Monday, 4 April 2022

Bedford-Sandy Rail Link; can we learn lessons for elsewhere?

 Bedford-Sandy Rail Link; can we learn lessons for elsewhere?
In 1987 I called a meeting at The Bell Pub in Sandy, opposite the railway station and out of it came an association to advocate reinstating a rail link between Bedford and the East Coast Main Line at Sandy. Since the line originally closed in 1967 and during the 1970’s, development had encroached the old trackbed, first a school and then a few houses including at Blunham from 1985.

Apart from this, the reopening was suggested to go to the south of the Blunham houses and swing to a new link to the north of built Sandy; to have a new link with the north-south main line, north of Sandy. This was understood, but mocked and ridiculed by some who you would have thought would be more charitable, but of the rail fraternity itself, who were the leaders in generating clouds of cynical opposition, masking their jealousy that they lacked the courage to step out and think the much talked about, but not made public thought that closure was a mistake and reopening the only answer and justice to that mistake. Questions of interim damage to bridges and old trackbed, were found to be over-come-able and these rudimentary apprehensions were picked up by the later East-West Consortium who took these very ideas and found a systematic professional evaluation in the 1997 Steer Davis Gleave Report.


A point of lessons transferable is as follows maybe:


1. Just because a closure has happened, it does not necessarily follow that it cannot be reversed.
2. You can’t turn the clock back; you start where you are at and work out solutions to challenges and problems.
3. There was a time when land abounded and deviations/realignments were plausible and became by-words to leverage support for the belief in the do-ability of a conceptual process.
4. Now we have a largely built environment, routes have not been protected much in many cases if at all and so now the question is more-like a. do we want the railway back? b. what audit of obstacles and possible solutions and costs accrue? c. is it expedient to consider new route options alongside a traditional core route and d. if a new Network Rail styled daily use railway, it would be a railway of 21st century construe, not a Victorian rail interpretation with the baggage of semaphore signalling, gated crossings and lots of paid manual labour!

Speed is not so much the issue. Yes, there’s a view if you have speed, you can put more trains down a line and carry more. But then you get into 3-mile braking distances, limited station stops/areas served and delineation of passenger and freight, whereas the sort of railway I believe in is one which caters for all using the same tracks. By all means have fast and slow lines, but all means ensure all large communities and distances between areas get their fair share of station access. Please bear in mind freight and passenger line growth plans can nurture business as once the line ir reinstated, new built or mix and match of the two usage grows through sheer choice. Keeping people moving is what matters, serving communities too, not just end to end considerations.
 
Some say you can’t rebuild for example a terminal branch alongside the A16 between a new triangle junction at Firsby in Lincolnshire and Louth for example and the usage case would be negligible to warrant the £billions outlay. Not only has Greengauge produced a report saying what a worthwhile thing it would be to do precisely this, (http://www.greengauge21.net/wp-content/uploads/Connecting-East-Lincolnshire-Greengauge-21-FINAL.pdf) but there is a campaign for this ‘reopening/new build’ with some council interest. It failed to court Government funding for continued study, but for an area where poverty is significant, a rail desert thanks to the closures abounds and the promise of all-year-round footfall and spend to regenerate local incomes seems a win, win. Yet, still some deny all this and ridicule those who raise it. Supporters like me point out that the Borders Line between Edinburgh and Tweedbank has carried over 4 million people in its first few years and has been a success promising more like the through benefits of linking with Carlisle could offer; but opponents in East Lincs say “the model is not transferable” – on what grounds they do not seem clear, but these head-in-sands swathes of viewpoint, do nothing for the environmental benefits of re-railing, of social inclusion and integration and the benefits of rail connectivity.

On Bedford-Sandy, the debate has moved on to other routes than the original. Even our own ERTA takes the view as do I, that the old route between Bedford St John’s and east of Willington could be recovered (everything comes at a cost!) and thence via a new route on embankment north of Blunham/South of the River Great Ouse, across the River Ivel and A1 respectively to approach and link to the north-south main line north or south of Station Road Tempsford on what we call the ’Tempsford Plains’. If we wait 10 years this option will be lost. Mid Beds (now Central Beds) seems to have had a covert policy of destroying former railway trackbeds and scuppering hopes of recovery, ditto South Cambridgeshire! It is worth remembering cycle and footway courses on old trackbeds can be slewed/re-directed easily enough. 


Likewise, canals (Guildford-Horsham) and as for tunnels (Woodhead) a new bore could do the job and gain from modernised design methods. Now the politics are cowardice from facing up to what needs to be done and a third party to hide behind which bridges or tunnels to avoid levels crossings and has as a third party with anonymity built-in and thus unlike politicians unelected, but has avariced powers and legal construes which give license to in not so many words say to barriers “here’s the cheque, move please!” You may agree or disagree, NIMBYISM has legitimate voice on the one hand but can be head-in-sand as well. Discernment, differential impartiality and declaration of interests all helps pin-point where things are at and more scrutinising journalism could be useful/academic researchers who publish widely likewise. 


