Sunday, 10 December 2023

New Stations example and our tabling opportunities to work together

14-12-23

Some of you may be interested in this: https://enroutecic.com/wp-content/uploads/2023/12/Two-towns-multiple-approaches-Observations-from-Daventry-Rushden-1.pdf

ERTA supports a number of new stations, but we can't just keep adding to existing networks, we need more tracks and reopenings for more stations to engage wider audiences. 

Please see:

Please note that as far as Stations North of Bedford go, our Wellingborough and Beds Forum respectively are two meetings to tap into. Identifying and protecting a site for a station is critical and working out the 3-5 population catchment distance likewise. 

Ampthill (Thameslink), Kempston (London North Western Train Operating Company) and Sharnbrook, Irchester, Desborough and Kibworth would be East Midlands Electric shuttle service between Bedford and Leicester on the slow lines and if Bedford-Bletchley was electrified could run semi-fast to Bletchley and likewise to Watford (especially peak time)? Let us have your feedback. Note, we do not support Northampton-Wellingborough as too far gone and Finedon and Burton Latimer, may have a case, but would they detract from the close proximity of Wellingborough and Kettering?

On the Corby issue, we are pleased the electrified railway is being used and would like to see a study into Melton Mowbray-Nottingham to see how the old railway could link that way to the East Midlands to free up more capacity through Leicester for passenger and more freight trains by rail? Corby-Nottingham was once part of the Midland Main Line, serving Rutland areas and connecting with Peterborough-Leicester services for example.

Maybe an all encompassing study or series of studies could look at scope and tell powers that be what we would like and seek less costly and bureaucratic means and ways to achieve successful outcomes of more and better railways? It can be done. Fast trains remain on fast lines, however feeder stations and local services being restored, could provide a handy parking capacity expansion and more overall rail usage, cutting associated roads-only congestion in some cases.

Thursday, 7 December 2023

Archive Call Appeal from 07-12-23

Archive Call Appeal: Richard Pill has files and other archive of the former ERTA and previous BRTA eras (going back 20+ years) and would love them to go to a good home. Likewise, some dry, safe storage of old magazines and stock for selling on-line or teaming up to cover sales stalls would be welcome to entertain asap please. 

Contact Richard Pill with enquiries via richard.erta@gmail.com or phone him (see front page for details). It will be junked if no interest is forthcoming sadly. Plastic containers provided, but must have own transport.

Tuesday, 5 December 2023

ERTA Supports Electrification of the Peterborough-Spalding-Doncaster Rail Link and associated bigger picture of where the trends are pointing!

06-12-23 Coming the other way, Southampton-Oxford-ECML-Doncaster cannot happen without more track connectivity at design stages and capacity with spades on the ground now and going forward: 

Got this article in a rail freight publication. I did send a second draft correcting a typo or two, but the original was done instead! However, I hope it makes some salient points and we welcome any support.



re: https://www.spaldingtoday.co.uk/news/major-report-reveals-ambition-to-electrify-railway-line-9342791/


4 December 2023

Press Release

 

ERTA Supports Electrification of the Peterborough-Spalding-Doncaster Rail Link and associated bigger picture of where the trends are pointing!

 

Re: https://www.spaldingtoday.co.uk/news/major-report-reveals-ambition-to-electrify-railway-line-9342791/

 

ERTA supports calls for electrifying the Peterborough-Doncaster line. More freight by rail is increasingly on the agenda across the whole network and in an environmental context makes more sense if only we have a more joined-up and comprehensive infrastructure.

 

It is ERTA’s view that we were calling for this before the Pandemic alongside a study into a new-build March-Spalding rail link. Development blight on old railway corridors should be seen as unacceptable and poor stewardship and Councils and Governments who permit such when there is a growing demand for rail-usage generally should pay compensation commensurate to what needs relocation to enable a rail link to get through.

