Help Save Don Valley and Woodhead rail reopening options


#ertarail The English Regional Transport Association (ERTA) is a nationwide membership based association independent of management or unions. We are committed to seeking local, conventional rail links restored and improved across the English Regions including and mainly reopenings, rebuilds and select new builds. 

In the north, we wish to see the following lines rebuilt: Keswick, Colne-Skipton, York-Beverley, Harrogate-Ripon-Northallerton, Matlock-Buxton/Chinley and finally the Woodhead line.

We are concerned that as population rises and (in normal times) traffic and development inform more of each other, we need to embrace that these select rail links could find a new role in today's society and going forwards. 

The past is one thing, but you cannot live on just nostalgia nor scenery. The railways help to reduce road traffic, cut congestion, save precious land and beauty spots from being overrun by endless demands for land for parking, when there's a need for that same land to be used for other things beit employment, housing, landscape or conservation. 

I appeal to your support especially reopening the Woodhead line:
1. It would take on the following roads A628 direct, M62, M1, A629, A6018. 
2. It would give more rail capacity between Sheffield and Manchester
3. It could handle freight and passenger demand
4. It could have a new tunnel and realignments where necessary or expedient.
5. It would feed and be fed by other local and regional rail links enabling more by rail overall.
6. It is not just a local consideration, but part of a land bridge between Europe/North Sea/Hull and the North East to Liverpool/North west/Atlantic and America potentially, ship to rail and vice versa. 
7. Rail is the best way to conserve the best of our National Parks in a sustainable fashion, checking volumes, cutting pollution and informing footfall and spending minus the traffic.

We are concerned about HS3 and High Speed generally, being expensive, serving mainly passenger only, wide gaps between principal stations, leaves all in between to whatever rail exists or default road more. We believe that lines like Woodhead need:
1. Protection from further erosion/intrusion/keeping open for potential re-railing
2. Please round table and apply to the Government's Rail Study Fund for informing a pot to commission a study to evaluate it, compare it and see what is to be gained on and off the rails.
3. We believe in a mindset which seeks to overcome the problems of reopening this rail link, and looks at the wider gains and the throw-away of an asset which stood for many decades and survived Beeching only to be axed under the Serpell Closures of the early 1980's. There was no democracy about the closures, they were implemented often against local people's wishes by stealth and the result is we are poorer and less equipped now in a time and situation whereby we need these strategic rail links and the benefits they afford.

When unlock is lifted and things get back to some sort of normal, we hope to table forums and meetings to bring people together. Meanwhile we urge councils to talk together, work together and put this rail link at the centre of revival and regeneration plans please. 

It is an investment in ourselves. Thank you.