If we wish to reduce road-based traffic and foster choice and modal shift, re-railing the nation is essential. We must have a pro-active plan now and onwards for fostering more passenger and freight movements by rail and ensure the net-work is robust and comprehensive enough to cater for it. Reading is a pinch point for Southampton-West Midlands and how ridiculous for deep sea landings at Southampton to be heading north of West Midlands, but taking road and rail capacity all those miles to and from, when Hull/Liverpool and a new Woodhead could be just the ticket for cutting transport miles, time and cost? Yet this, by some rail media journalists is denied with an overplay on cost, case and the past glories of a different age. 


They fall short of making the leap to what was called for in the run up to closure of Woodhead 40+ years ago, that it should be integrated with the rest of the network (25KV rather than DC electrification) and enable diverse operations and capacity, not just coal. Now a combination of passenger aspirations, containers and other extra capacity utilisation of diverse trains could really benefit from Woodhead rebuilt as well as declutter the A628 which with other trans-Pennine roads are being called for progressive upgrading based on a false premise, that the rail alternative was crushed and 40 years of deficit been allowed to build up to a congested problem in the heart of a National Park! The report conclusion is ‘can do better’. Inland Roll-on, Roll-off, should be created and laid out from Channel Tunnel-Orbitals of London and Edinburgh/Glasgow and Cardiff and Exeter for example. Yet there is no plan as I am aware of such. Crossrail saved money on conventional tunnels rather than Continental Loading Gauges, which could have allowed Channel Tunnel/Europe – Birmingham through services. Tinkering plans for redesign to enable North London Line-HS1 and HS2 access arcingly for a joined-up-railway all well and good if can be done, but misses out Heathrow with a need to change trains at the emergent Old Oak Common (OOC) interchange station. 


As one former manager said in the rail industry “we don’t do joined up in this country”. That sadly does not have to be the case, but seems to be. Hindsight is a wonderful thing, but given the closures of local railways are systemically a root problem historically underscoring so much of todays transport, environmental and logistical issues, rectification as much as possible or even a year-on-year start using indirect taxes of nudge psychology a bit like taxes on sugar and plastic for example, to encourage behaviour change would be a start. What we end up with (cynically) is tax for Chancellor’s empty bucket and less-than a trickle of select reopenings, rather than a full-blown ‘Reverse Beeching’ agenda RT. Hon. Grant Shapps MP, Secretary of State for Transport promised early after his appointment. The public give and get fudge, but government finds £billions for new roads, but not the same for local-regional rail reopenings either direct or in grant funding or specifically let other councils/agencies ‘get on with it’. 


We need a speedy delivery, a concise transport focused policy in rail’s favour and built in to it a design and accessibility which covers all pockets and addresses hard-pressed families and matters around transport and affordability. Bedford-Bletchley if reliability issues and bustitutions could be resolved once and for all in rail-based operations favour, is relatively cheap cost-wise. How the local shuttle service will sit with the East-West Rail without selling out of total reformation remains to be seen. But the principle of local railways for local people and places in connectivity terms remains a principle to be cherished. One church tried to sit on a ring road but the larger numbers did not materialise. It relocated to a community hall next to an estate and it worked, with people identifying it as ‘their’ church.


On Bedford-Sandy rail link, we started off wanting more-or-less an extension of Bletchley-Bedford running on to Sandy as a minimum with connections to the north-south main line as an interchange. Cambridge as a nodal place of magnetic proportions loomed always in the background with past and future aspirations always ‘there’. Means-ways were mooted, found but came to nothing. 


A vision for 10 miles of partly reinstated and new railway, were blown out of all proportions to astronomicalism, and now at £4.5 billion budget and many professionals engaged as in a rugby scrum half, the fight is ‘on’, but Northern Route E creates as many problems as it purports to solve and at the Cambridge end, South Cambs District Council objects all the way having done nothing to protect the old route or realignment space alongside it. There are no panaceas. The old route at Cambridge is severely blocked with M11 looming large and the list after that is monumental by our standards. More is the pity, but again, can lessons be learnt elsewhere to make recovering a railway easier?


We face an existential crisis. Time and resources are finite. Religion can be a tremendous source of hope and faith leads to vision and aspiration for a bit of heaven here on earth. Entrenched polemics can lead to introversion and the worst of humanity, when we actually need some coming together, agreement that we do need a railway and a recognition that some sacrifices, compensation and relocation in some cases serves the greater good, but that speed and stealth is not the answer either, as alienate enough people and you get more upgraded roads and congestion/parking problems and all the associated dysfunctions with that default agenda of pollution, land which cannot be used for things we cherish like farming, conservation, recreation, housing and places of employment appropriately balanced to the round of the quality of life and proportionate to need and demand, not just market whim or vested interests.
 