 

Moreover, electrifying Peterborough-Doncaster makes more sense if:

1.      If Felixstowe-Peterborough is also electrified as that is where a lion’s share of freight comes and goes to and from.

2.      The East Coast Main Line/ECML lacks capacity between London and Peterborough that also needs a review and capacity enhancements to enable more.

 

End Press Release

 

Media Comment: Richard Pill ERTA CEO 01234 330090 or richard.erta@gmail.com

Mobile: 07752 096392

Wednesday, 22 November 2023

Oxford-Witney Rail Reopening-New-Build Let's have it now!

re: Bring it on! Oxford-Witney rail reopening. Cheap at the price, given all the on-off rail benefits such may inform. ERTA has long called for it.

Now Lord Cameron alias 'Dave' has come back to Cabinet, maybe as a local he can be persuaded to advocate for this reopening: 
This terminal branch as such, is one of many likewise which would bring enormous social benefit to the people of Witney and surrounds by providing a rail alternative to the busy A40 and reduce congestion to and from Oxford along the corridors it would intersect. Elsewhere Croxley near Watford, Bridport, Padstow and many other coastal areas also need re-railing. 
Cannot do them all, but a top 10 in a decade would inform more all-year-round footfall and spend and help sustain jobs and the local economy. Please write to your MP and call on the Government to see this is a case of 'a stitch in time saves 9'! 
There are many who rubbish local rail reopenings, so-called 'professionals' amongst the mix. However, most rail reopenings have exceeded expectations and there's no reason why this and others similarly would not and saves road wear and tear too. 
Our railways are fixed assets and so medium-long term benefits grow as flows follow what transport is available. Please give us your support.
 Join ERTA and help make our voice stronger: https://ertarail.co.uk/become-a-member/ Thank you.
Devon proves it... local rail reopenings are the way to go and investment should be made to be available to inform x nationwide more: https://www.bbc.co.uk/news/uk-england-devon-67484900

Sunday, 29 October 2023

Northampton2Market Harborough (N2MH) Rail Link - a call to action!

03-02-24
BRTA Northampton Working Group Meeting (to be held Saturday 10 February) will be held at the Northampton Quakers in the Emmeline Davies Room (upper floor), Quaker Meeting House, Wellington St, Northampton NN1 3AS 2-4pm business https://www.quaker.org.uk/contact-us Main contact: Mr Simon Barber BRTA T: 0208 940 4399   E: simon4barber@gmail.com
Agenda:
1.     Apologies for absence
2.      Northampton-Market Harborough (N2MH) (introduction and where things are at with Professor Andrew N. Williams Patron and Officer of ERTA
3.      What needs doing? Compilation of a list/brain storming,
4.      Who is prepared to cover what – genuine and reliable offers only
5.      Cycle/leisure interests as well as itself (being green transport option)/route protection needed
6.       Market Harborough – land west of Midland Main Line – ensuring development does not scupper what the railway needs to duck under Midland Main Line.
7.      Brixworth - 10,000 houses
8.      Northampton Station – more platforms and track/redesign needed and the twin northern bays interim usefulness.
9.      Brackmills Branch connectivity and role (including St James Mill Link Road)
10. 6-tracking Bletchley-Milton Keynes
11.Capacity through Leicester creation
12.Getting more public support
13.Any Other Related Business
14.Date of next meeting: suggest the same place ant format and meet thrice yearly (May)
 
Note: Public Meeting at Market Harborough details/all welcome: BRTA Market Harborough Public Meeting – Saturday 16 March – 12pm food and 2-4pm business Lunch Venue: The Sugar Loaf, 18 High Street, Market Harborough, Leicestershire LE16 7NJ W. https://www.jdwetherspoon.com/pubs/all-pubs/england/leicestershire/the-sugar-loaf-market-harborough Agenda: 1pm set-up, 2-4pm business and vacate by 5pm. Meeting Venue: Market Harborough Methodist Church/Hall, Northampton Road, Market Harborough, LE16 9HE www.harboroughmethodistcircuit.org

T: 01858 -467666/ 01858-462077 All others: https://ertarail.co.uk/events/

17-01-24

What provision if any for the railway to be rebuilt, road to go over or under railway? We need rail-care now, not abandonment please!