Yours sincerely,


Richard Pill
ERTA Chairman

MAKE YOUR VIEWS KNOWN NOW AND STOP A THREAT TO WOODHEAD RAIL ROUTE EVER RE-OPENING DEADLINE FOR COMMENTS 25 MAY
Below see Don Valley Railway’s objection to plans to mlayhigh voltage cables along the potential route of a re-instatement proposal East of Dunford Bridge…
-------------------------
I write as chair of Don Valley Railway. We are a campaign group seeking to reopen to the currently freight-only railway line to passenger traffic between Sheffield and Stocksbridge. This section forms part of the former Great Central Woodhead Rail Route, similar to the section of the Transpennine Trail proposed for undergrounding cables as part of this application.
Many of our supporters feel strongly that Woodhead Railway linking Sheffield and Manchester should not have been closed and that it should be preserved for reinstatement at some stage. In addition, should the Woodhead Rail route be re-opened this will make this will either achieve Don Valley Railway’s objectives or at least make them far easier to achieve, therefore we do not wish to see anything get in the way of this occurring.
In my former capacity working for the Peak Park Transport Forum, BMBC representatives informed me that after closure, their purchase of the route was for the express purpose of preserving it for rail reinstatement.
More lately Sheffield City Region’s transport strategy states that the Hope Valley Line should be used to link the two City Regions, however if this is not possible, that other options should be considered – the only other existing option possible, without considerable infrastructure work, being along this, the Woodhead Route.
In 2013 ahead of cables transferring from the Victorian Woodhead Tunnels to the 1954 built replacement tunnel, a study was undertaken by the Government body that existed at the time, Northern Way. This went into details as to the consideration of how far if at all those plans would compromise the ability to reinstate the Woodhead route as a rail Route.
This study went into detail as to how the tunnels could be used in future for rail and came to the conclusion that it was still possible to develop transport options along the route along side the undergrounding of cables.
For this application a short note has been presented to establish if these works would similarly impact on any future aspiration to reinstate the Woodhead Railway, as speculatively suggested in Sheffield City Region’s Transport strategy.
Within this it claims that… “The Northern Powerhouse Rail Director explained in The Sheffield Star on 4 January 2020, that the Woodhead route has already been looked at and discounted because re-opening it would cost too much; and that Transport for the North is focused on the Hope Valley line for improvements to journey times between Sheffield and Manchester…”
In this regard it is noted that a lack of certainty or scale exists with regards to the City Region aims to improve rail and transport links between Sheffield and Manchester City Regions. Currently a plan for a £30m upgrade of the South Transpennine corridor (Hope Valley Line) which is struggling to be implemented is the sum total of this. For Sheffield City Region to gain the necessary connectivity to flourish it is our view that these are out of scale with aspirations to improve transport links between other city regions.
In comparison with Manchester-Leeds City Region links plans for a £3billlion upgrade of the North Transpennine corridor services are under development, not to mention Northern Powerhouse Rail’s aspirations for a high speed line between Leeds and Manchester via Bradford. It is also worth noting a similar gulf exists between the quality of alternative transport facilities (road) between the corridors; compare the M62 with the A628.
Don Valley Railway would argue that if the Northern Powerhouse Rail Director Quoted’s views are as expressed in this document, they should be discounted as in comparison with other parts of The North of England they do not place an acceptable level of weight on the importance of Sheffield to Manchester City Region links to this part of the North of England and rather than aiding its economic rebalancing are acting against it.
It should be noted also that at the moment there are opportunities to develop large rail schemes. On announcing the go-ahead on HS2 Phase 1 and 2a to Birmingham and Crewe Boris Johnson stated that with regards to the remaining sections to Leeds and Manchester that these will be redeveloped to better fit within Northern Powerhouse Rail aspirations; i.e. better links into northern cities and towns. With this re-visitation, revised plans for rail could be progressed, and this section of former line may make a vital contribution to that process.
To demonstrate that this development does not have consequences that could have negative impacts on the environment and local economies in South Yorkshire and East Manchester, it is assumed that if a proposal comes forward to re-open the line that the public purse should pick up a bill of £35million at current prices. Stating that this will be an insignificant amount if part of the cost of a rail reopening scheme. Please note that this amount is larger than the total current budget allocated to improve the South Transpennine links. With regard to OfGem’s requirement of National Grid to ensure it operates in the interest of its shareholders, it would be preferred if a condition is put in place to ensure that National Grid shareholders pick up this additional cost in the future (rather than taxpayers) should a proposal come forward. In addition, we would require that that amount of money is not included in costs in any Cost-Benefit appraisal analysis of a future scheme.
There is also the matter that the £35,000,000 price tag is almost certain to be much higher as having removed pylons it is unlikely that the Peak District National Park authority would sanction their re-instatement should this occur. Installing new lines via another underground route will be more expensive. For example the £50million scheme to install cables through the Woodhead Tunnel would have cost only £18million if via Pylons. So what they are proposing puts a financial risk on to the public purse in excess of £100,000,000.
Alternatively a plan demonstrating that a rail alignment is retained along the trail, and/or, information detailing that if installed compromising such a route that it is economic and feasible to move the facility at reasonable cost. Ideally this should establish a route alignment to be preserved.
Don Valley Railway object to these proposals and will not withdraw our objection until a workable plan to ensure that the rail alignment is preserved is produced.

Posted 27-05-2020

SUCCESS OF THE BARROW HILL LINE BID IS A MAJOR BREAKTHROUGH FOR DON VALLEY RAILWAY

Despite not being one of the 10 lines selected for the first tranche of the Restoring Your Railway Fund, Sheffield City Region’s successful bid to reinstate scheduled passenger services on Barrow Hill Line between Sheffield and Chesterfield appears to be something of a catalyst to a revised bid for the Don Valley Railway.

The Barrow Hill bid is a first step towards investing in rail in the Sheffield City Region. Despite not being selected ourselves, Miriam Cates MP, Sheffield City Region and Don Valley Railway have been invited to talks with the Department for Transport (DfT) to undertake further work on a revised proposal, probably to be submitted in November.

Sheffield City Region have noted synergies between Don Valley Railway and the Barrow Hill Line bid.

Additional Barrow Hill services will approach Sheffield Midland from the direction of Darnall and would add to demand for paths through Nunnery Main Line and the station’s northern approach. This area is already operating at or near capacity. However for additional capacity to serve Sheffield City Centre avoiding this congestion point the former Sheffield Victoria Station may have a part to play. With Don Valley Railway plans accessing Victoria from the west it would be interesting to see how this issue is addressed.

In addition, work is going to be necessary to improve the southern approach to Sheffield Midland as part of HS2 with many services may diverted via the Barrow Hill route to enter Sheffield from the congested northern end. The last time that occurred, when Bradway Tunnel was refurbished, the number of trains entering Sheffield had to be cut because it was not physically possible to get them all into the station from the north. However, sending some services into Victoria may go some way to addressing this issue.