Richard Pill
03-04-2022
richard.erta@gmail.com

Captions Below:


1. P.1 1988 Class 317 heads towards Sandy on the slow line of the East Coast Main Line.
2. P.2 1989 Looking east and north east from Girtford Bridge, now 33 years later all built up!
3. P.3 ECML looking northwards with old Fallowfield’s link inserted during the war visible.
4. P.4 Diagram of our predecessor organisation, shows how we once thought the rail link could go. Now all built over.
5. P.5 1988: Fallowfield’s just north of now Sunderland Road, Sandy, all built over now.
6. P.6 1988: Shows houses being built as ‘Station Court’ at Blunham. Now all compromised, no deviation spaces available. Hence our call for a new alignment north of Blunham.







Friday, 1 April 2022

Follow up to concerns about the One Day Paper Travelcard withdrawal and our call to oppose this draconian measure accordingly!

A follow up to show the Government do have a form of power (by legislation) to veto TfL's plan on withdrawing from the Travelcard Agreement as provided by anon third party. 

ERTA are lay people generally but we pass on in the wider public interest and fully support opposition to the withdrawal of this useful One Day Travelcard facility.

The status of Transport for London is treated as a Local Authority and not a Ministerial Department.

TfL's subsidiary for operations is Transport Trading Limited, Company number 03914810.

https://find-and-update.company-information.service.gov.uk/company/03914810

https://tfl.gov.uk/corporate/about-tfl/how-we-work/corporate-governance/subsidiary-companies

Transport Trading Limited is mentioned as the party of the 2018 Travelcard Agreement released by FOI request, with Rail Settlement Plan Limited (Company number 03069042) of Rail Delivery Group.

https://tfl.gov.uk/corporate/transparency/freedom-of-information/foi-request-detail?referenceId=FOI-2203-1819

I've researched the legislation and the Government do have powers to control TfL without changing the legislation in Parliament named Greater London Authority Act 1999 (by stripping the Mayor of London from Transport powers).

Greater London Authority Act 1999
Section 143
Directions by the Secretary of State.


(1) Where the Secretary of State considers that—
(a) the transport strategy (or any part of it) is inconsistent with national policies relating to transport, and
(b) the inconsistency is detrimental to any area outside Greater London, he may direct the Mayor to make such revisions of the transport strategy in order to remove the inconsistency as may be specified in the direction.
(2) Where the Secretary of State gives the Mayor a direction under subsection (1) above, the Mayor shall revise the transport strategy in accordance with the direction.


https://www.legislation.gov.uk/ukpga/1999/29/section/143

Explanatory Note
245. Section 143 gives the Secretary of State a limited power to direct the Mayor to change the transport strategy. The Secretary of State will only be able to use this power where the strategy would be inconsistent with national policy and have an adverse effect outside Greater London. In accordance with section 144, London borough councils, the Common Council and any other statutory body exercising transport functions will be required to have regard to the strategy. The Mayor can issue guidance about the implementation of the strategy to other bodies that must also have regard to it.

https://www.legislation.gov.uk/ukpga/1999/29/notes/division/5/4/1/2

I did check the Mayor of London's Transport Strategy, there's no mention of his proposal on getting TfL to withdraw from the Travelcard Agreement, therefore he has no mandate to do it.

https://tfl.gov.uk/corporate/about-tfl/the-mayors-transport-strategy
https://content.tfl.gov.uk/the-mayors-transport-strategy-update-2020-21-acc.pdf

Greater London Authority Act 1999
Section 157
Restriction on exercise of certain powers except through a company.


(1) The Secretary of State may by order made with the consent of the Treasury provide that Transport for London shall not carry on such activities as are specified in the order except through
(a) a limited liability partnership of which a subsidiary of Transport for London (but not Transport for London) is a member; or
(b) a company which is registered under the Companies Act 2006 and limited by shares or limited by guarantee and which is—
(i) a subsidiary of Transport for London; or
(ii) a company which Transport for London formed, or joined with others in forming, by virtue of section 156(1) above and which does not fall within sub-paragraph (i) above.

(2) The specification of an activity in an order under subsection (1) above shall not—
(a) prevent Transport for London from entering into or carrying out under section 156(2) or (3) above an agreement with a person for the carrying on of that activity by that person; or
(b) affect the validity of such an agreement.

(3) If it appears to the Secretary of State that Transport for London is carrying out, or proposes to carry out, otherwise than in compliance with an order under subsection (1) above any activities specified in such an order—
(a) the Secretary of State may give a direction to Transport for London requiring it to comply with the order within such period as may be specified for the purpose in the order; and
(b) Transport for London shall be under a duty to comply with such a direction.


https://www.legislation.gov.uk/ukpga/1999/29/section/157

Explanatory Note
286. Section 157 enables the Secretary of State by order made with the consent of the Treasury to specify activities which TfL is not to carry on except through a subsidiary or a jointly owned company. By virtue of section 419 TfL itself, but not its subsidiaries, will be exempt from income, corporation and capital gains tax.  By requiring TfL to carry on certain activities only through subsidiaries, an order under this section will have the effect of defining those activities of TfL which will attract liability to tax and those which will not. Further orders could be made in the future to ensure that if the activities concerned are carried on they are carried on through a subsidiary of TfL and are taxable accordingly.

https://www.legislation.gov.uk/ukpga/1999/29/notes/division/5/4/2/1

Greater London Authority Act 1999
Section 164
Control of subsidiaries.