We need your help and support via richard.erta@gmail.com

29-11-23 Bad News from West Northants Council - poor stewards of the rail agenda!

The planning reference numbers in regard to the Northampton North-West Relief Road is (Ref.No.19/00045/CCDFUL) when it was under the control of Northamptonshire County Council (developmentcontrol@northamptonshire.gov.ukand the person at that time was Peter Moor which was made in June 2020. This was their response:

   Please find attached a letter relating to the application 19/00045/CCDFUL: The construction of new roads (Northampton North West Relief Road) on land South of the A5199 Northampton Road between the Brampton Health Golf Centre and the River Nene, including two new roundabouts and links bridging over the River Nene to Brampton Land and over the Northampton loop of the West Coast mainline to connect with the Dallington Grange development at Land Off A5199 Northampton Road, Northampton.
 Kind Regards
 Development Control
 Northamptonshire County Council
 Planning Services
 NCC Place
 One Angel Square
 Angel Street
 Northampton NN1 1ED

Recommend you write to them and DfT and ask for the road proposal to be called in and for the railway to be supported? https://www.westnorthants.gov.uk/ and https://members.parliament.uk/government/department?DepartmentId=23

21-11-23 They are saying all the right things but fall short of specific advocacy and funding studies to make the case for rebuilding a Northampton-Market Harborough rail link - why? https://www.railfreight.com/railfreight/2023/11/21/uk-midlands-connect-spotlights-the-need-for-increased-regional-capacity/

Update on the ground - we need pro-affirma rail spades, not blocking tactics! 15-11-2023

Government issues housing demands to councils who then find land and seeks to build to meet quotas - not unlike fishing in the sea! The process means cheap land, non controversial land and using the demand to supply but making other compromises along the way, the political fix. NIMBYs don't want a railway, whilst many do see the strategic need and justification and studies indicate potential benefits on and off the tracks if we do reopen. Bedford-Northampton had that development adjacent to Delapre Abbey, whilst not on the trackbed, leaves no room for a full-bodied electrified railway and objections of trains in close proximity does not stretch imagination.
Now we see similar tactics on Northampton-Market Harborough (N2MH), whereby the sacrifice of the railway corridor based on either a belief it can never reopen or a determined will not to reopen is the political fix of what we appear to be dealing with as far as Northamptonshire and elsewhere informs.
I would urge you to please write to West Northants Council and object and write in favour of the railway which could balance demands for development with sustainability issues. Block the line and you have development without better public transport and congestion unadulteratedly grows and proliferates and Northampton's air pollution is amongst the worst in the country.
So please:
3. Work with ERTA and join if not a member, informing our fighting fund more/donate: https://ertarail.co.uk/become-a-member/
6. England's Economic Heartlands - fine talk is easy, gritty issues blocking railway corridors or making reopening harder, is exactly what we need going forward whilst making the case/further studying credentials justifying efforts to nurture policies for a railway x nationwide elsewhere too: https://www.englandseconomicheartland.com/
7. Your local MP, can he/she have a word with the Northampton MP's and get them suitably actioning efforts for the railway more?https://members.parliament.uk/members/commons
Scroll up, scroll down and please don't accept defeat. ERTA is organising a Working Group and making progress is exactly what we need. The planting of housing and roads on trackbeds or prohibitively adjacent to rail requirement going forwards, is nonsensical from a social, economic and environmental stand point and in the interests of public health needs to be abated: https://www.bbc.co.uk/news/uk-england-northamptonshire-66939602
ERTA and my role is one of coordination and delegation. You are our voice to get things done principally on the ground. Please wade in and help us. Remember what we said about Christmas and Summer Holiday periods being time to bury bad news! 