Don Valley Railway have always considered that Victoria offers a cost-effective means of adding to station capacity in central Sheffield.

So Don Valley Railway remain optimistic about the future development of the line.

Thursday, 14 May 2020

We need a national government initiative to save old trackbeds and deviation spaces with carrot and stick

Much talk and reports abound on the need for a better environment and discourses reach and range around it. However it is a fact (1) that exhaust from cars and other fossil fuel reliant transport - particularly road and aviation has contributed to ill-health and pollution. That pollution exacerbates any other ailment and erodes the robustness of the population alongside any deprivation elements which lock-in the divides between haves and have nots. 

The closures of the 1960's went too far and left glaring gaps in the rail network - the very alternative we need now to rebalanced public transport away from locked-in roads dependency to more people and goods going by rail. 

HS2 won't cater for freight and the default argument of it will create capacity elsewhere relies on whether it goes where the demand and flow and existing rails go or not. 

For example Southampton/Bristol to Leicester/East Midlands triangulation is problematic as you either need to go via Birmingham or London and they are at capacity already and have few orbital rail links to avoid busy central locations and passenger centric hubs. A new build Great Central from Calvert with a spur off the Oxford line could link direct to the Nuneaton-Leicester existing line for access directly not via Birmingham and London and enable new flows of passenger and freight services off existing rails.

This is but one example, another is there is no east-west rail link for 100 miles north of the North London Line to the Peterborough-Leicester-Nuneaton line. That means all traffic must go by road largely informing manipulated demand for road widening costing £billions like A421/A14/A45/A43 arteries for example and these congest around urban hubs which lack the capacity to cater for the volume demand and congestion is the result. Northampton, Milton Keynes, Bedford and Cambridge are examples as well as junctions where these roads intercept A1 like Black Cat Roundabout and M1 for example.

Choice in rail restoration terms is needed. We need Government to also implement a rail route protection arm which incentives protection of former routes to keep reopening/rebuild options alive as a contingency but also sanctions against where piecemeal planning policies throw caution to the wind, block critical routes/access and then lock-in a roads only future with all the impacts that informs including wars for oil (2), costs, health issues and mayhem generally.

The English Regional Transport Association is committed to raising these important national issues and would welcome your support to press the Government to act now in a timely manner in the wider interest please. You can find examples and more information on both of our Blogspot (scroll down) https://ertarailvolunteer.blogspot.com/ and our publicity page of our website: https://www.ertarail.com/publicity-page Please have a perusal and feel free to recommend our work to others to help us save the day on a curtain coming down amidst a lack of coherent leadership and direction in these matters and a positive will to ensure reasonable delivery and timescale can be done which reflects the need to avoid irreversible climate change impacts and inform modal shift from car, van, lorry, plane, oil dependency/fossil fuels towards re-railing, choice, balance and more off roads and back on rails, saving costs and lives as a result. Thank you.

Notes:

I attach our latest newsletter for further information. Suffice to say lines like Woodhead, Peak Rail, Keswick, York-Beverley, Harrogate-Ripon-Northallerton, Exeter-Okehampton-Tavistock-Plymouth, North Devon lines to Ilfracombe and Bideford, Guildford-Horsham-Shoreham, Bedford-Northampton, Northampton-Market Harborough and numerous others need yes, funding for studies to make the case, but alongside route protection and deviation lands also where like places Cranleigh, blockages have arisen and a deviation is required. Please help us and ensure that options are kept open, otherwise we lose them and wonder why people get disillusioned when much talk and many reports, end in expensive paper chases whilst lines 'ready to go' like Bristol-Portished remain to be given sanction for reopening. One suggestion has been, if cash is the issue besides politics, of tolling motorways and trunk roads £1 per vehicle every 15 miles across the regions and using that pot for better public transport. Another is to enable local councils to keep any Controlled Parking Zone (CPZ) money (former traffic warden roles) and be directed to ring fence it by Government to protect routes. Bedford St Johns old site and corridor down to Cardington Road for an east-west rail contingency and Brackmills-Northampton on former Bedford-Northampton route are cases in point and across the regions, other examples exist whereby if you junk the urban access, you scupper the whole railway restoration scheme. Our lists are not exhaustive, but about 500 schemes of approximately 10-20 miles of rebuild is what is required with each region getting a fair share. Otherwise modal shift is not going to happen in anything like the scale we need. It reduces things to mere talk and people daily experience 'other laws at work' making them disillusioned. You can help inform more objective hope.




