ever-more uncertainty and seems to be wobbling like a jelly, rather than a bull-by-the-horns and leadership, direction and cascading money from road to rail and an investment for a better future and lowering our emissions footprint at one and the same time. When win, win stares you in the face and you ignore it, begs the question as to whether it has an objective and honest evaluation of the needs and situations this country faces. Suffice to say Government finds money for roads more easily than rail projects of an exact similar nature. If our route suggestion is less than Northern Route E, why not evaluate, compare and contrast and go for it to give hope of some traffic reduction relief to urban areas and land savings for rural ones? The £950 million Black Cat Roundabout (3) remodelling and dualling to Cambridge will, like A421 M1-A1 only full with more traffic which then backs up at junctions and once capacity filled to gridlock, has no Plan B. Urban areas cannot accommodate it and so, unless we make the rail link a priority, we are in a dire situation of false premises. The railway is the right way to go, our route, not Northern Route E, which even lay people with some local knowledge could work out was not going to succeed except as some kind of vanity project which does not serve rail well. We welcome all parties to round-table with us and crack on with a rail link east of Bedford. 
References:

1.       https://ertarail.co.uk/publicity/

2.       https://cambridgeapproaches.org/secretary-of-state-for-transport-wants-to-cut-ewr-tranches-2-and-3/

3.       https://www.newcivilengineer.com/latest/planning-milestone-hit-for-national-highways-950m-black-cat-roundabout-upgrade-22-02-2022

Route for rails east of Bedford ERTA supports: 

1. 


 2.