Dear All,

I am pleased to say that our colleague Professor Andrew N. Williams has done sterling work to advance the cause  of a reopened Northampton-Market Harborough Railway. He managed to persuade his local MP to ask a question in the House of Commons (HOC) to which the Rail Minister gave the following reply:
"Answer:
Huw Merriman:
On behalf of sub-national transport body England's Economic Heartland, Network Rail previously prepared a feasibility study into reinstating a railway connection between the West Coast Main Line at Northampton and the Midland Main Line at Market Harborough. I encourage him to engage with England's Economic Heartland further on this.
The answer was submitted on 25 Oct 2023 at 09:46."

Therefore, we encourage people to write in support of the railway and similar ERTA supports - which is not every railway that ever was despite some detractors (!) - to make England's Economic Heartland aware of support for reopening the rail link and make a bee-line to their annual conference in Cambridge on 1st November see: https://www.englandseconomicheartland.com/
and work with Andrew (see cc) to multiply support especially as per your local MP where you live for example.
You can write to Huw Merriman MP Minister for Transport at the Department for Transport giving support to ERTA and our calls. Although not exhaustive, we call for:
1. The government (and ask opposition parties) for lists and commitment to an on-going programme of local, conventional rail reopenings, rebuilds and select new-builds x nationwide with all the benefits.
2. That the study -see https://ertarail.co.uk/elementor-1581/ - and whilst the list is not exhaustive, gives a flavour of what we are focusing on. Northants MP Andrea Leadsom whose constituency covers Brackley recently wrote in favour of a new Silverstone Station, whereas we call for a new Brackley East Station with connecting buses. I am unsure what connecting railway her station would be, but HS2 ruled it out ages ago and our suggestion is a new spur off the emergent Oxford-Bletchley rail link (East-West Rail) and via a new alignment parallel to HS2 alignment, have a new station to serve what is the growing area of Greater Brackley and cream off commuters from the busy dual carriageway A43 for example. Silverstone is part of the jigsaw, but hopefully such a line as a Phase 1, could go on to Rugby Central as a Parkway for access by rail to Oxford and Aylesbury for example with maybe another station in between as well. Little acorns, but expediency or for real, the MP's raised a pertinent point which at very least calls for a bluff to be called, or letters from constituents in support to get a study underway as to feasibility, which encompasses a multitude of things potentially.

We do need more members, donations and people offering to volunteer and help fill niches, support and help multiply our work and both quality and quantity. Making demands unless one is prepared to be part of the answer, is a vacuous thing, whereas we are stronger together in these endeavours.

Yours sincerely,


Richard Pill
ERTA CEO 


 

Thursday, 26 October 2023

ERTA Kempston Station Report and Campaign

I have been invited by Kempston Town Council to speak to their elected representatives on the matter pertaining to a new Kempston Station on the Bedford-Bletchley Line. It is 14th November 7.30pm Council Chamber - see

https://kempston-tc.gov.uk/contact/

There is a public gallery and supporters are both welcome and please also feel free to email/write in support to the Town Council as well. My report is freely available - email richard.erta@gmail.com for a pdf copy.

Kempston area stands to gain, with access to the Oxford-Bedford emergent rail corridor for multi-purpose rail-based access, footfall and spend/visitorship to Kempston sustaining local economy and well-being and as for the Retail Park, it is land-locked and so optimising more trade by non-car methods would surely be worth some interest for the wider operational good on and off the local roads which feed it? Capacity is what it is all about and this station and bridge would give more options and through ticketing, feed bus-rail via Orchard Street connections.