The powers of the Authority and the powers of Transport for London shall be exercised so as to ensure that a subsidiary of Transport for London—
(a) does not do anything which Transport for London has no power to do (including anything which Transport for London has no power to do because the consent of the Secretary of State has not been obtained),
(b) does not do anything which the Mayor has directed Transport for London not to do, and
(c) does not, except with the consent of the Mayor, raise money by the issue of shares or stock to any person other than Transport for London or any other subsidiary of Transport for London.


https://www.legislation.gov.uk/ukpga/1999/29/section/164

Explanatory note
293. Section 164 places the Mayor and TfL under a duty to ensure that the subsidiaries of TfL do not do anything that TfL has not been given power to do by the Act, even though the subsidiary may be acting within the powers conferred by its memorandum and articles.

https://www.legislation.gov.uk/ukpga/1999/29/notes/division/5/4/2/1

The legislation on TfL's status:

Greater London Authority Act 1999
Schedule 10 - Status and capacity
Paragraph 1


(1) Transport for London shall not be regarded as the servant or agent of the Crown or as enjoying any status, immunity or privilege of the Crown.
(2) The members and staff of Transport for London shall not be regarded as civil servants and the property of Transport for London shall not be regarded as property of, or held on behalf of, the Crown.

(3) It shall be within the capacity of Transport for London to do such things and enter into such transactions as are calculated to facilitate, or are conducive or incidental to, the discharge of any of its functions.


https://www.legislation.gov.uk/ukpga/1999/29/schedule/10/crossheading/status-and-capacity

Explanatory note
256. Paragraph 1 of Schedule 10 provides that TfL is not to be regarded as the servant or agent of the Crown or as enjoying any status, immunity or privilege of the Crown and its staff and property are not to be regarded as civil servants or property of the Crown. Thus it will not have the benefit of the rule that a statute does not bind the Crown except by express provision or necessary implication. The powers of TfL will be restricted to powers conferred by the Act and powers incidental to those powers.

https://www.legislation.gov.uk/ukpga/1999/29/notes/division/5/4

Local Government Act 1972
Section 100J
Application to new authorities, Common Council, etc.


(1) Except in this section, and subject as follows, any reference in this Part to a principal council includes a reference to—
(be) Transport for London;


https://www.legislation.gov.uk/ukpga/1972/70/section/100J

Local Government Act 1972

Section 138C

Application of sections 138A and 138B to other authorities

(1) Each of the following is (subject to the limitations set out) to be treated as a local authority for the purposes of sections 138A and 138B—

(a) the London Assembly, but only for the purposes of section 138A;
(b) the Greater London Authority, but only for the purposes of section 138B;
(c) the Mayor's Office for Policing and Crime, but only for the purposes of section 138B;
(d) the London Fire Commissioner but only for the purposes of section 138B;
(e) Transport for London;


https://www.legislation.gov.uk/ukpga/1972/70/section/138C

The Government also have power to take control of local authorities, which could possibly include TfL because of their status.

House of Commons Library:
Intervention in local government


Intervention: the legal position

The legal power for the Government to intervene in the running of a local authority is broad and flexible, permitting the takeover of any local functions by the Secretary of State or appointees.  Intervention takes place under section 15 (6) of the Local Government Act 1999.

Each intervention begins with a formal direction notice.  Typically powers are returned to the local authority after a period of years, although they may not all be returned at once.  Some interventions have been preceded by reports based on ‘best value’ inspections, though this is not a legal requirement for an intervention to take place.


https://commonslibrary.parliament.uk/intervention-in-local-government/

Local Government Act 1999
Section 15
Secretary of State’s powers.


(6) Where this section applies in relation to an authority the Secretary of State may direct—
(a) that a specified function of the authority shall be exercised by the Secretary of State or a person nominated by him for a period specified in the direction or for so long as the Secretary of State considers appropriate, and
(b) that the authority shall comply with any instructions of the Secretary of State or his nominee in relation to the exercise of that function and shall provide such assistance as the Secretary of State or his nominee may require for the purpose of exercising the function.


https://www.legislation.gov.uk/ukpga/1999/27/section/15

Explanatory note
45. Section 15 offers the Secretary of State a wide range of intervention powers in response to failures. These include some which are of a procedural nature, and others which involve more substantive action either on the part of the authority (where, for example, it might be required to externalise a function), or on the part of the Secretary of State (who might, in extreme cases of failure, intervene to exercise a function of the authority himself or through a nominee). In any case, where the Secretary of State intends to take action against an authority based upon recommendations of inspectors, he will normally be required to allow the relevant authority to make representations both about the recommendation itself, and the action which is proposed in respect of it.

https://www.legislation.gov.uk/ukpga/1999/27/notes/division/5/1/4

These are the legislations to show the Government do have some form of power to veto TfL's proposal because their status is classified as a local authority.