Support rebuilding a Great Central Corridor - Calvert-Rugby-Narborough

Our proposal is a rebuild of Great Central corridor / re-railing from Calvert - Narborough with a new link into Rugby.

Such a link would enable direct rail access from Southampton/Bristol-Leicester/East Midlands and vice versa in scope for passenger and freight. It avoids Birmingham and London, freeing up capacity/enabling rail greater market share and efficiency. It could also cater for a re-railed corridor and local links including commuting to Aylesbury/OOC and London via Chiltern Lines and put places like Brackley/A43 corridor/Silverstone a 10 minute bus interceptor to rail access as well as Bicester/Oxford-Rugby or Leicester or even Burton and beyond. The new link to Rugby would diverge south of Willoughby and link at a new junction between Northampton Loop and WCML Main Lines. Whether a north of Rugby - new GC alignment near M1 could be done with realignments where blockages exist remains, as per elsewhere matters for professional studies. We want buy-in to the idea and principle and especially local councils/quangos like English Economic Heartlands (EEH) and East Midlands Connect for example, who could in turn take to a next stage and court wider support/GRIP NR for example. We (in normal times) table forums to bring people together and aim to recruit people to in turn get them to campaign for the above objectives. New stations at Barby and Willoughby, Woodford Halse and Brackley desireable as per Calvert. New chord onto the Oxford line (part of east-west rail). We envisage a widening of the corridor between Calvert and Brackley with domestic (our) lines running alongside an HS2 concept and diverging north of Brackley - HS2 to north west, us due north. Lutterworth is where the A14, M1 and M6 converge and so plenty of opportunity by re-railing to engage with those markets for traffic to rail. 
If you can help and include us and help up our game, please do and encourage others. Enquiries welcome. Please contact Mr Simon Barber in the first instance: T. 0208 940 4399, E. simon4barber@gmail.com




Monday, 4 May 2020

Reopen the Gloucester-Ross-on-Wye-Hereford Rail Link

The closures coincided with gradual upgrades of roads and the result is congestion locked-in on a grand scale with land use for parking not being available for much needed housing or employment for example. Pollution and the world crisis on environmental issues abounds with few cures in sight.

We say ‘think global, act local’! Rebuilding a new Gloucester-Hereford rail link would enable Reading-Shrewsbury and beyond each end ‘not via Oxford/Birmingham’ giving freight and passengers and orbital option via some of the loveliest countryside in England, wedged between the Cotswolds and the Forest of Dean.

It would serve an immediate catchment of about a quarter of a million people as well as re-rail the jewel in the crown ‘Ross-on-Wye’ (population 10, 000 approx.) but a 3-5 miles either side of the rail corridor comes to approximately a quarter of a million people plus through use and switch from other modes given choice for example.

Please give your support by joining ERTA and join our Forums (when un-lock resumes) and get involved. Yes some blockages exist, but sensible planning and craft can overcome, realign, relocate or negotiate a way through surely, for the greater gains including sustainable development.

Visit the ERTA website https://www.ertarail.com/become-a-member and join or email to join our newsletter email loop via richard.erta@gmail.com The sky should be the limit, re-railing should be the norm.
Help make it so!

Technical stuff and drawing maps using digital technology/software is not my forte. However, if you think you could do a better job, please don't be critical or impatient but offer as a volunteer to help us and do better please. Email: Mr Simon Barber T. 0208 940 4399, E. simon4barber@gmail.com



Dossier for Gloucester-Ross-on-Wye-Hereford Rail Link – by Richard Pill May 2020

Key Factors
Associated Considerations
Introduction
English Regional Transport Association (ERTA)
What and Where
Aims and Objectives
Why and Where
Scope and Benefits
How and When
What needs to be done


The English Regional Transport Association (ERTA) sees a rolling programme of line rebuilds, reopenings and select new builds of conventional ‘local’ railways as a key element to give choices for people and goods across the English Regions and beyond.

The closures coincided with gradual upgrades of roads and the result is congestion locked-in on a grand scale with land use for parking not being available for much needed housing or employment for example. Pollution and the world crisis on environmental issues abounds with few cures in sight.

We say ‘think global, act local’! Rebuilding a new Gloucester-Hereford rail link would enable Reading-Shrewsbury and beyond each end ‘not via Oxford/Birmingham’ giving freight and passengers and orbital option via some of the loveliest countryside in England, wedged between the Cotswolds and the Forest of Dean.

It would serve an immediate as well as re-rail the jewel in the crown ‘Ross-on-Wye’ (population 10, 000 approx.); but also a 3-5 miles either side of the rail corridor comes to approximately a quarter of a million people plus through use and switch from other modes given choice for example.
In Brief: The ERTA have identified the Gloucester-Ross-on-Wye-Hereford rail link as a missing strategic rail link. It would combine a local, regional and inter-regional sustainable transit corridor for both passenger and freight movements sustainably.