I would welcome your kind interest and support and maybe it can make more progress in the emergent theatre of opportunity. 20 years ago a study showed 100 extra users if the station was built, but at planning stages was defeated on the back of a handful but adamant opposition. I believe careful management could lend to dissipate that opposition and nurture widespread local support. Not having to drive into Bedford Midland and pay to park, would save time and money and free up congestion that bit more. Land to the west of footpath/bypass could be additional country-parklands and a connecting cycle way to Woburn Road Industrial Estate and Police HQ could all boost the role the rail-feed could play.

Ultimately on the Bedford-Bletchley line we would like to see longer trains and electrification infill for a semi-fast Watford-Bletchley-Kempston-Bedford-Corby through commuter service as well as Oxford-Bedford operations and the shuttle. I believe this station idea's time has come and it could be a boost and enable local people of Kempston to enjoy the benefits. Kempston has a diverse history and we should make more and celebrate it boosted by the new visitors the railway could inform.

Colour pdf reports available free on request via richard.erta@gmail.com





Wednesday, 18 October 2023

ERTA Bedfordshire Forum - All welcome! Tackling transport and public service issues in and around Bedford and Shire!

Dates of next Forums are listed here: https://ertarail.co.uk/events/

Instant Karma!

https://www.youtube.com/watch?v=xLy2SaSQAtA

As one goes about one's business, one observes as well. 
1. The disabled toilet at the Bus Station has been out of action 4 weeks now. This is a principal gateway to Bedford Town Centre. Other cubicle occupied or out of action. X5 is 2.5 hours to Bedford from Oxford, most out-of-town journeys 1 hour or 1.5 in the case of Northampton-Bedford No. 41. So having good working toilets properly stocked and serviced at the Bus Station is important for civilised values to be shared and adopted. Yes, after closure, there is nearby Pilgrims Progress, but not all will know that and whether to use a toilet scheme is still operational?
2. No. 21 Grant Palmer withdrawn. Had reliability issues but also if it served Bedford Midland as part of its over all journey, may have had more use as well. 
3. No. 8 Queens Park and Great Denham. 08.01 Monday, 08.41 Sunday. But is it too much to ask for a consistent clock face past the hour x per hour departing Bedford Bus Station and keep to it please? Ideally it could be half hourly. Loadings seem high with standing room only and an aging population. Buggies, wheelchairs and shopping bags on wheels take up precious space, but larger buses may find parked both sides of the room and careful maneuvers hazardous? Could Grant Palmer be contracted to do a Bedford Bus Station-Ford End Road - Old Ford End Road-Great Denham-loop Stagsden, Bromham and back or via Bromham Road, Ashburnham to serve the railway station and Midland Road to Bus Station? That would act as a relief and enable more buses and supplement the bi-hourly No. 41 gaps more locally. 
4. X5 loadings seem very healthy with sometimes every seat taken and 1 hour to wait if turned away. Is it time, post pandemic, to revisit a half hourly time table between 9am-6pm?
5. MK1 seems to be healthily loaded. When I think how some scoffed at the idea of extending the old Bedford-Luton bus to the airport, now it is booming usage wise! Could running Hitchin buses to loop round by the Hitchin Rail Station also boost overall usage?
6. No. 905 - could it loop round Longsands to serve St Neots Rail Station and vice versa - surely a gap and long walk in the dark currently between rail access and bus links. The town orbital is patchy, slow and useless. 905 regular and with plusbus style rail-bus ticketing would boost footfall mutually.
7. Town centre: Lurke Street Car Park used to have a mens and womens toilets with 4 cubicles and 4 space urinals (mens). Now reduced to one cubicle for all with a growing population and desire for more footfall via free parking to the town centre? People who park, visit, eat, drink need ample toilet access. Cost cutting here seems retrograde to what we are trying to achieve? Likewise Beales, Debenhams and M&S gone, lost toilet capacity there and basically town centre and Embankment, there's a dearth and some study or consultation should be done to see what people want and need. I think a toilet cubicle akin to Cambridge with baby changing facilities on lands north of the Butterfly Bridge may be prudent. Long walk from Cardington Road Tesco to Russell Park or Aspects to town centre... and food and drink is being consumed, we are trying to want people to come here and spend time enjoying the area?
8. Selfish plea, but again 53 Wootton service is used and Hillgrounds has no bus on a Sunday. Could something be done to restore a part-time 53 say 2 hourly or something? I used it to get to Grace Community Church Bedford which meets at the Addison, but there's the sports centres, open spaces and residential communities down there who should be served. They are all potential users and contributors.
9. Personally, I want a library service which is open to all, accessible 9-5 Monday - Saturday. I dislike pins and passwords culture, and feel also the staff need training to know what and where. How can we reduce cost and make the stack more accessible? Do we need a new, bigger central library? Maybe move Borough Hall to Debenhams and relocate the library at Cauldwell Street with a hotel and respite centre? What is the vision. Suffice to say I have been asked to queue when no one else was about, just to comply with the taped lineage. I feel the system is dumbed down and we need to nurture serious study and a culture of learning and growth, civic and personal life long development. Adult Learning has taken a tumble and on-line costs are prohibitive for low income people. Again, who is thinking about this?
10. Mill Street in brief:
a. buy and turn the former Howard Chapel into a walk-in community, civic, display, arts and gallery centre - it has pavement access. Mill Street needs revitalisation. Open the side passage from Ram Yard to Mill Street via Howard Chapel. We lost amenity when the Civic Theatre was closed. North-side pavement is too narrow for thoroughfare walking and window looking. Make road-way one-way from east to west and narrow like High Street, single lane. Make pedestrian and cycle friendly and encourage footfall with safe access for all. You can put solar panels on the roof for a bit more income.