I've also found a legislation (Section 42 of Enterprise Act 2002) where the Secretary of State can intervene a company (i.e. Transport Trading Limited) in certain public interest cases.

https://www.legislation.gov.uk/ukpga/2002/40/section/42

Explanatory note for Section 42 of Enterprise Act 2002:

Intervention by Secretary of State in certain public interest cases

151. This section allows the Secretary of State to intervene in the consideration of a case by serving an intervention notice where she believes it raises a public interest consideration that needs to be taken into account.

152. Subsection (2) allows the Secretary of State to serve an intervention notice in a case that she thinks might raise one or more public interest considerations, and subsection (4) provides that only one intervention notice may be served in any case. Subsection (3) limits the considerations that she may raise in this way to those specified in section 58 or those that the Secretary of State thinks should be so specified. Subsection (7) has the effect that, in the latter case, the Secretary of State must bring forward an order specifying the consideration in legislation and seeking Parliament's approval of it (‘finalise’ the consideration) as early as practicable.

153. Subsection (1) sets out the conditions to be met before an intervention notice can be served. A key condition is that the notice cannot be served if a reference decision has already been taken by OFT.


https://www.legislation.gov.uk/ukpga/2002/40/notes/division/4/3/1/2/1/1

I do mention the DfT persuaded TfL to appoint two DfT special representatives to TfL as part of their financial settlement.

Transport for London Settlement Letter

Governance
48. A Financial Sustainability Group will meet in May 2022 to support and assess TfL’s progress towards becoming financially sustainable by April 2023. It will be chaired by DfT’s portfolio Minister and will be attended by the Deputy Mayor for Transport of London, HMG’s Special Representatives (see paragraph 49) and Senior Officials at DfT, HMT, No.10 and TfL. The aim of the group is to ensure that TfL reaches financial sustainability by April 2023. To inform these meetings, TfL will provide to DfT 15 working days prior to the meeting, a detailed report on their progress towards reaching financial sustainability, including progress on demand and passenger revenue, deal conditions and risks.

49. Two HMG appointed Special Representatives (one strategic appointee and one technical appointee) will continue to attend all TfL Board meetings, being able to raise questions at the Board, request additional information as reasonably required and report back to the Secretary of State on these matters.

50. The Technical Special Representative will also continue to attend all meetings of the Finance Committee and the Programmes and Investment Committee, to work closely with TfL to support its progress towards financial sustainability. All relevant papers will be shared by TfL with the Special Representatives as well as a nominated contact in DfT in advance of each Board meeting.


https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1057532/TfL-extraordinary-funding-and-financing-settlement-letter-25-February-2022.pdf

For liaison, please feel free to send to richard.erta@gmail.com 

Thank you to all who help in any way.

Railfuture is also swinging into action/make common cause: https://www.railfuture.org.uk/article1890-The-Travelcard-Add-on-A-case-for-retention

Wednesday, 30 March 2022

ERTA Northern Area Rep articles for wider interest

 All Things Yorkshire!

Our Member Mr Chris Hyomes, gives us the load-down on all he’s been doing for rail causes in ‘God’s Own Country’!

 

Queensbury Tunnel - 2021 Round up

 

It's been another tumultuous year.

 

National Highways spent £2.8M erecting a plug below No.3 Shaft, rather than agreeing to the dewatering arrangement offered by the landowner which would have allowed RamArch/sprayed concrete strengthening to be installed at a fraction of the cost. The rent on the pumping station has still not been paid almost six years after the first instalment became due.

 

The work at No.3 Shaft was probably the most expensive and high-risk single project ever undertaken by the Historical Railways Estate, yet no formal progress reports were produced and practically no emails exchanged about it amongst their team. They have adopted a scorched-earth approach to record-keeping, demonstrating again just how disreputable the company is.

 

National Highways' technical report into options for reuse of the tunnel - no doubt contrived to blow repair out of the water - and Sustrans' draft study into the benefits of a cycle network connecting Bradford/Keighley to Halifax via the tunnel are being reviewed by Bradford Council.

 

"We are now starting work on understanding the inter-relationship between the technical report into the tunnel repair and the economic assessment by Sustrans in order that a holistic picture of the initial costs and benefits of a cycleway through the tunnel can be fully understood, as well as the on-going liabilities which could arise", says the Council.

 

There are pots of Government money for levelling-up and transforming cities which could provide funding for a cycle path through the tunnel. A route from Bradford city centre to Thornton - providing access to the existing Great Northern Railway Trail - is going ahead and Calderdale Council is looking to develop an active travel scheme from Halifax to Trinity Academy at Holmfield. A two-mile link through Queensbury Tunnel would connect these emerging networks either side of the hill.