What and where
·                    To rebuild the Gloucester-Ross-on-Wye-Hereford rail link with possible select intermediate stations
·                    The line diverges south west of Gloucester and heads northwards serving a vast area of natural outstanding beauty (ANOB) sandwiched between the Cotswolds and Forest of Dean.
·                    Current roads of A40, A48, B4224 and A49 for example parallel or criss-cross the railway
·                    The railway could bring rail services from London and locally Reading, Swindon and Gloucester to the corridor and onwards to Hereford, Worcester and Shrewsbury for example, bypassing and freeing up capacity elsewhere on the rail network, particularly Reading-Oxford-Leamington and enable an orbital link around Birmingham and the West Midlands.
·                    Free up capacity for more by rail with overall aggregate sustainable transport modal choice and switch.
·                    Ross-on-Wye is a major tourist location and destination and currently has no rail access, so suffers from land use parking demand, congestion and demand-supply issues; the railway would help alleviate, bring new flows of people, footfall and spend as well as an all year around feed.

Why and where
·                    Open up a large currently unserved area by rail from a variety of north and south portals
·                    Scope of reach and range by rail is London/Southampton through Reading, Swindon, Stroud and Gloucester to Hereford and thence places like Worcester, Shrewsbury and the North West ‘not via Birmingham’ and all in between for passenger and freight use.
·                    The line may have potential to source lineside freight in or out beit aggregates, farming, bulk, warehouse and other distributive services.
·                    It would be useful to have a local commute service serving new stations including Ross-on-Wye to places like Gloucester, Hereford, Cheltenham and further-afield as well as a cross-country or London Open Access or variety thereof services utilising the same tracks.

How and when
·                    What is required is firstly to try and get local councils to see the principal outline benefits from re-railing and to have them in turn support it in principle together with any other relevant quangos and parties.
·                    For a study to be commissioned to examine further the business case, environmental impact, engineering and overcoming options where any encroachments or blockages exist. Government funds are available to draw down upon towards costs of studies.
·                     Once case is made and agreement to support it further and as a coalition grows, to get Department of Transport (DFT), Network Rail GRIP and other support and permissions to proceed with building it. Ideally a 10-year timescale should be the maximum timescale from conception to delivery and reforms at all levels are being sought for by ERTA and others to make the processes and delivery schedules more in-keeping with the need for modal shift, environment benefits and a Climate Emergency.

Please object to this development and call on the Councils, the local MP and Government to protect the rail route and keep options open, not lock-in to a roads only, congested and polluted future: https://www.herefordtimes.com/news/17722078.ross-on-wye-rail-arch-to-be-demolished-for-homes/?fbclid=IwAR145PtTq0TXqL6FfcyLqxTKJvFw_6NuQrZU3Yk0wWTlcQ8WWdVqRaTBMU4

The English Regional Transport Association (ERTA) supports a rolling programme of local, conventional rail reopenings to rebalance our transport system and enable more people and goods by rail, more choice and less reliance on fossil fuel and roads-based transport default 'normatives' and to this end, planning must not be left to laissez-fare whim, but we need rail routes protected now and development tailored to keep options open. 

If we scupper through piecemeal development these contingency optiosn, we lock-in unsustainable and polluting lifestyles which are bad for our society and world. We applaud the Railway Reopenings Fund and recent announcements, but this must not be a one-off and whilst the £500 million is welcome, we note also a £32 billion road expansion funding from the Chancellor also! Clearly we have a long way to go before equity is the 'norm' not inequality. Alongside the rolling reopenings programme, we also need a route protection measure which gives incentives to Local Councils and other agencies to protect rail corridors and keep them as an option for re-railing. 

There must be carrot and stick incentives, protecting lands and deviation lands included, costs money, it is not a passive thing. Time stands still for no-one, yet from Bedford St John's, Don valley/Woodhead and now we have Gloucester - Hereford via Ross-on-Wye badly needing protection from encroaching development please.

I attach 2 brochures which I would welcome you to have a look at and give support through your channels to get the statute book to stem the tide of destruction and invest in our future transport and environmental needs please. 

I have looped the local MP's and also you, as these principle issues are happening across the regions. Please act now and feel free to keep in touch with our Vice Chairman, Mr Simon Barber who helps coordinate our Westminster Team. If we can secure MP support and they help us get councils to 'think again', there may yet be some hope or light at the end of the tunnel! Thank you.