Hope these ideas and feedback are not shot down, but considered. Chicken and egg, no buses, congestion fills the gap, add buses, congestion can modal shift more with incentives.

https://www.bedfordtoday.co.uk/news/people/bedford-is-the-4th-worst-traffic-hotspot-in-the-uk-according-to-new-research-4239867 

Next Forum - All Welcome. Bedfordshire Forum at The Swan Pub, Flitwick (opposite the railway station served by Thameslink: https://www.swaninnflitwick.co.uk/ Suggested Wednesday 24th January 2024. Enquiries welcome via richard.erta@gmail.com 

ERTA Bedfordshire Forum meets Wednesday 25th October 12 Noon food, 1-3pm business Upstairs, Costa Coffee, 20 Silver Street, Bedford, MK40 1SU All Welcome.

If you wish to join us, please notify Mr Simon Barber

T. 0208 940 4399
E. simon4barber@gmail.com
 
Key reference on-line portals are: https://ertarailvolunteer.blogspot.com/ (scroll down) and https://ertarail.co.uk/ (electronic joining/donating options).
Do nothing and it may not happen, do something and be part of the answer of whether it may!
Agenda:
1. Apologies for absence
2. Consideration of A Station serving the Retail Park, Kempston et al.
3. Consideration of the Ampthill Parkway Station Narrative doc and
discussion in the light of the issues raised
4. Consideration of Stations North of Bedford (Sharnbrook) -Bedfordshire only.
5. How best to take these projects forward?
a. What is needed – more members, volunteers, and team building
b. An on-going leaflet campaign - £100 gives x1000 flyers (Bedford and Kempston), £50 a shot (SNOB/Sharnbrook, Ampthill/Flitwick).
6. Existing Rail, Thameslink, East Midlands, Bedford-Bletchley, Station redesign.
7. East-West Rail Update and discussion
7. Better Buses, Pedestrian Issues and Cycle shared access/safety.
8. ERTA Needs
- Leafleting
- Funding
- Area rep and team of local support

9. Date, Time Place of Next Meeting: Bedfordshire Forum at The Swan Pub, Flitwick (opposite the railway station served by Thameslink: https://www.swaninnflitwick.co.uk/ Suggested Wednesday 24th January 2024. Enquiries welcome via richard.erta@gmail.com