 

The planning application for the tunnel's partial infilling still sits dormant on Bradford Council's planning portal; the objections currently stand at 7,772 - a huge number. With £7.8M of taxpayers' money frittered away on work that mostly wasn't necessary and serious reputational damage incurred as a result of its incompetence over the unpaid rent, we suspect National Highways will not be keen to return any time soon, but they are nothing if not full of surprises.

 

We'll let you know when there are developments to report. In the meantime, have a fabulous Christmas - as best as you can in the prevailing circumstances - and let's hope for a much better 2022.

Queensbury Tunnel extends for 1.4 miles beneath a ridge in the Pennine foothills of West Yorkshire. Halifax lies at its south end (2.5 miles), whilst Keighley is located to the north (7 miles) and Bradford to the east (4 miles).

The tunnel could help to establish a strategically important link within the emerging network of shared paths across the region, allowing a connecting route to be formed between the Aire and Calder valleys where paths are already under development, as well as a link into Bradford. The existing Great Northern Railway Trail would form part of that route. 

Minsters Rail Campaign

Reinstating the Beverley to York line

Hull and Beverley are linked with Market Weighton, Pocklington, Stamford Bridge and York by the increasingly congested A1079. The Minsters Rail Campaign believes that the former 32-mile Beverley to York “Minsters” rail line (closed in 1965), which branched off the existing Hull-Scarborough line at Beverley and served these places, should be reinstated. This will contribute substantially to the long-term economic and social future of the East Riding, improving public transport, reducing car dependency and encouraging sustainable development. It will also be an alternative link from Hull and the East Riding to the rest of the rail network, needed because the existing rail infrastructure serving Hull lacks resilience. Regionally, the line will contribute to the Government’s “Northern Powerhouse” initiative, improving east-west connectivity between East and North Yorkshire.

 

Following their successful bid to the Restoring Your Railways Fund earlier in the year, The Minsters Rail Campaign are working towards a Strategic Outline Business Case for submission to the Department of Transport in February 2022.  Assistance is being given by infrastructure consultants Aecom and the East Riding of Yorkshire Council in compiling the case for reinstatement, with cross-party support from Members of Parliament in York and Hull. The Campaign is confident that the line will meet all the criteria required for reinstatement and the benefits for the region will be significant and far-ranging. 

  

SELRAP (Skipton-East Lancashire Rail Action Partnership)

Update on the Current Situation with Our Campaign

 

The Airedale line is a modern and fast train service running from Leeds and terminating at Skipton.

SELRAP's proposal is to extend this by reopening the closed railway line from Skipton to Colne, this will allow passengers from East Lancashire to travel directly into Leeds in less than 60 minutes.

This proposal is supported by Arriva Northern Trains and Skipton Building Society, who both recognise that it will open up employment, educational and leisure opportunities throughout Lancashire and Yorkshire.

It also allows the possibility of a direct link to Manchester airport from points from Shipley to Skipton.

 

The aim at present is to progress the project which is within the ‘Develop’ phase of the Rail Network Enhancement Pipeline (RNEP).

A critical engineering study was endorsed by DfT ministers 6 months ago but has apparently being ‘blocked’ from going ahead on the grounds that the Skipton to Colne rail reopening proposals are now deemed to be too expensive. They have done this without the evidence to back it up.

This assumption has been made in advance of this critical engineering study that would have determined on the ground the practicalities for the scheme and its final cost to be built.

SELRAP are contacting local MPs, the rail and transport ministers plus other supporters to try to get this study carried out.

The reopening of this line is essential in helping to ‘level up’ East Lancashire which has some of the most deprived communities in the UK. It would bring social and economic regenerative benefits to them.

Boris Johnson himself stated that ‘we’re going to unite and level up across the country’ whilst also talking about ‘building back better’!

Please visit our website for further information www.selrap.org.uk

You can also view there a promotional video made last year about the benefits of reopening the line. For any further information, questions or comments, please send to chris.hyomes@hotmail.co.uk

ED. We thank Mr Chris Hyomes for these articles and very much hope we will have more news from ‘up north’ in coming editions of our newsletter. Suffice to say “Woodhead… bring-it-on!!


To make common cause, enquiries or give support, please contact ERTA Northern/Yorkshire Area Rep:

Mr Chris Hyomes
10 Tythe Barn Road, Knottingley, West Yorkshire, WF11 9BU
T. 07971766207

Tuesday, 29 March 2022

ERTA Dates, Times and Meetings 2022

These are goals we have, but are subject to revision. Please check with us in any case or join our free email loop: richard.erta@gmail.com

2022 Programme

ERTA Stall at Bedford Antiques & Collectables Fair – Saturday 2nd April 10am – 3:30pm
St. Paul’s Church, St. Paul’s Square, Bedford MK40 1SQ
Admission £1.50

Please visit the ERTA stall and show your support. Thank you.