Wednesday, 29 April 2020

Rail Vision and Plan for the West Midlands

Please click this link:
https://www.dropbox.com/s/6qlbsbka00q14g4/WestMidlandsMetroisationConcept-draft.pdf?dl=0

West Midlands Rail Executive (WMRE) have defined their long term service targets (2034-2047) and are "Starting work now to identify radical infrastructure change beyond High Speed 2 and Midlands Rail Hub". In the NR Chiltern Route study there is only one viable 'big' idea on how to deliver that service. At the very least there needs to be another viable 'big' idea so that effective evaluation can occur - hence developing this concept and document.
Target audience is decision makers, so some technical aspects have been simplified whilst still retaining what is hoped a good degree of accuracy.

Please send comments to Owen O'Neil - rail@oweno.info / 
07736 548 671

There is the West Midlands, The South Midlands and then East Anglia and better rail links between the two east-west are required to take on and alleviate roads. Bedford-Northampton would plug Bedford, Thameslink and East-West Rail into South Midlands and West Midlands via Northampton. Please join ERTA and help us realise this goal: https://www.ertarail.com/become-a-member-or-donate

Saturday, 25 April 2020

Battle to get Bedford Midland Station and St John's Box Right


1. The lands of the former engine shed (Ford End Road) should be used as a second booking hall with extra parking and a bus turn around and walkway to Platform 4 of Bedford Midland. Hurst Grove should be made one way going north to Winifred Road.
2. The old St John's Station site should be kept clear from development and a new cycle cum walkway from existing St John's Halt to Cardington Road should be implemented as a green corridor.
3. Lands are needed to straighten tracks between Danfoss and Bedford Midland for east-west rail access and ease pressure on Platform 1.
4. Better buses needed for Bedford Midland linking with Bus Station.
This plan could have waited until lock down if lifted. We have one chance to get on/off rail capacity right for the Bedford Midland area.

More thoughts - please respond to the plans and support our calls:


Somehow I feel that this type of thing could have waited until lock-down is over to let more people be included in the decision making process. I am not a NIMBY nor opposed to social housing per se or one of those people who think status quo or a bygone age needs harking back to. On the otherhand the ravages of destruction of heritage especially in the 1960's of which the original closures of local radial rail links was a contextual landscape part and not without impacts. Seeming piecemeal gains and developments must be put in a context. Yes, we need social housing and understandable rare urban landscape brown field does not come lightly and is opportune to help people in need and tick box stats.
However, I feel the following:

1. Bedford Midland and surrounds. With East-West Rail and surrounding areas, we are likely to see increasing numbers wanting to visit our town and centre and accessibility on and off the rails is a key aspect to consider. We need more capacity on numerous fronts:
a. Better Buses: Contracted services like all Grant Palmer Buses should be mandated to serve both the rail and bus station as an overall part of their routes. This would feed into and out of Bedford Midland Station hub and could also have a more orbital distributor network window of opportunity, meeting people with frequency from the station and delivering dollops of footfall and spend around the road system of the town centre ending up at the Bus Station or enabling people to ride on from the Bus Station on one ticket to wherever. Get this sorted with GP and Stagecoach may blink also.
b. More parking. Land around the station is needed for a variety of purposes. Infilling for housing only is short sighted here. Long established Town Planning sees that you have mixed developments of all pockets and none housing with adequate facilities built into the new community including cycle network extensions off road too (see MK Redways as one example). Alas, like Biddenham, we have masses of semi and detatched upwards of £300k housing, few social housing if any and poor facilities except those around the bypass more likely than not necessitating a drive - more traffic and pollution! The former loco shed in Ford End Road should be turned into a second booking office with parking and a bus turn around/coach park down to the river. You could take Dallas Road off Kempston Road and have a southern direct one-way road feed to it with new single lane road and cycle/pedestrian access over the river cutting the loop via Prebend Street with delays aplenty. This could be for station users only and/or a through minor road one-way to Ford End Road. You could have station access walk/cycle path shared under spare railway arch to link with Platform 4. St Albans have an exit only one side - we can do more here. Hurst Grove could be made one-way towards Winifred Road (buses excepted contraflow with cycle access) to help commuters get a quick get-away to Bromham Road, west side of A4280 Bridge for bypass and diaspora. If this ideas was a success, you could expand the parking from old loco site to former Gas Works flat land site. This in turn alleviates Prebend Street/Ashburnham Road, which will be more used than ever given growth of demand and supply of more trains accessing the station interfaces?
c. Station North of Bedford. Some have mooted Lower Farm Road Bromham for development and a location for a possible station. This seems short sighted. Despite the Bypass, we in normal times, still see loads of vehicles going through the village to and from Oakley and Stevington and vice versa from (presumably) off the M1-A6 span? It would be far better to locate a station either north of Lovell Road Oakley with access off the A6 Bypass or at Sharnbrook or both. I think Bromham is big enough as a self contained unit and any expansion should consider elsewhere.
2. The old Bedford St John's Station site: Proposed for housing, but wait a minute. Whilst the new route goes north of Bedford to Tempsford and Cambridge, the corridor from St John's Station to Cardington Road should be reclaimed as a urban recreational centre for locked-in local streets and children/families to have a play area. Nearest is Jubilee Park, across busy roads. You could as a part of this conservation cum park area have a cycle cum footpath from the southern end of the current St John's Halt around the corner to this park and onwards to link with Cardington Road for Tesco and the Sustrans Route to Sandy for example as well as the wider Embankment interface. In return this 'off road' safe green corridor to the halt for trains and wider travel. If you destroy this option for a quick-gain stats and social housing agenda - laudable as intrinsic that is, we risk throwing the baby out with the bathwater and once done, cannot be undone, locking in poverty and dysfunctionality and throwing away part of our heritage/a green corridor option. Rope Walk had its cycle share sign removed a few years ago, it is a dangerous crossing at St John's Roundabout coming from/going to Ampthill Road for example and so a safer cycling option is required and we have a route for it potentially. I am sure an accommodation could be done with Stagecoach and also ground level access to the London Road shopping mall accessible only by road principally off opposite Elstow Road where B&M and Dunelm were to be found.