Aylesbury Forum: Saturday 9th April 2022, 1pm food, 2-4pm business
The Bell, 40 Market Square, Aylesbury, Bucks. HP20 1TX T. 01296-388080
https://www.jdwetherspoon.com/pubs/all-pubs/england/buckinghamshire/the-bell
Agenda: 
Agenda for Aylesbury Forum 09-04-22

ERTA Ampthill and Flitwick Forum: Saturday 30 April 2022, 1pm food, 2-4pm business
The Swan Pub, 1 Dunstable Road, Bedford MK45 1HP
T: 01525 754777 E: steph@theswanflitwick.co.uk
It is adjacent to the Thameslink served railway station and with ample parking and bus links too.
https://www.swaninnflitwick.co.uk/menus/
 Agenda: 
Agenda for Ampthill Flitwick Forum 30-04-22
Station example: 
Click Here

ERTA Stall at Bedford Antiques & Collectables Fair – Saturday 7th May 10am – 3:30pm
St. Paul’s Church, St. Paul’s Square, Bedford MK40 1SQ
Admission £1.50

Please visit the ERTA stall and show your support. Thank you.

Leicester Forum – Saturday 14th May 2pm food, 3pm-5pm business

The High Cross,103-105 High Street, Leicester, LE1 4JB T. 0116-251-9218
https://www.jdwetherspoon.com/pubs/all-pubs/england/leicestershire/the-high-cross-leicester
Enquiries and expressions of interest via E. richard.erta@gmail.com
NOTE: Table bookings are not taken. We tend to sit towards the back area or out in the rear courtyard if weather clement and venue busy. Let us know if you are coming beforehand.

ERTA Stall at Bedford Antiques & Collectables Fair – Saturday 4 June 10am – 3:30pm
St. Paul’s Church, St. Paul’s Square, Bedford MK40 1SQ
Admission £1.50

Please visit the ERTA stall and show your support. Thank you.

Bedford Forum – Thursday 16 June 2022 1pm food, 2-4pm business

Pilgrim’s Progress, 42 Midland Road, Bedford, Beds.MK40 1QB

https://www.jdwetherspoon.com/pubs/all-pubs/england/bedfordshire/the-pilgrims-progress-bedford

ERTA Stall at Bedford Antiques & Collectables Fair – Saturday 2 July 10am – 3:30pm
St. Paul’s Church, St. Paul’s Square, Bedford MK40 1SQ
Admission £1.50

Please visit the ERTA stall and show your support. Thank you.

·                    We welcome offers of support, assistance and ‘light touch’ volunteering.

·                    Please make yourself known to us, join ERTA and find your niche/new calling!

Rugby Forum – Saturday 9 July 2pm food, 3pm -5pm business

Rupert Brooke, 8-10 Castle Street, Rugby, Warks. CV21 2TP

https://www.jdwetherspoon.com/pubs/all-pubs/england/warwickshire/rupert-brooke-rugby

London Forum – Saturday 13 August 2pm food, 3pm-pm business

Barrel Vault, Unit 23, St Pancras International Station, Pancras Road, London N1C 4QP.

https://www.jdwetherspoon.com/pubs/all-pubs/england/london/the-barrel-vault-st-pancras

NOTE: Table bookings are not taken

Berkhamsted Meeting – Saturday 24 September 12pm food, 2-3pm Members Meeting, 3pm - 5pm Public Meeting with Speakers. Venue https://www.stpetersberkhamsted.org.uk/heritage/court-house/ St Peters Court House, St Peter's Great Berkhamsted, Church Lane, BERKHAMSTED, Hertfordshire, HP4 2AX

https://www.stpetersberkhamsted.org.uk/about/courthouse/

Lunch at Wetherspoons the Crown, 145 High Street, Berkhamsted, Herts. HP4 3HH

https://www.jdwetherspoon.com/pubs/all-pubs/england/hertfordshire/ the-crown-berkhamsted

Station Stalls and leafleting helpers wanted! 2022

Email Simon Barber for details and offers to assist: simon4barber@gmail.com

Notes for Physical Meetings:
1. Subject to verification. Venues may change or be cancelled at short notice. Stay in touch.
2. People attend at their own risk. Everyone pays for their own food and drink.
3. There is a pre-pared agenda, please help focus on the pertinent issues

Main contact and convenor: Mr Simon Barber, 20 Fitzherbert House, Kingsmead, Richmond, Surrey, TW10 6HT T. 0208 940 4399, E. simon4barber@gmail.com

Monday, 28 March 2022

Horsham Public Meeting News and Notes 26-03-2022




Horsham Public Meeting 26-03-2020 – notes by Richard Pill

Some 17 people attended the ERTA tabled Public Meeting on Saturday 26th March at the Unitarian Hall in Horsham adjacent to the central bus station. Colin Crawford chaired the meeting, whilst the Enticotts did refreshments and Richard Pill manned the book stall.

In what was a ‘not know who will come’ we were pleased to find those who came were of a congenial nature. The one cyclist who turned up was one of our speakers, Mr George Bathurst on the Windsor link. Engineering work on the railways had delayed some trying to get to the meeting, whilst others were more local.

Colin opened the meeting and gave an overview of the canal threat to the old trackbed between part of the former Guildford-Horsham railway and it may still come to an appeal. It stands however thrown out on a technical issue making the presiding council having to re-issue consultation and consider wider opinion. A point is that the canal has other routing options, the railway is not so lucky and needs the corridor of the former track-bed to go on with a broadening to accommodate a fenced off cycle-way and foot-way alongside, hence the idea of a ‘green corridor’.

ERTA supports the concept idea of the railway, in modern transit form, being reinstated as a local link. Rail links are connected to a wider rail network and integrally can carry local and wider regional people and goods off local and regional roads like no other comparable transport mode can, cutting emissions, parking issues and other negative pressures too much traffic on roads can bring.

The way ahead is technically fairly mapped out:

1. Get councils and MPs to support the idea and they in turn are better placed and connected to court potential sponsors and funding to commission studies beit business cases, engineering considerations, deviations or relocations where blockages exist and incrementally, starting maybe with Guildford Horsham as Phase 1 via Cranleigh and Phase 2 both the Arundel Curve and Horsham – Shoreham being implemented. This would allow Reading – Brighton direct and as well as Heathrow-Gatwick via Three Bridges.

2. Once formal studies are done and show ‘can/what’ can be done, then to turn to Government for support, more funding and ultimately go-ahead for delivery.

3. All ERTA can aspire to do is court support including from the public and encourage people to join ERTA, build a group and they in turn take on to involve and make representation to MP’s and Councils – who gets there first wins!

4. On timings, at one extreme East-West Rail between Oxford-Bedford-Cambridge has taken 35 years and still is not fully delivered, whereas others like the Borders Railway which has been successful as has other rail links like Ebbw Vale in Wales, been delivered relatively quicker. Many variables and politics can all play a part, as can public pressure and determination for a local rail alternative solution to current trends.

Questions and comments were on land use, state of local roads and the need for a through rail route to optimise usefulness. Previous studies were largely confined to a terminal branch between Guildford and Cranleigh, not Horsham, on that basis Surrey County Council have declared they do not support the rail scheme as no case. Cranleigh needs careful studying to see how sensitively a railway can be implemented either with a deviation and relocation mixture or a new bypass to the west and a new station in the vicinity. The gains of the railway would, on and off the tracks, prove its worth to local areas and wider ends socially, economically and environmentally. Given growth, given trends of local traffic, travel, congestion and much more, the rail link is a vital resource going forward, but this needs to be better appreciated at the heart of the political system, MP’s, Councils and Government. The model and dynamic involve could be repeated elsewhere nationwide.

The blocking of the route like at Southwater/Steyning and elsewhere has to be balanced going forward with growing population and no public transport infrastructure able to modal shift people and/or goods by rail in critical corridors like Guildford-Horsham-Shoreham (Reading-South Coast direct and vice versa/not via London) is. It was noted the Brighton Main Line is reaching capacity and needs a relief line beit both Guildford-Horsham-Shoreham and some reinterpretation of a Lewes-Uckfield-Tunbridge Wells missing link as well, one on the eastern flank and our line, taking the western approaches. Brighton arguably the centre of both and radials thereof. Currently the gaps and legacy of closures remains damage done and needs rectifying. The needs have increased, not diminished and so on the social, economic and environmental fronts, personal, collective and structural, these gaps need re-railing.

Mr George Bathurst gave his talk next on what was needed to plug a 300-metre gap between the Slough-Windsor rail link and that of Staines-Waterside Station. There’s been protracted highs and lows promoting the scheme. The backers set out to build the case and play by the system. However, the system seems to be cynical of rail and puts more conditions, costs and seeming blockage each time, one ticks a box. The scheme reached GRIP Level 2 out of an 8 step Network Rail ladder. The scheme takes on a 3-sided motorway cordon hedged in by M4, M25 and M3 and a population like Slough, which has grown from 30, 000 in 1980 to 200, 000 today and elsewhere similar trends means we need to use land carefully and rail generally takes less land pro rata of what it carries than trunk or motorway-style roads building does. The Windsor link makes a lot of sense and would better serve a top tourist centre and magnet and foster the town's well-being from a number of considerations.

The meeting finished at 16.00 hours and was congenial. We hope to repeat in the Autumn to continue to build and gather support for the rail link’s return! Join us.

Be on our loop/requests to richard.erta@gmail.com





Media coverage: We are only as good as our membership informs. Please consider joining ERTA and strengethen us to do more and better x nationwide. Enquiries to richard.erta@gmail.com https://www.sussexexpress.co.uk/news/people/new-plans-in-bid-to-reopen-disused-rail-links-at-guildford-horsham-and-shoreham-3634719