If you feel I am making any sense, please intervene and give support. We need to see tracks between St John's/Danfoss and Bedford Midland straightened and capacity of double track fostered to alleviate more trains than can be accommodated at Bedford Midland Platform interfaces. Yes, remodel the station by all means. Could we learn from Northampton where they have a corner entrance and booking hall off street level with links to over the rails footbridges/lifts (and possible escalators?) to platforms or could do in our case? Such a booking hall could be close to Ford End Road Bridge, looking down Midland Road to and from the Town Centre. Think if you will, someone disabled, elderly, frail or unfamiliar - presented currently with just 2 buses and hour (NO. 41) and/or a 10 minute walk to the Bus Station (all weathers and time of year) and to get to Nat West/High Street a 15+ each way walk. It is not encouraging, it is unacceptable and we need also to see Midland Road as a East-West High Street/Gateway/Showpiece 'welcome to Bedford' luring to wider town proliferation, discovery and search. I suggest we make it pedestrianised more with wider pavements and cycle lanes with buses only and deliveries confined to certain times with trees and benches to brighten it up. Footfall and spend can sustain businesses and they in turn can forge their own investment plans/make a wider contribution.

Finally, could we think about the former iron railings of former Allens Ford End Road Bridge-Hurst Grove area. They need ivy and trees pruned back, a wire brush, under coat and painting to look smart. Our industrial heritage, we have a wealth of iron railing styles around the town and could inform an information board as well as a town centre industrial landscape walk possibly. Another attraction with associated footfall, spend and visitorship/learning curves and greater appreciation of our industrial past. Not a big spend, but a quick gain, with links from both the bus and rail station. Thank you.

planningpolicy@bedford.gov.uk on the plans and richard.erta@gmail.com ERTA related.


The old St John's site and corridor needs to be protected to keep options open, not built on with housing estates. Please support this if you wish. 
If we lose the access and the northern route from Bedford-Tempsford proves too expensive or problematic for other reasons, with the traditional route, apart from 2 level crossings and a raising of the bypass (A421) from whence slightly to the left going east, crossing the river twice, following Great Ouse corridor north of Blunham Grange to Tempsford, you could have the junction arrangement not another station for reasons already given.

After that fine whatever but we do need to evaluate the southern route above as a fall-back, not scupper it like at Sandy has been done, a folly!



Richard,
Thank you for your comments and for your interest in the development briefs. As you may already know we now have a website hosted by our consultants HTA specifically for the development briefs and the link to the website is below.

The presentations given at the virtual presentations held on 5th and 6th May are included on the site and the write up of comments and questions will be published shortly. https://bedfordspd.htadesign.co.uk

Please also find  below links to survey monkey questionnaires which have been developed for both sites. The surveys will be available until May 29th.
Ford End Road
South of the River

If you have any further comments relating to the project, please email
 planningpolicy@bedford.gov.uk or use the contact form on the website.



Carolyn Barnes
Senior Planner
Planning Policy

Bedford Borough Council
Borough Hall
Cauldwell Street
Bedford Borough Council
MK42 9AP

Tel 01234 718568
Ext 47568


Dear Carolyn Barnes,

Thank you for your email dated 7th May with its connections and details. I deeply regret that the old St John's area is under threat of development whilst I have sympathy that the Borough is under pressure to provide social housing and use any available brown field sites for redevelopment where lands are scarce in an urban context.

I believe that whilst I empathise with the demand for using brown field sites for infill social housing, I suggest that these railways lands should be better deployed for rail purposes and thus protected from encroaching development. As per my original emails:

1. Land North of Bedford River Ouse/West of Bedford Midland should be a second booking hall and parking with walk-way cum cycle way to access the main station via Platform 4. 

2. St John's Station site and down to Cardington Road, should be turned into a rail 12 coach siding maybe with a washer facility as current only caters for 8 coaches contrast 12 formations now in operation. Tailor development and keep the eastern rail corridor approach open as a fall-back in case the northern east-west rail route does stall for whatever reason and indeed will have new objections and obstacles to over come which with gradients may be as costly than origional route with deviation east of A421 Bypass around Willington and to the north of Blunham to Tempsford on the flat on raised embankment. 

Folly to build housing at Tempsford on a flood plain around a station blocking the land which could be used for physical junctioning informing a Peterborough/Stevenage/Cambridge through route to Bedford and the whole Oxfordbridge Arc.

If we throw it away, we lock out and lock in at one and the same time. Likewise the need to straighten and raise speeds of a twin track solution to approaches to Bedford Midland configurated station platform interfaces from the Bedford-Bletchley railway, currently 10 mph and very curvey/single track - will mean a bottleneck of about 1 mile when the wider railway and service diversity opens it up. 

We need to plan and phase redesign now going forward, not wait until 2024 and then realise retrospective issues unaddressed. Once lost, like Sandy there is no going back and if the northern route fails, then orbitals of Bedford is the only fall-back option.

Meanwhile, I would ask the Borough to re-study the Retail Park, Kempston for a new station to put Kempston Town on the Bedford-Oxford line reach and range as well as linking it and the town centre by rail. Studies 20 years ago suggested such a station could generate an extra 100 off-peak users per day to the local rail service, when it runs and that I would have thought would be a gain? Likewise, if people spend time of some 20 minutes queueing to get across Prebend Street to pay to park to then await a train to Cambridge, might they not be tempted to drive direct via the bypass and other upgraded roads the Borough has also campaigned for? A Retail Park Station could have some expanded parking and a footbridge off of Southfields Road Kempston and that would reduce congestion into Bedford in all cases. The new station would also allow visitorship and employment vacancies to be filled more in the Kempston and surrounds areas as well as part of a leisure package centred on the local rail link and services.

If you want any more information, engagement or exploration with me please do contact me. 

Yours sincerely,


Richard Pill
ERTA Chairman


Dear Friends and Colleagues,

May be of interest to some of you (photo of site attached) and for more on it please click this link and scroll down to 



for more details including objections where to send, developers and council planning officer details. You can object, you can comment, you can take the surveys and give us and the site support to be kept and explored for use as and for a railway purpose not built on and lost forever!

Even with a new rail link to Tempsford and Cambridge north of Bedford, is still a long way off, will face it's own blockages and oppositions and is not plain sailing by any means. We therefore think we need to keep options open and look at contingency here.


The old St John’s Station site in Bedford, taken amazingly from a moving train in the 1980’s.

It is even more amazing (and sad) that the site was not considered for other railway purposes before demise in 1984 when Bedford-Bletchley services moved into Bedford Midland or in the 36 years interim, even with an east-west consortium!

Now we have 12 coach Thameslink trains and an 8-coach length washer siding, could a 12-coach washer facility be put on the old site down to Cardington Road? Off through tracks, plenty of space and by default keeps this eastern access corridor open. Given the old route was double track, could a fenced off second half be used as a pedestrian cum cycle way from the 1984 St John’s Halt to Cardington Road to join the Sustrans old trackbed route to/from Sandy? Indeed, given 2024 we have Oxford-Bedford rails restored with services, could you not reinstate the old triangle using auto points and have a run-around for steam and other ‘specials’ south of Leicester or east from Didcot or Quainton Road for example based on Bedford as ‘leisure line’?

Alas, none of these possibilities have been realised or flagged up or considered. Rail industry shows no leadership or vision, council wants every bit of urban brown field for development and that it seems is the way this rail corridor and piece of land will go – lost forever to rail purposes, more cars on the road and a very poor deal for cyclists trying to get from the cycle path in Ampthill/Victoria Road to the Embankment via Ampthill Road Bridge and Rope Walk for example. It is a nightmare with busy roads and plenty of pollution. No green spaces. Could the St John’s site have been a conservation cum parkland with the cycle-walk way facility integrated? Alas, none of this seems in the minds of our industry, developers or leaders and we are poorer for it as development without sustainable infrastructure and green spaces is a recipe for locked-in dysfunctionality.


Please get engaged and write, email and take a look-in, as this could be our last chance here and need to keep options open. 

Yours sincerely,



Richard Pill
ERTA Chairman




Below, some diagrams to assist with what we would welcome as a Plan B/contingency to keep 'open' if other options fall down or prove too costly or protracted.